← Back to H.R. 2347

H.R. 2347 · Full text

Bipartisan American Affordability and Jobs Act of 2026

Engrossed Amendment Senate · Nov 19, 2026 · 682,174 characters · Source on congress.gov →

[Congressional Bills 119th Congress]
[From the U.S. Government Publishing Office]
[H.R. 2347 Engrossed Amendment Senate (EAS)]

<DOC>

                  In the Senate of the United States,

                                                     November 19, 2026.
    Resolved, That the bill from the House of Representatives (H.R.
2347) entitled ``An Act to amend the Internal Revenue Code of 1986 to
exclude from gross income any damages, other than punitive damages,
received on account of any sexual acts or sexual contact.'', do pass
with the following

                               AMENDMENT:

             Strike all after the enacting clause and insert the
      following:

SECTION 1. SHORT TITLE; TABLE OF CONTENTS.

    (a) Short Title.--This Act may be cited as the ``Bipartisan
American Affordability and Jobs Act of 2026''.
    (b) Table of Contents.--The table of contents for this Act is as
follows:

Sec. 1. Short title; table of contents.

         DIVISION A--COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS

           TITLE I--NATIONAL ENVIRONMENTAL POLICY ACT OF 1969

            Subtitle A--Declaration of Environmental Policy

Sec. 1101. Purposes; procedure; savings provision.
Sec. 1102. Definitions.
Sec. 1103. Implementing procedures.
Sec. 1104. Cooperation of agencies; reports; availability of
                            information; recommendations; international
                            and national coordination of efforts.
Sec. 1105. Procedure for determination of level of review.
Sec. 1106. Timely and unified Federal reviews.
Sec. 1107. Programmatic environmental document.
Sec. 1108. Use of categorical exclusions by other agencies.
Sec. 1109. Applications for authorizations.
Sec. 1110. Judicial review.

              Subtitle B--Council on Environmental Quality

Sec. 1121. Council on Environmental Quality.

               Subtitle C--Federal Permitting Improvement

Sec. 1131. Definitions.
Sec. 1132. Environmental Review and Permitting Tracker.
Sec. 1133. Permitting Improvement Fund.
Sec. 1134. Limitation on claims for FAST-41 covered projects.

                       TITLE II--CLEAN WATER ACT

Sec. 1201. Water quality criteria.
Sec. 1202. Clean Water Act permitting and State certification.
Sec. 1203. Permit term for NPDES permits.
Sec. 1204. Permits for dredged or fill material.
Sec. 1205. Judicial review timeline clarity.

               TITLE III--ENDANGERED SPECIES ACT OF 1973

Sec. 1301. Definitions.
Sec. 1302. Timeline for Section 7 consultations.
Sec. 1303. Projects in the operational right-of-way.
Sec. 1304. State assumption of consultation responsibilities.
Sec. 1305. Judicial review.
Sec. 1306. Listing determinations.
Sec. 1307. Authorization of appropriations.
Sec. 1308. National Fish and Wildlife Foundation Coastal State Fund.
Sec. 1309. State wildlife action plans.

                      TITLE IV--PROJECT CERTAINTY

Sec. 1401. Maintaining Federal authorizations or permits for projects
                            with non-Federal sponsors.
Sec. 1402. Ensuring fairness for specific types of covered projects.
Sec. 1403. Avoiding unreasonable delays in permitting.

                   TITLE V--NUCLEAR ENERGY LICENSING

Sec. 1501. Updating Hearing Procedures.
Sec. 1502. Licensing of uranium enrichment facilities.
Sec. 1503. Applicability of deadlines to certain nuclear facilities.
Sec. 1504. Compensation authority for career appointees.

                 TITLE VI--OTHER ENVIRONMENTAL MATTERS

Sec. 1601. Wildfire emissions prevention.
Sec. 1602. Brownfields revitalization.

         DIVISION B--COMMITTEE ON ENERGY AND NATURAL RESOURCES

                     TITLE I--ELECTRIC TRANSMISSION

Sec. 2101. Transmission permitting.
Sec. 2102. Reconductoring and other activities in existing rights-of-
                            way.
Sec. 2103. Transmission planning.
Sec. 2104. Improvements relating to local transmission planning and
                            development.
Sec. 2105. Prohibition of right of first refusal.
Sec. 2106. Consolidated planning process.
Sec. 2107. Ratepayer protection.
Sec. 2108. Dispatchable energy systems market access.
Sec. 2109. Grid-enhancing advanced transmission technologies.
Sec. 2110. Expediting generator interconnection queues.
Sec. 2111. Grid data access.
Sec. 2112. Power marketing administrations.
Sec. 2113. FERC fee assessments.
Sec. 2114. Collection of data on computational load entities.
Sec. 2115. De novo review of civil penalties under the Natural Gas Act.
Sec. 2116. Transmission Organization governance.
Sec. 2117. Data Center Community Assistance Program.
Sec. 2118. Conforming amendments; savings provision.

                      TITLE II--ENERGY PERMITTING

                    Subtitle A--Accelerating Claims

Sec. 2201. Accelerating claims.

       Subtitle B--Federal Onshore Energy Leasing and Permitting

Sec. 2211. Permitting compliance on non-Federal land.
Sec. 2212. Modification of Tribal leases and rights-of-way across
                            Indian land.
Sec. 2213. Accelerating renewable energy permitting.
Sec. 2214. Electric grid projects.
Sec. 2215. Hardrock mining mill sites.

             Subtitle C--Geothermal Leasing and Permitting

Sec. 2221. Geothermal observation test projects.
Sec. 2222. Geothermal royalties.
Sec. 2223. Geothermal leasing reform.
Sec. 2224. Geothermal Ombudsman and Permitting Task Force.
Sec. 2225. No Federal permit required for geothermal activities on
                            certain land.
Sec. 2226. Effect of pending civil actions on processing applications
                            relating to geothermal leasing.
Sec. 2227. Cost recovery from geothermal leasing, permitting, and
                            inspections.
Sec. 2228. Publication of Gold Book for geothermal operations on
                            Federal land.
Sec. 2229. NEPA review.

                         Subtitle D--Hydropower

Sec. 2231. Identifying and removing market barriers to hydropower.
Sec. 2232. Certain conditions on issuance of licenses.
Sec. 2233. Hydropower maintenance and temporary adjustments.
Sec. 2234. Micro hydrokinetic energy projects.

                    Subtitle E--Hiring and Retention

Sec. 2241. Federal Energy Regulatory Commission staffing.
Sec. 2242. Federal Energy Regulatory Commission personnel safety.

                      Subtitle F--Offshore Energy

Sec. 2251. Offshore energy.
Sec. 2252. Offshore energy transmission.

       Subtitle G--Department of Energy Nuclear Transparency Act

Sec. 2261. Public announcement requirements for Department of Energy
                            actions relating to certain nuclear
                            facilities.

                    TITLE III--HISTORIC PRESERVATION

Sec. 2301. Historic preservation.
Sec. 2302. Funding for the Historic Preservation Fund; grants for
                            Tribal Historic Preservation officers;
                            additional funding.

            DIVISION C--SURVIVOR JUSTICE TAX PREVENTION ACT

Sec. 3001. Exclusion from gross income of any damages, other than
                            punitive damages, received on account of
                            sexual acts or sexual contact.

         DIVISION A--COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS

           TITLE I--NATIONAL ENVIRONMENTAL POLICY ACT OF 1969

            Subtitle A--Declaration of Environmental Policy

SEC. 1101. PURPOSES; PROCEDURE; SAVINGS PROVISION.

    Section 2 of the National Environmental Policy Act of 1969 (42
U.S.C. 4321) is amended--
            (1) by striking the section heading and designation and all
        that follows through ``are: To declare'' and inserting the
        following:

``SEC. 2. PURPOSES; PROCEDURE; SAVINGS PROVISION.

    ``(a) Purposes.--The purposes of this Act are--
            ``(1) to declare'';
            (2) in subsection (a) (as so designated)--
                    (A) in paragraph (1) (as so designated), by
                striking ``to promote'' and inserting the following:
            ``(2) to promote'';
                    (B) in paragraph (2) (as so designated), by
                striking ``to enrich'' and inserting the following:
            ``(3) to enrich''; and
                    (C) in paragraph (3) (as so designated), by
                striking ``to establish a Council on Environmental
                Quality'' and inserting the following:
            ``(4) to establish a Council on Environmental Quality'';
        and
            (3) by adding at the end the following:
    ``(b) Procedure.--This Act prescribes a procedure by which Federal
agencies shall consider and inform the public about the reasonably
foreseeable environmental effects of major Federal actions on the human
environment of the United States, the result of which shall be an
informational document for the purposes of consideration in Federal
decisionmaking.
    ``(c) Savings Provision.--Nothing in this Act mandates a particular
outcome as a result of the use of the procedure described in subsection
(b).''.

SEC. 1102. DEFINITIONS.

    (a) In General.--The National Environmental Policy Act of 1969 is
amended by inserting after section 2 (42 U.S.C. 4321) the following:

``SEC. 3. DEFINITIONS.

    ``In this Act:
            ``(1) Agency cerpo.--The term `agency CERPO' means the
        chief environmental review and permitting officer of each key
        permitting agency, as appointed by the head of the key
        permitting agency.
            ``(2) Authorization.--The term `authorization' means any
        lease, right-of-way, easement, license, permit, approval,
        finding, determination, or other administrative decision issued
        by a Federal agency or any interagency consultation that is
        required or authorized under Federal law to implement a
        proposed agency action.
            ``(3) Categorical exclusion.--The term `categorical
        exclusion' means a category of actions that a Federal agency
        has determined, or Congress has deemed by statute, normally
        does not significantly affect the quality of the human
        environment, within the meaning of section 102(2)(C).
            ``(4) Chairman.--The term `Chairman' means the Chairman of
        the Council.
            ``(5) Cooperating agency.--The term `cooperating agency'
        means any Federal, State, Tribal, or local agency (including a
        county, borough, parish, city, and any other political
        subdivision of a State) that has been designated as a
        cooperating agency under section 107(a)(2)(A).
            ``(6) Council.--The term `Council' means the Council on
        Environmental Quality established by section 202.
            ``(7) ENEPA technologies.--The term `eNEPA technologies'
        means digital tools, applications, and other technological
        capabilities used by agencies to support the responsibilities
        of the agency with respect to environmental review or other
        types of authorizations.
            ``(8) Environmental assessment.--The term `environmental
        assessment' means an environmental assessment prepared under
        section 106(b)(1)(A).
            ``(9) Environmental document.--The term `environmental
        document' means an environmental impact statement, an
        environmental assessment, or a finding of no significant
        impact.
            ``(10) Environmental impact statement.--The term
        `environmental impact statement' means a detailed written
        statement that is required by section 102(2)(C).
            ``(11) Environmental infrastructure program or authority.--
                    ``(A) In general.--The term `environmental
                infrastructure program or authority' means a program or
                authority of the Secretary of the Army to provide
                assistance to a non-Federal interest for carrying out
                civil works water-related environmental infrastructure
                or environmental assistance and resource protection and
                development projects.
                    ``(B) Inclusions.--The term `environmental
                infrastructure program or authority' includes--
                            ``(i) section 1113 of the Water Resources
                        Development Act of 1986 (Public Law 99-662; 100
                        Stat. 4232; 110 Stat. 3719, 136 Stat. 3781; 138
                        Stat. 3161);
                            ``(ii) section 217 of the Water Resources
                        Development Act of 1992 (43 U.S.C. 390h-4 note;
                        Public Law 102-580);
                            ``(iii) section 218 of the Water Resources
                        Development Act of 1992 (43 U.S.C. 390h-5 note;
                        Public Law 102-580);
                            ``(iv) section 219 of the Water Resources
                        Development Act of 1992 (Public Law 102-580;
                        106 Stat. 4835);
                            ``(v) section 220 of the Water Resources
                        Development Act of 1992 (Public Law 102-580;
                        106 Stat. 4836);
                            ``(vi) section 313 of the Water Resources
                        Development Act of 1992 (Public Law 102-580;
                        106 Stat. 4845);
                            ``(vii) section 324 of the Water Resources
                        Development Act of 1992 (Public Law 102-580;
                        106 Stat. 4849);
                            ``(viii) section 340 of the Water Resources
                        Development Act of 1992 (Public Law 102-580;
                        106 Stat. 4856);
                            ``(ix) section 522 of the Water Resources
                        Development Act of 1996 (Public Law 104-303;
                        110 Stat. 3766);
                            ``(x) section 531 of the Water Resources
                        Development Act of 1996 (Public Law 104-303;
                        110 Stat. 3773);
                            ``(xi) section 552 of the Water Resources
                        Development Act of 1996 (Public Law 104-303;
                        110 Stat. 3779);
                            ``(xii) section 566 of the Water Resources
                        Development Act of 1996 (Public Law 104-303;
                        110 Stat. 3786);
                            ``(xiii) section 584 of the Water Resources
                        Development Act of 1996 (Public Law 104-303;
                        110 Stat. 3791);
                            ``(xiv) section 569 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 368);
                            ``(xv) section 570 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 369);
                            ``(xvi) section 571 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 371);
                            ``(xvii) section 573 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 372);
                            ``(xviii) section 592 of the Water
                        Resources Development Act of 1999 (Public Law
                        106-53; 113 Stat. 379);
                            ``(xix) section 593 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 380);
                            ``(xx) section 594 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 381);
                            ``(xxi) section 595 of the Water Resources
                        Development Act of 1999 (Public Law 106-53; 113
                        Stat. 383);
                            ``(xxii) section 528 of the Water Resources
                        Development Act of 2000 (Public Law 106-541;
                        114 Stat. 2657);
                            ``(xxiii) section 542 of the Water
                        Resources Development Act of 2000 (Public Law
                        106-541; 114 Stat. 2671);
                            ``(xxiv) section 5039 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1206);
                            ``(xxv) section 5061 of the Water Resources
                        Development Act of 2007 (Public Law 110-114;
                        121 Stat. 1215);
                            ``(xxvi) section 5065 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1217);
                            ``(xxvii) section 5074 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1223);
                            ``(xxviii) section 5082 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1226);
                            ``(xxix) section 5085 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1228);
                            ``(xxx) section 5113 of the Water Resources
                        Development Act of 2007 (Public Law 110-114;
                        121 Stat. 1237);
                            ``(xxxi) section 5130 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1247);
                            ``(xxxii) section 5138 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1250);
                            ``(xxxiii) section 5140 of the Water
                        Resources Development Act of 2007 (Public Law
                        110-114; 121 Stat. 1251);
                            ``(xxxiv) section 8319 of the Water
                        Resources Development Act of 2022 (Public Law
                        117-263; 136 Stat. 3784);
                            ``(xxxv) section 8353 of the Water
                        Resources Development Act of 2022 (Public Law
                        117-263; 136 Stat. 3800);
                            ``(xxxvi) section 8359 of the Water
                        Resources Development Act of 2022 (Public Law
                        117-263; 136 Stat. 3802);
                            ``(xxxvii) section 1332 of the Water
                        Resources Development Act of 2024 (Public Law
                        118-272; 138 Stat. 3145);
                            ``(xxxviii) section 1340 of the Water
                        Resources Development Act of 2024 (Public Law
                        118-272; 138 Stat. 3149);
                            ``(xxxix) section 1344 of the Water
                        Resources Development Act of 2024 (Public Law
                        118-272; 138 Stat. 3153);
                            ``(xl) section 1348 of the Water Resources
                        Development Act of 2024 (Public Law 118-272;
                        138 Stat. 3157);
                            ``(xli) section 1349 of the Water Resources
                        Development Act of 2024 (Public Law 118-272;
                        138 Stat. 3158); and
                            ``(xlii) any other similar program or
                        authority that the Secretary of the Army
                        determines to be appropriate.
            ``(12) Environmental review.--The term `environmental
        review' means the agency procedures and processes for preparing
        an environmental document for a proposed agency action under
        this Act.
            ``(13) Finding of no significant impact.--The term `finding
        of no significant impact' means a determination that a proposed
        agency action does not require the issuance of an environmental
        impact statement.
            ``(14) Indian tribe.--The term `Indian Tribe' has the
        meaning given the term in section 4 of the Indian Self-
        Determination and Education Assistance Act (25 U.S.C. 5304).
            ``(15) Key permitting agency.--
                    ``(A) In general.--The term `key permitting agency'
                means a Federal agency that commonly engages in
                environmental review or other types of authorizations.
                    ``(B) Inclusions.--The term `key permitting agency'
                includes--
                            ``(i) the Department of Agriculture;
                            ``(ii) the Department of Commerce;
                            ``(iii) the Department of the Interior;
                            ``(iv) the Department of Energy;
                            ``(v) the Department of Transportation;
                            ``(vi) the Department of Defense;
                            ``(vii) the Environmental Protection
                        Agency;
                            ``(viii) the Federal Energy Regulatory
                        Commission;
                            ``(ix) the Nuclear Regulatory Commission;
                            ``(x) the Department of Homeland Security;
                            ``(xi) the Department of Housing and Urban
                        Development;
                            ``(xii) the Corps of Engineers;
                            ``(xiii) the Advisory Council on Historic
                        Preservation; and
                            ``(xiv) any other Federal agency, as
                        determined by the Chairman.
            ``(16) Lead agency.--The term `lead agency' means, with
        respect to a proposed agency action--
                    ``(A) the Federal agency that proposed such action
                under section 107(a)(1)(A)(i);
                    ``(B) the Federal agency designated under section
                107(a)(1)(A)(ii);
                    ``(C) the Federal agency designated by the Chairman
                under section 107(a)(1)(B)(ii); or
                    ``(D) a State or Tribal government agency
                conducting an environmental review of such action
                pursuant to authority granted under Federal law.
            ``(17) Made public; make public.--The terms `made public'
        and `make public', with respect to a document, mean that the
        document is published in a single location on the primary
        website of the applicable Federal agency with--
                    ``(A) hyperlinks to the document prominently
                displayed on the website; and
                    ``(B) the date of initial publication of the
                document displayed and maintained on the website.
            ``(18) Major federal action.--
                    ``(A) In general.--The term `major Federal action'
                means a proposed agency action subject to the
                requirements of this Act that the agency carrying out
                the proposed agency action determines is subject to
                substantial Federal control and responsibility.
                    ``(B) Exclusions.--The term `major Federal action'
                does not include--
                            ``(i) a proposed agency action associated
                        with a non-Federal project or undertaking--
                                    ``(I) with no or minimal Federal
                                funding;
                                    ``(II) with no or minimal Federal
                                involvement where a Federal agency
                                cannot control the outcome of the
                                project or undertaking; or
                                    ``(III) for which the only Federal
                                involvement is a loan guarantee or
                                loan, excluding assistance under
                                chapter 6 of title 23 or chapter 224 of
                                title 49, United States Code;
                            ``(ii) funding assistance solely in the
                        form of general revenue-sharing funds which do
                        not provide Federal agency compliance or
                        enforcement responsibility over the subsequent
                        use of such funds;
                            ``(iii) grants (including capitalization
                        grants), cost-share awards, or other forms of
                        financial assistance where a Federal agency
                        does not exercise predominant control and
                        responsibility over the subsequent use of such
                        financial assistance or the environmental
                        effect of the action;
                            ``(iv) any proposed agency action,
                        including any Federal permit, license,
                        easement, right-of-way, lease, or other
                        approval or authorization for a project, that
                        is--
                                    ``(I) for the deployment of a
                                broadband service (as defined in
                                section 60102(a)(2) of the
                                Infrastructure Investment and Jobs Act
                                (47 U.S.C. 1702(a)(2)) provided to end-
                                user locations through wireline
                                facilities;
                                    ``(II) on a previously analyzed
                                right-of-way; and
                                    ``(III) funded in whole or in part
                                through Federal grants (including
                                capitalization grants), loans, loan
                                guarantees, cost-share awards, or other
                                forms of Federal financial assistance;
                            ``(v) business loan guarantees provided by
                        the Small Business Administration pursuant to
                        subsection (a) or (b) of section 7 of the Small
                        Business Act (15 U.S.C. 636) or title V of the
                        Small Business Investment Act of 1958 (15
                        U.S.C. 695 et seq.);
                            ``(vi) bringing judicial or administrative
                        civil or criminal enforcement actions;
                            ``(vii) extraterritorial activities or
                        decisions, which means agency activities or
                        decisions with effects located entirely outside
                        of the territory of the United States or the
                        outer Continental Shelf (as defined in section
                        2 of the Outer Continental Shelf Lands Act (43
                        U.S.C. 1331)), subject to the condition that
                        nothing in this clause alters, limits,
                        supersedes, or otherwise affects any
                        requirement under the Deep Seabed Hard Mineral
                        Resources Act (30 U.S.C. 1401 et seq.);
                            ``(viii) activities or decisions that are
                        non-discretionary and made in accordance with
                        the statutory authority of the agency;
                            ``(ix) routine agency actions that are
                        administrative in nature, including actions
                        relating to personnel and fiscal management,
                        training, recordkeeping, procurement,
                        budgeting, travel, the repair of Federal
                        facilities to return those facilities to their
                        previous condition, or the maintenance of
                        Federal facilities, subject to the condition
                        that the cost of the action does not exceed
                        $10,000,000;
                            ``(x) notwithstanding any other provision
                        of law, any proposed agency action associated
                        with a project to repair, reconstruct, restore,
                        retrofit, or replace lifeline infrastructure
                        (as defined in section 4 of the Earthquake
                        Hazards Reduction Act of 1977 (42 U.S.C. 7703)
                        and referred to in this clause as `lifeline
                        infrastructure'), if the head of the relevant
                        Federal agency determines the repair,
                        reconstruction, restoration, retrofit, or
                        replacement is in the immediate vicinity of the
                        lifeline infrastructure and does not alter the
                        function or increase the capacity of the
                        lifeline infrastructure by more than 20 percent
                        as compared to the capacity of the original
                        condition of the lifeline infrastructure,
                        subject to the conditions that--
                                    ``(I) in the case of lifeline
                                infrastructure that is a highway or
                                bridge, the repair, reconstruction,
                                restoration, retrofit, or replacement
                                of that highway or bridge does not
                                result in additional through travel
                                lanes; and
                                    ``(II) in the case of lifeline
                                infrastructure that is a wireline
                                communications facility, the limitation
                                on an increase in capacity shall not
                                apply to the repair, reconstruction,
                                restoration, retrofit, or replacement
                                of existing fiber-optic cable or the
                                replacement of existing copper or
                                coaxial cable with fiber-optic cable;
                            ``(xi) notwithstanding any other provision
                        of law, any proposed agency action associated
                        with a geothermal observation test project (as
                        defined in section 30(a) of the Geothermal
                        Steam Act of 1970);
                            ``(xii) notwithstanding any other provision
                        of law, any proposed agency action associated
                        with transmission activities described in
                        section 216A(b) of the Federal Power Act;
                            ``(xiii) notwithstanding any other
                        provision of law, any proposed agency action
                        associated with a covered activity (as defined
                        in subsection (i)(1) of section 7 of the
                        Natural Gas Act (15 U.S.C. 717f));
                            ``(xiv) a proposed agency action, the
                        effects of which were previously evaluated by
                        another agency in compliance with this Act; or
                            ``(xv) any proposed agency action
                        associated with a project--
                                    ``(I) carried out under--
                                            ``(aa) a continuing
                                        authority program (as defined
                                        in section 7001(c)(1)(D)(iii)
                                        of the Water Resources Reform
                                        and Development Act of 2014 (33
                                        U.S.C. 2282d(c)(1)(D)(iii)));
                                        or
                                            ``(bb) an environmental
                                        infrastructure program or
                                        authority; and
                                    ``(II) for which the Federal share
                                of the cost of that project does not
                                exceed $50,000,000.
                    ``(C) Rule of construction with respect to
                transportation projects.--For the purpose of clause
                (iii) of subparagraph (B), the Department of
                Transportation shall be considered to have predominant
                control and responsibility over the subsequent use of
                financial assistance described in that clause for the
                purpose of any project that receives more than
                $10,000,000 of financial assistance from the Department
                of Transportation.
            ``(19) Programmatic environmental document.--The term
        `programmatic environmental document' means an environmental
        assessment or environmental impact statement analyzing all or
        some of the environmental effects of a policy, program, plan,
        or group of related actions.
            ``(20) Project sponsor.--The term `project sponsor' means
        an entity, including any Federal, private, public-private,
        State, local (including a county, borough, parish, city, and
        any other political subdivision of a State), or Tribal entity,
        that seeks an authorization for a proposed agency action.
            ``(21) Record of decision.--The term `record of decision'
        means a document, which may be issued concurrent with or
        following a final environmental document, that explains the
        decision of an agency with respect to a proposed agency action.
            ``(22) Record of stakeholder engagement.--The term `record
        of stakeholder engagement' means a document, not to exceed 20
        pages, including any citations or appendices, detailing pre-
        application engagement of a project sponsor with local
        governmental, Tribal, and community entities relating to an
        authorization for a proposed agency action for which the
        preparation of an environmental document is required under this
        Act that only includes the following:
                    ``(A) A brief list of pre-application engagement by
                the project sponsor with Federal agencies relating to
                the authorization for the proposed agency action,
                including the dates of meetings with the Federal
                agencies.
                    ``(B) A list of pre-application engagement by the
                project sponsor with State, local, and Tribal officials
                and local community entities relating to the
                authorization for the proposed agency action, including
                the date of meetings with those officials, a brief
                summary of any feedback received, and any ways in which
                feedback from stakeholders was incorporated into the
                proposed agency action.
            ``(23) Special expertise.--The term `special expertise'
        means statutory responsibility, agency mission, or related
        program experience.
            ``(24) State.--The term `State' means--
                    ``(A) each of the several States of the United
                States;
                    ``(B) the District of Columbia;
                    ``(C) the Commonwealth of Puerto Rico;
                    ``(D) Guam;
                    ``(E) American Samoa;
                    ``(F) the Commonwealth of the Northern Mariana
                Islands; and
                    ``(G) the United States Virgin Islands.
            ``(25) State agency.--The term `State agency' means any
        agency, department, board, commission, or other government
        entity of a State.
            ``(26) Statement of purpose and need.--The term `statement
        of purpose and need' means a brief summary by the lead agency
        that clearly explains--
                    ``(A) the underlying purpose of the proposed agency
                action;
                    ``(B) the need for the proposed agency action; and
                    ``(C) the goals of the project sponsor, as
                applicable.''.
    (b) Conforming Amendments.--
            (1) The National Environmental Policy Act of 1969 is
        amended by striking section 111 (42 U.S.C. 4336e).
            (2) Section 9909(c)(1) of the William M. (Mac) Thornberry
        National Defense Authorization Act for Fiscal Year 2021 (15
        U.S.C. 4659(c)(1)) is amended by striking ``section 111 of NEPA
        (42 U.S.C. 4336e)'' and inserting ``section 3 of NEPA''.
            (3) Section 4(l)(2)(F)(i) of the Good Samaritan Remediation
        of Abandoned Hardrock Mines Act of 2024 (30 U.S.C. 1245 note;
        Public Law 118-155) is amended by striking ``section 111 of the
        National Environmental Policy Act of 1969 (42 U.S.C. 4336e)''
        and inserting ``section 3 of the National Environmental Policy
        Act of 1969''.
            (4) Section 2232(a) of the Economic Development
        Reauthorization Act of 2024 (42 U.S.C. 3211 note; Public Law
        118-272) is amended by striking ``section 111 of the National
        Environmental Policy Act of 1969 (42 U.S.C. 4336e)'' and
        inserting ``section 3 of the National Environmental Policy Act
        of 1969''.
            (5) The Servicemember Quality of Life Improvement and
        National Defense Authorization Act for Fiscal Year 2025 (Public
        Law 118-159) is amended--
                    (A) in section 1412(b)(2) (50 U.S.C. 98b note), by
                striking ``section 111 of the National Environmental
                Policy Act of 1969 (42 U.S.C. 4336e)'' and inserting
                ``section 3 of the National Environmental Policy Act of
                1969''; and
                    (B) in section 3511(c)(3)(A) (46 U.S.C. 50505
                note), by striking ``section 111 of the National
                Environmental Policy Act of 1969 (42 U.S.C. 4336e)''
                and inserting ``section 3 of the National Environmental
                Policy Act of 1969''.

SEC. 1103. IMPLEMENTING PROCEDURES.

    Section 103 of the National Environmental Policy Act of 1969 (42
U.S.C. 4333) is amended--
            (1) by striking the section designation and all that
        follows through ``All agencies'' and inserting the following:

``SEC. 103. IMPLEMENTING PROCEDURES.

    ``(a) Initial Review.--All agencies''; and
            (2) by adding at the end the following:
    ``(b) Implementation Requirements.--Not later than 180 days after
the date of enactment of the Bipartisan American Affordability and Jobs
Act of 2026, each agency of the Federal Government shall make any
changes to the existing regulations, guidance documents, procedures, or
policies of the agency that are necessary to implement the intent,
purposes, and procedures set forth in this Act (including the
amendments made to this Act by the Bipartisan American Affordability
and Jobs Act of 2026).
    ``(c) Consistency.--To the maximum extent practicable, the Chairman
shall work to standardize the procedures of all agencies of the Federal
Government to implement this Act.
    ``(d) Technical Assistance.--At the request of an agency of the
Federal Government, the Chairman may provide technical assistance to
that agency in carrying out subsection (b).''.

SEC. 1104. COOPERATION OF AGENCIES; REPORTS; AVAILABILITY OF
              INFORMATION; RECOMMENDATIONS; INTERNATIONAL AND NATIONAL
              COORDINATION OF EFFORTS.

    Section 102(2) of the National Environmental Policy Act of 1969 (42
U.S.C. 4332(2)) is amended--
            (1) by striking subparagraph (B) and inserting the
        following:
                    ``(B) identify and develop methods and procedures,
                to implement the requirements of this Act, in
                consultation with the Chairman, that--
                            ``(i) will ensure that presently
                        unquantified environmental amenities and values
                        may be given appropriate consideration in
                        decisionmaking along with economic and
                        technical considerations; and
                            ``(ii) are consistent with the requirements
                        for minimum functional requirements and data
                        and technology standards for agency
                        implementation of eNEPA technologies;'';
            (2) in subparagraph (C)--
                    (A) in the matter preceding clause (i), by striking
                ``responsible official'' and inserting ``lead agency'';
                    (B) by indenting clauses (i) through (v)
                appropriately;
                    (C) in clause (ii), by striking ``proposal'' and
                inserting ``proposed agency action'';
                    (D) in clause (v), by striking the period at the
                end and inserting a semicolon; and
                    (E) in the undesignated matter following clause
                (v), in the second sentence--
                            (i) by striking ``Council on Environmental
                        Quality'' and inserting ``Council''; and
                            (ii) by striking ``proposal'' and inserting
                        ``proposed agency action''; and
            (3) in subparagraph (L), by striking ``Council on
        Environmental Quality established by title II of this Act'' and
        inserting ``Council''.

SEC. 1105. PROCEDURE FOR DETERMINATION OF LEVEL OF REVIEW.

    Section 106 of the National Environmental Policy Act of 1969 (42
U.S.C. 4336) is amended--
            (1) in subsection (a)--
                    (A) in paragraph (2)--
                            (i) by striking ``one of the agency's
                        categorical exclusions'' and inserting ``1 or a
                        combination of multiple categorical exclusions
                        (excluding multiple applications of the same or
                        similar categorical exclusions that are based
                        on size, acreage, or dollar amount thresholds)
                        of the agency''; and
                            (ii) by inserting ``a categorical exclusion
                        established by Congress,'' after ``section 109
                        of this Act,'';
                    (B) in paragraph (3), by striking ``or'' at the
                end;
                    (C) in paragraph (4), by striking ``proposed
                action.'' and inserting ``proposed agency action;'';
                and
                    (D) by adding at the end the following:
            ``(5) the proposed agency action relates to a project or
        action that has been reviewed pursuant to a State environmental
        review statute or a Tribal environmental review statute,
        ordinance, resolution, regulation, or formally adopted policy
        and the lead agency determines that the review serves a similar
        function as Federal agency compliance with this Act; or
            ``(6) the agency determines the proposed agency action is
        an action for which compliance by the agency with the
        requirements of another Federal law serves a similar function
        as compliance by the agency with this Act with respect to the
        action.'';
            (2) in subsection (b)--
                    (A) by redesignating paragraphs (1) and (2) as
                paragraphs (2) and (1), respectively, and moving the
                paragraphs so as to appear in numerical order; and
                    (B) in paragraph (1) (as so redesignated)--
                            (i) in the first sentence, by striking ``An
                        agency'' and inserting the following:
                    ``(A) In general.--Except as provided in
                subparagraph (B), a lead agency'';
                            (ii) in subparagraph (A) (as so
                        designated)--
                                    (I) in the first sentence--
                                            (aa) by striking ``one of
                                        the agency's categorical
                                        exclusions'' and inserting ``1
                                        or a combination of multiple
                                        categorical exclusions
                                        (excluding multiple
                                        applications of the same or
                                        similar categorical exclusions
                                        that are based on size,
                                        acreage, or dollar amount
                                        thresholds) of the agency'';
                                        and
                                            (bb) by inserting ``a
                                        categorical exclusion
                                        established by Congress,''
                                        after ``section 109 of this
                                        Act,''; and
                                    (II) in the second sentence, by
                                striking ``a Federal'' and inserting
                                ``the lead''; and
                            (iii) by adding at the end the following:
                    ``(B) Project sponsor request.--At the request of a
                project sponsor, if a lead agency has begun the
                preparation of an environmental assessment pursuant to
                subparagraph (A), the lead agency shall discontinue the
                preparation of the environmental assessment and proceed
                to the preparation of an environmental impact statement
                for the applicable proposed agency action.''; and
            (3) by adding at the end the following:
    ``(c) Effect of Threshold Determination on Other Agencies.--If a
lead agency determines that an environmental document is not required
to be prepared with respect to a proposed agency action under
subsection (a), no agency shall prepare an environmental document with
respect to the proposed agency action.''.

SEC. 1106. TIMELY AND UNIFIED FEDERAL REVIEWS.

    Section 107 of the National Environmental Policy Act of 1969 (42
U.S.C. 4336a) is amended--
            (1) by striking subsections (a) through (c) and inserting
        the following:
    ``(a) Determination of Agency Roles and Responsibilities.--
            ``(1) Lead agency.--
                    ``(A) Designation.--
                            ``(i) In general.--The Federal agency that
                        proposed the proposed agency action shall be
                        the lead agency.
                            ``(ii) Two or more agencies.--If there are
                        2 or more Federal agencies that are required by
                        law to make a decision relating to an
                        authorization for which an environmental review
                        is required under this Act, those agencies
                        shall determine, by letter or memorandum, which
                        Federal agency shall be the lead agency for
                        that environmental review based on
                        consideration of--
                                    ``(I) the magnitude of the
                                involvement of the Federal agencies;
                                    ``(II) the project approval or
                                disapproval authority of those Federal
                                agencies;
                                    ``(III) the expertise concerning
                                the environmental effects of the
                                proposed agency action;
                                    ``(IV) the duration of involvement
                                of the Federal agencies with respect to
                                that proposed agency action; and
                                    ``(V) the sequence of the
                                involvement of the Federal agencies
                                with respect to that proposed agency
                                action.
                            ``(iii) Joint lead agencies.--
                                    ``(I) In general.--In making a
                                determination under clause (ii), the
                                Federal agencies participating in the
                                environmental review may appoint such
                                State, Tribal, or local agencies as
                                joint lead agencies, as those Federal
                                agencies determine to be appropriate.
                                    ``(II) Responsibilities.--Joint
                                lead agencies appointed under subclause
                                (I) shall jointly fulfill the role
                                described in subparagraph (C).
                    ``(B) Delay in designation.--
                            ``(i) Request for designation.--
                                    ``(I) In general.--Any Federal,
                                State, Tribal, or local agency or
                                project sponsor that is substantially
                                affected by the lack of a designation
                                of a lead agency with respect to a
                                proposed agency action under
                                subparagraph (A) may submit a written
                                request to a Federal agency
                                participating in the environmental
                                review for the designation of a lead
                                agency.
                                    ``(II) Transmission.--A Federal
                                agency that receives a request under
                                subclause (I) shall transmit that
                                request to each Federal agency
                                participating in the environmental
                                review and to the Chairman.
                            ``(ii) Chairman designation.--
                                    ``(I) Request.--If the Federal
                                agencies participating in the
                                environmental review are unable to
                                agree on the designation of a lead
                                agency not later than 21 days after the
                                date on which the request was
                                transmitted to a Federal agency
                                participating in the environmental
                                review under clause (i)(II), the
                                Federal, State, Tribal, or local agency
                                or project sponsor that is
                                substantially affected by the lack of a
                                designation of a lead agency may submit
                                to the Chairman a request to designate
                                a lead agency, which request shall
                                consist of--
                                            ``(aa) a precise
                                        description of the nature and
                                        extent of the proposed agency
                                        action; and
                                            ``(bb) a detailed statement
                                        with respect to each Federal
                                        agency participating in the
                                        environmental review and each
                                        factor described in
                                        subparagraph (A)(ii) regarding
                                        which Federal agency shall
                                        serve as lead agency.
                                    ``(II) Transmission.--The Chairman
                                shall transmit a request received under
                                subclause (I) to each Federal agency
                                participating in the environmental
                                review.
                                    ``(III) Response.--A Federal agency
                                participating in an environmental
                                review may, not later than 14 days
                                after the date of the transmission of a
                                request under subclause (II), submit to
                                the Chairman a response to the request
                                for consideration by the Chairman.
                                    ``(IV) Designation.-- Not later
                                than 21 days after the date of the
                                transmission of a request under
                                subclause (II), the Chairman shall
                                designate the lead agency with respect
                                to the applicable proposed agency
                                action.
                                    ``(V) Final and conclusive; no
                                judicial review.--Any action taken by
                                the Chairman to designate a lead agency
                                under this clause--
                                            ``(aa) shall be final and
                                        conclusive; and
                                            ``(bb) shall not be subject
                                        to judicial review.
                    ``(C) Role of lead agency.--A lead agency shall,
                with respect to a proposed agency action--
                            ``(i) supervise the preparation of an
                        environmental document if, with respect to such
                        proposed agency action, there is more than 1
                        Federal agency participating in the
                        environmental review;
                            ``(ii) request the participation of each
                        cooperating agency at the earliest practicable
                        time;
                            ``(iii) in preparing an environmental
                        document, give consideration to any analysis or
                        proposal created, if applicable, by a
                        cooperating agency;
                            ``(iv) develop a schedule, in consultation
                        with each cooperating agency, the project
                        sponsor, and such other entities as the lead
                        agency determines appropriate, for completion
                        of any environmental document or authorization
                        required to carry out the proposed agency
                        action;
                            ``(v) meet with a cooperating agency that
                        requests such a meeting;
                            ``(vi) define and determine, as
                        appropriate, the purpose and need, the
                        reasonable alternatives, and the reasonably
                        foreseeable environmental effects of the
                        proposed agency action subject to the
                        jurisdiction of the lead agency by law, subject
                        to the condition that the alternatives may
                        include the use of land under the jurisdiction
                        of another Federal agency that has been
                        designated as a cooperating agency;
                            ``(vii) if the lead agency determines that
                        an environmental document or authorization will
                        not be completed in accordance with the
                        schedule developed under clause (iv), submit a
                        notification of any authorization or action by
                        another Federal agency responsible for the
                        possible failure to meet that schedule to the
                        Chairman;
                            ``(viii) presume that the effects of a no-
                        action alternative will be negative for any
                        proposed agency action carried out on, or
                        directly affecting, Tribal trust resources
                        (including lands and minerals) when the action
                        is initiated by the Indian Tribe for which the
                        United States holds the affected Tribal
                        resources in trust; and
                            ``(ix) eliminate from consideration any
                        alternative (except for a no-action
                        alternative) that does not--
                                    ``(I) fulfill the purpose and need
                                of the proposed agency action; and
                                    ``(II) meet the goals of an
                                applicable non-Federal project sponsor.
            ``(2) Cooperating agencies.--
                    ``(A) Designation.--
                            ``(i) In general.--The lead agency may,
                        with respect to a proposed agency action,
                        designate any Federal, State, Tribal, or local
                        agency (including a county, borough, parish,
                        city, and any other political subdivision of a
                        State) that has jurisdiction by law with
                        respect to any environmental effect involved in
                        a proposed agency action to serve as a
                        cooperating agency.
                            ``(ii) Requirements.--Not later than 30
                        days after the date on which the lead agency
                        issues, consistent with section 110, a notice
                        of intent to prepare an environmental impact
                        statement or informs the project sponsor that
                        an environmental assessment is necessary, the
                        lead agency shall--
                                    ``(I) identify all Federal and non-
                                Federal agencies and governmental
                                entities likely to require or provide
                                authorization with respect to a
                                proposed agency action; and
                                    ``(II) invite each agency
                                identified under subclause (I) to
                                become a cooperating agency.
                            ``(iii) Acceptance or denial.--An agency
                        invited under clause (ii)(II) shall accept or
                        deny the invitation not later than 7 days after
                        the date on which the agency receives the
                        invitation.
                            ``(iv) Limitations.--The designation of a
                        cooperating agency under this subparagraph
                        shall not--
                                    ``(I) give such cooperating agency
                                authority or jurisdiction over the
                                proposed agency action; or
                                    ``(II) expand any jurisdiction or
                                authority such cooperating agency may
                                have over the proposed agency action.
                            ``(v) Unidentified agencies.--In the event
                        that an agency that has jurisdiction by law
                        with respect to any environmental impact
                        involved in a proposed agency action is not
                        identified as a potential cooperating agency
                        under clause (ii)(I), the lead agency shall--
                                    ``(I) invite such unidentified
                                agency to become a cooperating agency
                                by not later than 7 days after becoming
                                aware that the agency has jurisdiction
                                by law with respect to the proposed
                                agency action; and
                                    ``(II) if such agency accepts the
                                invitation, incorporate such agency
                                into the schedule developed under
                                paragraph (1)(C)(iv) and update such
                                schedule accordingly by not later than
                                14 days after the date on which such
                                agency accepts the invitation.
                    ``(B) Role of cooperating agencies.--
                            ``(i) In general.--A cooperating agency
                        may, not later than a date specified in the
                        schedule established by the lead agency under
                        paragraph (1)(C)(iv), submit comments to the
                        lead agency.
                            ``(ii) Requirements.--Comments submitted by
                        a cooperating agency under clause (i) shall be
                        limited to matters relating to the jurisdiction
                        by law of the cooperating agency with respect
                        to--
                                    ``(I) the reasonably foreseeable
                                environmental effects of the proposed
                                agency action; and
                                    ``(II) any applicable authorization
                                required of the cooperating agency.
                            ``(iii) Assistance.--A cooperating agency
                        may, with the agreement of the lead agency,
                        assist in the preparation of an environmental
                        document.
                            ``(iv) Sufficiency of analysis.--For the
                        purpose of compliance with the requirements of
                        this Act, a cooperating agency shall be bound
                        by the purpose and need of the proposed agency
                        action and consider only those alternatives to
                        the proposed agency action that the lead agency
                        has, consistent with paragraph (1)(C),
                        determined are reasonable.
    ``(b) Coordination of Agencies Participating in an Environmental
Review.--
            ``(1) In general.--Not later than 30 days after the date
        described in clause (iii) of subsection (a)(2)(A) with respect
        to each agency invited to be a cooperating agency pursuant to
        clause (ii)(II) of that subsection, the lead agency shall
        develop the schedule under subsection (a)(1)(C)(iv) for the
        applicable proposed agency action.
            ``(2) Requirements.--To the maximum extent practicable, if
        a proposed agency action will require action by more than 1
        Federal agency and the lead agency has determined that the
        proposed agency action requires preparation of an environmental
        document, the lead agency and cooperating agencies shall--
                    ``(A) evaluate the proposed agency action in a
                single environmental document;
                    ``(B) carry out the obligations of each respective
                agency, including requirements under Federal law for a
                Federal agency to comment on an applicable
                environmental document, concurrently, and in
                conjunction with, other environmental reviews and
                authorizations being conducted by other Federal
                agencies, unless the lead agency or a cooperating
                agency, as applicable, determines that doing so would
                impair the ability of the agency to carry out the
                statutory obligations of the agency; and
                    ``(C) formulate and implement administrative,
                policy, and procedural mechanisms to ensure that the
                environmental review is coordinated, environmentally
                responsible, and enables the lead agency to comply with
                the deadlines described in subsection (g).
            ``(3) Consideration of timing.--
                    ``(A) In general.--No Federal agency shall be
                required to consider any scientific or technical
                research that becomes publicly available after the date
                of publication of a notice of intent or decision to
                prepare an environmental document for a proposed agency
                action.
                    ``(B) Delay.--A Federal agency may not delay the
                issuance of an environmental document or authorization
                beyond the deadline for the proposed agency action
                under subsection (g) on the basis of awaiting comment
                by a Federal agency required by Federal law, new
                scientific or technical research, or information that
                was not available as of the date described in
                subparagraph (A) for the proposed agency action.
                    ``(C) Applicability to other law.--Nothing in this
                paragraph affects any review of information required
                under subchapter II of chapter 5 of title 5, United
                States Code, with respect to comments received during a
                public comment period, as applicable.
    ``(c) Public Review.--
            ``(1) Publication in federal register.--Each notice of
        intent to prepare an environmental impact statement under
        section 102 shall be published by the lead agency in the
        Federal Register.
            ``(2) Public comment.--
                    ``(A) Requirements.--Each notice of intent to
                prepare an environmental impact statement under section
                102 shall include--
                            ``(i) a request for public comment on
                        alternatives or impacts and on relevant
                        information, studies, or analyses with respect
                        to the proposed agency action; and
                            ``(ii) a concise description of the general
                        location of the proposed agency action and a
                        summary of geospatial information for the
                        proposed agency action, if available.
                    ``(B) Comment period.--The lead agency shall
                establish a comment period of not less than 45 days and
                not more than 60 days after the date on which the
                notice to prepare an environmental impact statement is
                published in the Federal Register, unless the lead
                agency and project sponsor agree to a longer deadline,
                which shall not exceed 75 days.'';
            (2) in subsection (e), by redesignating paragraphs (1) and
        (2) as paragraphs (2) and (1), respectively, and moving the
        paragraphs so as to appear in numerical order;
            (3) in subsection (f)--
                    (A) in the subsection heading, by inserting ``and
                Use of Existing Documents'' after ``Preparation'';
                    (B) by striking ``A lead agency'' and inserting the
                following:
            ``(1) In general.--A lead agency''; and
                    (C) by adding at the end the following:
            ``(2) Existing documents.--On the request of a project
        sponsor, a lead agency shall consider and, as appropriate,
        adopt, tier to, or incorporate by reference, the analysis and
        documentation prepared for a proposed agency action or similar
        agency action under Federal law or the laws and procedures of a
        State or an Indian Tribe as the documentation, or part of the
        documentation, required to complete an environmental review, if
        the analysis and documentation were developed pursuant to
        Federal law or the laws and procedures of the State or Indian
        Tribe that serve a similar function as compliance by the lead
        agency with this Act, as determined by the lead agency.'';
            (4) in subsection (g)--
                    (A) by striking paragraph (1) and inserting the
                following:
            ``(1) In general.--
                    ``(A) Environmental assessments.--
                            ``(i) In general.--Except as provided in
                        section 106(b)(1)(B) or paragraph (2), with
                        respect to a proposed agency action, a lead
                        agency shall complete and make public the
                        environmental assessment, if applicable, not
                        later than the date that is 1 year after the
                        earlier of, as applicable--
                                    ``(I) the date on which the lead
                                agency determines that section
                                106(b)(1)(A) requires the preparation
                                of an environmental assessment with
                                respect to the proposed agency action;
                                and
                                    ``(II) the date on which the lead
                                agency notifies the project sponsor
                                that the application for the proposed
                                agency action is complete.
                            ``(ii) Additional requirements.--On
                        completion of an environmental assessment--
                                    ``(I)(aa) not later than 7 days
                                after the date on which the lead agency
                                completes and makes public the
                                environmental assessment, the lead
                                agency shall issue a finding of no
                                significant impact;
                                    ``(bb) not later than 90 days after
                                the date on which the lead agency
                                completes and makes public the
                                environmental assessment, all Federal
                                agencies participating in the
                                environmental review shall issue and
                                make public a decision on all
                                outstanding authorizations for the
                                proposed agency action; and
                                    ``(cc) not later than 120 days
                                after the date on which the lead agency
                                completes and makes public the
                                environmental assessment, all Federal
                                agencies not participating in the
                                environmental review shall issue and
                                make public a decision on all
                                outstanding authorizations for the
                                proposed agency action; or
                                    ``(II) not later than 7 days after
                                the date on which the lead agency
                                completes the environmental assessment,
                                the lead agency shall publish a notice
                                of intent to prepare an environmental
                                impact statement.
                    ``(B) Environmental impact statements.--
                            ``(i) In general.--Except as provided in
                        paragraph (2), with respect to a proposed
                        agency action, the lead agency shall publish an
                        environmental impact statement, if applicable,
                        not later than the date that is 2 years after
                        the earlier of, as applicable--
                                    ``(I) the date on which the lead
                                agency determines that section
                                102(2)(C) requires the issuance of an
                                environmental impact statement with
                                respect to the proposed agency action;
                                and
                                    ``(II) the date on which the lead
                                agency notifies the project sponsor
                                that the application for the proposed
                                agency action is complete.
                            ``(ii) Additional requirements.--
                                    ``(I) Record of decision.--Not
                                later than 45 days after the date on
                                which the lead agency publishes an
                                environmental impact statement for a
                                proposed agency action, the lead agency
                                shall issue a record of decision.
                                    ``(II) Issuance of
                                authorizations.--
                                            ``(aa) In general.--Not
                                        later than 90 days after the
                                        date on which the lead agency
                                        publishes an environmental
                                        impact statement for a proposed
                                        agency action, all Federal
                                        agencies participating in the
                                        environmental review shall
                                        issue a decision on all
                                        outstanding authorizations for
                                        the proposed agency action.
                                            ``(bb) Federal agencies not
                                        participating.--Not later than
                                        120 days after the date on
                                        which the lead agency publishes
                                        an environmental impact
                                        statement for a proposed agency
                                        action, all Federal agencies
                                        not participating in the
                                        environmental review shall
                                        issue and make public a
                                        decision on all outstanding
                                        authorizations for the proposed
                                        agency action.
                            ``(iii) Savings provision.--Nothing in this
                        subparagraph prohibits an agency from issuing
                        an environmental impact statement and record of
                        decision in a single document.
                    ``(C) Dispute resolution.--
                            ``(i) Definition of eligible dispute or
                        delay.--In this subparagraph, the term
                        `eligible dispute or delay' means a dispute or
                        delay with respect to the preparation of an
                        environmental document, a comment by a Federal
                        agency required by Federal law, or an
                        authorization involving more than 1 Federal
                        agency for which a project sponsor sends a
                        notification to the Chairman under clause (ii).
                            ``(ii) Notification of dispute.--The
                        Chairman, in consultation with each Federal
                        agency participating in the preparation of an
                        environmental document for a proposed agency
                        action, shall, to the maximum extent
                        practicable to meet the deadlines established
                        under this subsection and the schedule
                        developed under subsection (a)(1)(C)(iv),
                        facilitate resolution of an eligible dispute or
                        delay, including an anticipated delay, between
                        those Federal agencies with respect to
                        preparation of an environmental document, a
                        comment by a Federal agency required by Federal
                        law, or an authorization not later than 30 days
                        after the date of receipt of a notification
                        from a project sponsor.
                            ``(iii) Determination of resolution.--If an
                        eligible dispute or delay, including an
                        anticipated delay, described in clause (ii)
                        remains unresolved by the date that is 30 days
                        after the date on which a notification is
                        received under that clause, the Chairman, not
                        later than 14 days after that date, shall
                        determine a resolution and order the relevant
                        agencies to the eligible dispute or delay,
                        including an anticipated delay, to act in
                        accordance with that determination as soon as
                        practicable.
                            ``(iv) Final resolution.--Notwithstanding
                        any other provision of law, any order given or
                        action taken by the Chairman in resolution of
                        an eligible dispute or delay, including an
                        anticipated delay, under clause (iii)--
                                    ``(I) shall be final and
                                conclusive;
                                    ``(II) shall not be subject to
                                judicial review; and
                                    ``(III) shall, for purposes of
                                judicial review of the ultimate agency
                                action and all other Federal law,
                                constitute full compliance with and
                                satisfaction of any requirement for
                                interagency consultation, interagency
                                coordination, interagency concurrence,
                                interagency authorization, or other
                                interagency procedural obligation under
                                Federal law that is the subject of the
                                dispute or delay.'';
                    (B) in paragraph (2)--
                            (i) by inserting ``applicable'' before
                        ``deadline described in paragraph (1)'';
                            (ii) by striking ``in consultation with the
                        applicant'' and inserting ``with the approval
                        of the project sponsor''; and
                            (iii) by striking ``such environmental
                        impact statement or environmental assessment''
                        and inserting ``the applicable environmental
                        document''; and
                    (C) by striking paragraph (3) and inserting the
                following:
            ``(3) Failure to act.--
                    ``(A) In general.--If, after 30 days have passed
                from the date on which the Chairman determines that a
                key permitting agency has not acted in accordance with
                a determination under subparagraph (C)(iii) of
                paragraph (1) and causes a failure to comply with a
                deadline in accordance with that paragraph or an
                extended deadline in accordance with paragraph (2),
                each relevant agency CERPO of the key permitting agency
                and each career employee of the key permitting agency
                within the Senior Executive Service (as defined in
                section 2101a of title 5, United States Code) that has
                supervisory authority over personnel in the key
                permitting agency and that has a substantive role or
                responsibility in reviewing the applicable
                environmental document or authorization that remains
                unpublished or unissued, shall spend not less than 50
                percent of the workweek, as determined pursuant to
                title 5, United States Code, or other applicable law,
                to remedy the failure.
                    ``(B) No travel outside duty station.--
                            ``(i) In general.--If, after 60 days have
                        passed from the date on which a deadline
                        described in paragraph (1) or (2) was failed to
                        be met and the key permitting agency has not
                        published or made public the applicable
                        environmental document and has not issued all
                        outstanding authorizations, as described in
                        those paragraphs, with respect to a proposed
                        agency action, the head of the relevant key
                        permitting agency shall not travel more than 25
                        miles from their official duty station for the
                        purposes of official business until the key
                        permitting agency has published or made public
                        the applicable environmental document and
                        issued all outstanding authorizations related
                        to the proposed agency action that are not in
                        compliance with the requirements of this
                        subsection.
                            ``(ii) Corps of engineers.--For purposes of
                        clause (i), the Assistant Secretary of the Army
                        for Civil Works shall be considered to be the
                        head of the Corps of Engineers.
                    ``(C) Exception.--This paragraph shall not apply to
                the Secretary of Defense.
            ``(4) Causes of action.--
                    ``(A) Definition of court of competent
                jurisdiction.--In this paragraph, the term `court of
                competent jurisdiction' means--
                            ``(i) if a court has jurisdiction over an
                        applicable proposed agency action pursuant to
                        any other provision of Federal law other than
                        this Act, such court; or
                            ``(ii) if no such court exists under clause
                        (i)--
                                    ``(I) the district court of the
                                United States for the district in which
                                a substantial part of the applicable
                                proposed agency action is situated; or
                                    ``(II) the United States District
                                Court for the District of Columbia.
                    ``(B) Right to petition.--A project sponsor may
                obtain judicial review of the compliance by a Federal
                agency with the relevant deadline established under
                paragraph (1) or (2) by filing a written petition in a
                court of competent jurisdiction.
                    ``(C) Exceptions.--The failure of a Federal agency
                to publish in the Federal Register or make public an
                environmental document or issue a decision on all
                necessary authorizations shall not be considered
                failure to comply with the deadlines established under
                paragraph (1) or (2) if the Federal agency proves by
                clear and convincing evidence that the failure was
                caused by--
                            ``(i) a natural disaster, act of God, or
                        act of war that reasonably impaired the ability
                        of the Federal agency to comply with the
                        relevant deadline established under paragraph
                        (1) or (2);
                            ``(ii) a national emergency for which the
                        only available response is to delay the
                        publication or making public the environmental
                        document or withhold decisions on the relevant
                        authorizations by the relevant deadline
                        established under paragraph (1) or (2);
                            ``(iii) the publication or making public of
                        the environmental document or issuance of the
                        authorization violating the statutory
                        obligations of the Federal agency;
                            ``(iv) the completed application of the
                        project sponsor under section 110 being based
                        on fraud or material misrepresentations of
                        fact;
                            ``(v) the project sponsor withholding
                        information necessary to the ability of the
                        Federal agency to comply with its statutory
                        obligations in publishing or making public an
                        environmental document or issuing a decision on
                        all necessary authorizations, after the Federal
                        agency has made a reasonable and timely request
                        for such information; or
                            ``(vi) a lapse in appropriations of more
                        than 2 weeks affecting 1 or more of the
                        relevant agencies involved in the preparation
                        of the environmental documents or
                        authorizations.
                    ``(D) Remedy.--If a court of competent jurisdiction
                finds that a Federal agency has failed to act in
                accordance with this subsection, the court shall
                provide injunctive relief, as appropriate, to give
                effect to this section and retain jurisdiction to
                ensure compliance with any such relief.
                    ``(E) Expedited procedures; time to decide.--The
                reviewing court shall--
                            ``(i) establish an expedited schedule for
                        briefing and disposition;
                            ``(ii) issue a decision as expeditiously as
                        practicable, but not later than 120 days after
                        the date on which the petition is filed, absent
                        extraordinary circumstances; and
                            ``(iii) if the petition for relief is
                        granted, issue an order requiring a decision on
                        the covered application not later than 60 days
                        after the date on which the order is issued.'';
                        and
            (5) in subsection (h)--
                    (A) in paragraph (1)--
                            (i) in the matter preceding subparagraph
                        (A), by striking ``the Committee on Natural
                        Resources of the House of Representatives and
                        the Committee on Environment and Public Works
                        of the Senate'' and inserting ``the Chairman,
                        not later than April 15 of each year,''; and
                            (ii) by striking subparagraphs (A) and (B)
                        and inserting the following:
                    ``(A) identifies each environmental document that
                was not completed by each lead agency by the deadline
                described in subsection (g) and provides an explanation
                for the failure to meet the deadline;
                    ``(B) identifies each environmental document the
                preparation of which commenced before the date of
                enactment of the Fiscal Responsibility Act of 2023
                (Public Law 118-5; 137 Stat. 10) and is not yet
                complete at the time of the report and provides an
                explanation for the failure to complete the
                environmental document;
                    ``(C) details the on-time completion rate of each
                key permitting agency in adhering to applicable
                deadlines described in subsection (g); and
                    ``(D) details the progress of each key permitting
                agency in adhering to those deadlines as compared to
                the completion rate during the preceding year.'';
                    (B) in paragraph (2)--
                            (i) in subparagraph (A), by striking ``such
                        environmental assessment and environmental
                        impact statement'' and inserting ``applicable
                        environmental document'';
                            (ii) by striking subparagraph (B) and
                        inserting the following:
                    ``(B) the earlier of--
                            ``(i) with respect to an environmental
                        assessment, as applicable--
                                    ``(I) the date on which the lead
                                agency determines that section
                                106(b)(1)(A) requires the preparation
                                of an environmental assessment with
                                respect to the proposed agency action;
                                and
                                    ``(II) the date on which the lead
                                agency notifies the project sponsor
                                that the application for the proposed
                                agency action is complete; and
                            ``(ii) with respect to an environmental
                        impact statement, as applicable--
                                    ``(I) the date on which the lead
                                agency determines that section
                                102(2)(C) requires the issuance of an
                                environmental impact statement with
                                respect to the proposed agency action;
                                and
                                    ``(II) the date on which the lead
                                agency notifies the project sponsor
                                that the application for the proposed
                                agency action is complete; and''; and
                            (iii) in subparagraph (C), by striking
                        ``environmental assessment and environmental
                        impact statement'' and inserting
                        ``environmental document''; and
                    (C) by adding at the end the following:
            ``(3) Compilation.--The Chairman shall--
                    ``(A) compile the reports received by the heads of
                lead agencies under paragraph (1) each year;
                    ``(B) provide recommendations on how to improve the
                performance of Federal agencies in adhering to the
                deadlines described in subsection (g); and
                    ``(C) submit that compilation of those reports and
                those recommendations to the Committee on Environment
                and Public Works of the Senate and Committee on Natural
                Resources of the House of Representatives by not later
                than June 15 of the applicable year.''.

SEC. 1107. PROGRAMMATIC ENVIRONMENTAL DOCUMENT.

    Section 108 of the National Environmental Policy Act of 1969 (42
U.S.C. 4336b) is amended, in each of paragraphs (1) and (2), by
striking ``5 years'' and inserting ``10 years''.

SEC. 1108. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.

    Section 109 of the National Environmental Policy Act of 1969 (42
U.S.C. 4336c) is amended to read as follows:

``SEC. 109. USE OF CATEGORICAL EXCLUSIONS BY OTHER AGENCIES.

    ``(a) Agency Notification to Council.--
            ``(1) Available categorical exclusions.--Not later than 30
        days after the date of enactment of the Bipartisan American
        Affordability and Jobs Act of 2026, each Federal agency shall
        submit to the Council a notification of all categorical
        exclusions of the agency, specifying whether the categorical
        exclusion was administratively created, established by
        Congress, or adopted pursuant to subsection (c).
            ``(2) New categorical exclusions.--Not later than 7 days
        after the date on which a Federal agency administratively
        creates a categorical exclusion, a categorical exclusion under
        the jurisdiction of the applicable Federal agency is
        established by Congress, or the Federal agency adopts a
        categorical exclusion of another Federal agency pursuant to
        subsection (c), the Federal agency shall submit to the Chairman
        a notification of the creation, establishment, or adoption, as
        applicable, of that categorical exclusion.
    ``(b) Record of Categorical Exclusions.--The Council shall
maintain, on the website of the Council, an accurate and publicly
available record of each categorical exclusion that--
            ``(1) is created by a Federal agency;
            ``(2) has been established by Congress; or
            ``(3) has been adopted by a Federal agency pursuant to
        subsection (c).
    ``(c) Adoption of Categorical Exclusions by Other Agencies.--
            ``(1) In general.--A Federal agency may adopt a categorical
        exclusion of another Federal agency listed in the record
        required under subsection (b) for which the categorical
        exclusion was established consistent with this subsection.
            ``(2) Requirements.--In adopting a categorical exclusion
        under paragraph (1), a Federal agency shall--
                    ``(A) identify the categorical exclusion included
                on the record described in subsection (b) that covers a
                category of proposed agency actions or related actions;
                    ``(B) consult with the Federal agency that
                established the categorical exclusion or carries out a
                categorical exclusion established by Congress to ensure
                that the proposed adoption of the categorical exclusion
                to a category of proposed agency actions is
                appropriate; and
                    ``(C) publicly document adoption of the categorical
                exclusion.''.

SEC. 1109. APPLICATIONS FOR AUTHORIZATIONS.

    Section 110 of the National Environmental Policy Act of 1969 (42
U.S.C. 4336d) is amended to read as follows:

``SEC. 110. APPLICATIONS FOR AUTHORIZATIONS.

    ``(a) Application Sufficiency.--
            ``(1) Notification of complete or incomplete application.--
        Unless a shorter deadline is specified by law, in connection
        with a proposed agency action for which a project sponsor
        submitted an application for an authorization to a Federal
        agency, not later than 60 days after the date on which the
        project sponsor submits the application, the Federal agency
        shall--
                    ``(A) document receipt of the application; and
                    ``(B)(i) notify the project sponsor that the
                application is complete; or
                    ``(ii) notify the project sponsor that the
                application is incomplete and request, in writing, any
                additional information that the Federal agency needs to
                determine that the application is complete.
            ``(2) Agency determination.--
                    ``(A) Complete determination.--If a Federal agency
                determines that an application is complete under
                paragraph (1)(B)(i), the Federal agency shall, not
                later than 60 days after the date on which the Federal
                agency makes that determination, unless a shorter
                period is provided for by law--
                            ``(i) notify the project sponsor that the
                        Federal agency has determined that--
                                    ``(I) the proposed agency action--
                                            ``(aa) is excluded pursuant
                                        to a categorical exclusion; or
                                            ``(bb) is not a major
                                        Federal action; or
                                    ``(II) no further agency action is
                                required;
                            ``(ii) notify the project sponsor that the
                        agency has determined that preparation of an
                        environmental assessment is necessary; or
                            ``(iii) issue a notice of intent to prepare
                        an environmental impact statement for the
                        proposed agency action.
                    ``(B) Incomplete determination.--If a Federal
                agency requests additional information under paragraph
                (1)(B)(ii), the deadlines described in subparagraph (A)
                shall be based on the date on which the Federal agency
                receives the additional information instead of the date
                on which the determination is made.
            ``(3) Applicability to other law.--If a law provides for a
        shorter period with respect to a determination by a Federal
        agency that an application submitted by a project sponsor to
        the Federal agency is complete--
                    ``(A) nothing in this Act supersedes such shorter
                period; and
                    ``(B) the Federal agency shall commence its reviews
                under sections 106 and 107 and paragraph (2)(A) on
                receipt of a notice of staking or similar pre-permit
                submission notification.
    ``(b) Additional Application Information.--Unless otherwise
required by law, in addition to any information required by a Federal
agency for an application for authorization for a proposed agency
action requiring the preparation of an environmental document, a
project sponsor shall submit to the applicable Federal agency--
            ``(1) a list of each known Federal, State, Tribal, or local
        authorization required to complete the proposed agency action;
            ``(2) a record of stakeholder engagement for the proposed
        agency action as of the date of the application; and
            ``(3) a brief description of a statement of purpose and
        need for the proposed agency action, including, to the extent
        practicable, the location of the project and any known
        alternatives.''.

SEC. 1110. JUDICIAL REVIEW.

    Title I of the National Environmental Policy Act of 1969 (as
amended by section 1102(b)(1)) is amended by inserting after section
110 (42 U.S.C. 4336d) the following:

``SEC. 111. JUDICIAL REVIEW.

    ``(a) Definition of Claim.--In this section, the term `claim' means
a claim that--
            ``(1) is filed on or after the date of enactment of the
        Bipartisan American Affordability and Jobs Act of 2026; and
            ``(2) seeks judicial review under any provision of Federal
        law of an authorization based on a claim that an environmental
        review failed to be properly conducted pursuant to the
        requirements of this Act.
    ``(b) Limitations on Claims.--Notwithstanding any other provision
of law, a claim shall be barred unless the claim--
            ``(1) is filed not later than 150 days after the date on
        which, unless a shorter deadline is specified under Federal
        law--
                    ``(A) in the case of a claim in which an
                environmental impact statement was prepared, the
                applicable authorization was published in the Federal
                Register; and
                    ``(B) in the case of any other claim, the
                authorization was made public;
            ``(2) in the case of an authorization for which an
        opportunity for comment was provided, and for which the
        opportunity for public comment occurs after the date of
        enactment of the Bipartisan American Affordability and Jobs Act
        of 2026, the claim is filed by a party that submitted a
        substantive comment during a public comment period associated
        with that authorization, with such comment being sufficiently
        detailed to put the applicable Federal agency on notice of the
        particular issue on which the party seeks judicial review; and
            ``(3) is filed by a party alleging (or has an individual
        member alleging) an actual or imminent injury in fact amounting
        to a direct harm.
    ``(c) Procedural Matters for Claims.--
            ``(1) Original jurisdiction.--
                    ``(A) In general.--Except as provided in section
                9(b) of the Natural Gas Act (15 U.S.C. 717r(b)) and
                section 313(b) of the Federal Power Act (16 U.S.C.
                825l(b)), and subject to subparagraph (B), the court of
                appeals of the United States for the circuit in which a
                project subject to an authorization will be
                constructed, expanded, or operated shall have original
                and exclusive jurisdiction over a claim.
                    ``(B) Exceptions.--The United States Court of
                Appeals for the District of Columbia Circuit shall have
                original and exclusive jurisdiction over each of the
                following claims:
                            ``(i) A claim challenging a rule issued by
                        a Federal agency on the basis of compliance
                        with this Act.
                            ``(ii) A claim challenging an authorization
                        for a project that has no physical location.
            ``(2) Supplemental jurisdiction.--The courts of appeals of
        the United States shall have supplemental jurisdiction over
        other claims related to the validity of the authorization at
        issue in the claim within the original jurisdiction of the
        court of appeals.
            ``(3) Random assignment of cases.--To the maximum extent
        practicable, a court of appeals of the United States shall
        randomly assign judges appointed, designated, or assigned to
        sit as judges of the court to hear claims in a manner to avoid
        the appearance of favoritism or bias.
            ``(4) Deadlines for resolution.--A court of appeals of the
        United States shall render a final judgment with respect to a
        claim as expeditiously as possible.
            ``(5) Remedy.--
                    ``(A) In general.--Except as provided in
                subparagraph (B) and notwithstanding any other
                provision of law, if a court determines that an
                authorization does not comply with the requirements of
                this Act, the only remedy the court may order to
                redress that violation is to remand, without vacatur or
                issuance of an injunction, the applicable authorization
                to the agency with--
                            ``(i) specific instructions to correct
                        errors or deficiencies found by the court; and
                            ``(ii) a reasonable schedule and deadline
                        for the agency to act on remand, which shall
                        not exceed 180 days after the date on which the
                        order of the court was entered.
                    ``(B) Preliminary injunctions.--
                            ``(i) In general.--Notwithstanding
                        subparagraph (A) and subject to clause (ii), a
                        court may issue a preliminary injunction for
                        the applicable authorization when--
                                    ``(I) there is a substantial
                                likelihood the authorization violates a
                                Federal law other than--
                                            ``(aa) this Act; or
                                            ``(bb) division A of
                                        subtitle III of title 54,
                                        United States Code;
                                    ``(II) necessary to prevent
                                irreparable harm to the plaintiff;
                                    ``(III) the balance of equities
                                favors the plaintiff; and
                                    ``(IV) a preliminary injunction is
                                in the public interest.
                            ``(ii) Requirements.--A preliminary
                        injunction issued by a court under clause (i)
                        shall last no longer than the time the court
                        finds is reasonably necessary--
                                    ``(I) for the correction of the
                                violation described in clause (i)(I);
                                and
                                    ``(II) to prevent the irreparable
                                harm described in clause (i)(II).
            ``(6) Remanded actions.--
                    ``(A) Continued effect of authorization.--An
                authorization remanded under paragraph (5)(A) shall
                remain in effect while the Federal agency corrects any
                errors or deficiencies found by the reviewing court.
                    ``(B) Federal action during remand.--The activity
                that is the subject of an authorization remanded under
                paragraph (5)(A) may, notwithstanding that remand, be
                carried out, including during the time prescribed by
                the applicable court to correct the applicable errors
                or deficiencies.
            ``(7) Treatment of supplemental or revised environmental
        documents.--
                    ``(A) In general.--For purposes of a claim--
                            ``(i) a supplemental or revised
                        environmental document for an authorization,
                        when required by court order, shall be
                        considered to be a separate environmental
                        document; and
                            ``(ii) the deadline for filing a claim for
                        judicial review of an authorization described
                        in clause (i) shall be the date that is 150
                        days after the date on which the authorization
                        for which the supplemental environmental
                        document is prepared is made public by the
                        agency, unless a shorter time is specified in
                        the Federal law pursuant to which judicial
                        review is authorized.
                    ``(B) Limitation.--A claim for review of an
                authorization described in subparagraph (A)(i) shall be
                limited to information contained in the final
                supplemental environmental documents that was not
                contained in a previous environmental document for the
                authorization.
            ``(8) Actions for use of tribal trust resources.--
                    ``(A) In general.--Except as provided in
                subparagraph (B), for any action that authorizes the
                use of lands, minerals, or other resources held in
                trust at the time of a final agency action by the
                United States for the benefit of an Indian Tribe, there
                shall be no administrative or judicial review of such
                final agency action based on a claim of failure to
                comply with the requirements of this Act.
                    ``(B) Exceptions.--Subparagraph (A) shall not apply
                to an action for administrative or judicial review--
                            ``(i) brought by the Indian Tribe for which
                        the United States holds the lands, minerals, or
                        other resources in trust; or
                            ``(ii) that involves reasonably foreseeable
                        effects of the final agency action that occur
                        outside the lands, minerals, or other resources
                        held in trust by the United States for the
                        benefit of an Indian Tribe.
    ``(d) Role of Court.--In reviewing a claim of whether an
authorization complies with the requirements of this Act, a court shall
afford substantial deference to the agency relating to the scope and
contents of an environmental document.
    ``(e) Prohibition on Certain Claims and Judicial Review.--
Notwithstanding any other provision of law, there shall not be a claim
or judicial review of whether a final agency action complies with the
requirements of this Act for any omission from the list described in
section 3(22)(B).
    ``(f) Effect.--Nothing in this section--
            ``(1) establishes a cause of action or a right to judicial
        review;
            ``(2) places any limit on filing a claim that a person has
        violated the terms of an authorization; or
            ``(3) affects the right to obtain review under section
        107(g)(4).''.

              Subtitle B--Council on Environmental Quality

SEC. 1121. COUNCIL ON ENVIRONMENTAL QUALITY.

    (a) In General.--Title II of the National Environmental Policy Act
of 1969 is amended by striking section 209 (42 U.S.C. 4347) and
inserting the following:

``SEC. 209. ENEPA TECHNOLOGIES.

    ``(a) Definitions.--In this section:
            ``(1) Authorization data.--The term `authorization data'
        means--
                    ``(A) any data relevant for a Federal agency--
                            ``(i) to determine the effect on the
                        environment of an action for which an
                        authorization is required by the Federal
                        agency; and
                            ``(ii) to determine whether to issue such
                        authorization; and
                    ``(B) any community input or public comment on such
                determinations.
            ``(2) Data architecture.--The term `data architecture'
        means the design and organization of data systems, including
        frameworks for data storage, processing, and exchange.
            ``(3) Data standards.--The term `data standards' means
        agreed-on specifications for data formats, structures, and
        definitions to ensure consistency and vendor-neutral
        interoperability, as established under subsection (b)(1).
            ``(4) Minimum functional requirements.--The term `minimum
        functional requirements' means the requirements published under
        subsection (b)(2)(A)(ii).
    ``(b) Establishment of Data Standards and Publication of
Implementation Guidance.--
            ``(1) Establishment of standards.--
                    ``(A) In general.--Not later than 60 days after the
                date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, the Chairman, in
                consultation with the Chief Information Officers
                Council, the Office of Management and Budget, the
                Federal Permitting Improvement Steering Council, and
                each key permitting agency, shall develop, publish, and
                iteratively update data standards for the collection
                and curation of authorization data by Federal agencies,
                which shall be used--
                            ``(i) to assist with environmental reviews
                        and authorizations;
                            ``(ii) to organize, define, and standardize
                        various concepts, formats, and protocols that
                        are included in environmental reviews and
                        authorizations; and
                            ``(iii) to reduce the need for redundant
                        environmental reviews by creating a shared
                        vocabulary and software systems that will
                        support vendor neutrality, data
                        interoperability, workflow automation, and
                        automatic data exchange between Federal
                        agencies.
                    ``(B) Inclusions.--The data standards shall
                include--
                            ``(i) a standardized taxonomy that allows
                        Federal agencies to identify and track data
                        types, relationships, and values; and
                            ``(ii) comprehensive categories for data,
                        such as--
                                    ``(I) projects;
                                    ``(II) processes;
                                    ``(III) environmental documents;
                                    ``(IV) public comments;
                                    ``(V) geospatial information;
                                    ``(VI) public engagement events, as
                                applicable by process or Federal
                                agency;
                                    ``(VII) case events; and
                                    ``(VIII) milestones to ensure
                                clarity and uniformity.
            ``(2) Publication of guidance for implementation of data
        standards and minimum functional requirements.--
                    ``(A) Publication.--Not later than 120 days after
                the date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, the Chairman shall
                publish guidance for how each Federal agency
                responsible for environmental reviews or authorizations
                shall implement the following:
                            ``(i) The data standards.
                            ``(ii) The following minimum functional
                        requirements:
                                    ``(I) Application data sharing that
                                enables automated transfer of relevant
                                environmental review and authorization
                                data among Federal agencies.
                                    ``(II) Automated project screening
                                to assist frontline staff with
                                reviewing project sponsor-provided
                                information for completeness and
                                accuracy and determining if a
                                categorical exclusion or other general
                                authorization applies to an action,
                                subject to the condition that such
                                automated project screening may not be
                                used by the Chairman or a Federal
                                agency to unlawfully restrict any
                                activity on Federal land.
                                    ``(III) Public availability of
                                screening criteria and related decision
                                models.
                                    ``(IV) Automated case or project
                                management tools that include a
                                repository of relevant data and
                                metadata that enable advanced tracking,
                                reporting, and optimization to aid
                                workflows.
                                    ``(V) Integrated geographic
                                information system analysis tools that
                                incorporate geospatial data layers and
                                models for each resource analyzed as
                                part of an environmental review or
                                authorization for a given study area.
                                    ``(VI) Document management tools
                                that preserve metadata associated with
                                geospatial analysis, modeling, and
                                other analytic processes conducted
                                during an environmental review or
                                authorization for purposes of
                                supporting future environmental reviews
                                and enabling artificial intelligence-
                                assisted analysis of past decisions.
                                    ``(VII) Automated comment
                                compilation and analysis tools,
                                including services for comment
                                categorization and response that handle
                                the lifecycle of comment submission,
                                analysis, categorization, and response
                                with artificial intelligence support
                                where appropriate.
                                    ``(VIII) Administrative record
                                management tools that maintain portable
                                document formats and data-rich
                                repositories accessible to machine and
                                human users.
                                    ``(IX) Common or interoperable
                                Federal agency services that integrate
                                shared services, shared applications,
                                and common user experiences for Federal
                                agency staff, project sponsors, and the
                                public.
                    ``(B) Inclusions.--The guidance published under
                subparagraph (A) shall include the following:
                            ``(i) Guidelines for cloud-based storage,
                        data sharing protocols, and application
                        programming interfaces to enable the Chairman
                        to work with Federal agencies to use
                        authorization data--
                                    ``(I) to aid Federal agencies in
                                modernizing their environmental reviews
                                and authorizations; and
                                    ``(II) for iterative development of
                                the authorization portal described in
                                subsection (d)(2)(B).
                            ``(ii) Provisions that support scalability
                        and adaptability of the minimum requirements to
                        emerging technologies.
    ``(c) Agency Implementation.--
            ``(1) Implementation.--The head of each key permitting
        agency shall--
                    ``(A) not later than 90 days after the date of
                enactment of the Bipartisan American Affordability and
                Jobs Act of 2026--
                            ``(i) compare existing Federal agency
                        systems for environmental reviews and
                        authorizations under the authority of the
                        agency with the data standards and minimum
                        functional requirements and report findings
                        from such comparison to the Chairman;
                            ``(ii) assess whether existing Federal
                        agency technological capabilities are
                        consistent with the data standards and the
                        minimum functional requirements;
                            ``(iii) submit to the Chairman a report
                        that estimates the completion dates for
                        implementing the data standards and the minimum
                        functional requirements; and
                            ``(iv) submit to the Chairman an
                        implementation plan that--
                                    ``(I) describes how the Federal
                                agency will implement the data
                                standards and the minimum functional
                                requirements; and
                                    ``(II) describes how, to the extent
                                the Federal agency determines necessary
                                to meet relevant statutory
                                requirements, the Federal agency will
                                adopt or implement the prototype tools
                                tested, designed, and built under
                                subsection (d)(1); and
                    ``(B) not later than 180 days after that date of
                enactment, begin implementing the data standards
                published and the minimum functional requirements.
            ``(2) Report.--Not less frequently than twice each year,
        the Chief Information Officer of each key permitting agency, in
        consultation with the CERPO of each key permitting agency,
        shall submit to the Chairman and the Director of the Office of
        Management and Budget a report on the progress of the key
        permitting agency towards meeting the requirements described in
        paragraph (1).
    ``(d) Development of ENEPA Technologies.--
            ``(1) Prototype tools.--
                    ``(A) In general.--The Chairman, in consultation
                with the Administrator of General Services, the Chief
                Information Officers Council, the Director of the
                Office of Management and Budget, the Federal Permitting
                Improvement Steering Council, and each key permitting
                agency shall design, test, and build prototype tools
                for environmental reviews and authorizations that will
                assist Federal agencies in implementing the minimum
                functional requirements.
                    ``(B) Priority.--The Chairman shall prioritize
                designing, testing, and building tools under this
                paragraph that--
                            ``(i) support authorization case or project
                        management systems that--
                                    ``(I) manage tasks, milestones, and
                                activities associated with
                                environmental reviews and
                                authorizations; and
                                    ``(II) provide Federal agencies
                                more data and insight into such reviews
                                and authorizations;
                            ``(ii) enable--
                                    ``(I) application submission and
                                tracking portals used by project
                                sponsors, enabling greater
                                transparency; and
                                    ``(II) public comment opportunity
                                tracking portals to increase
                                transparency;
                            ``(iii) facilitate automated applications,
                        environmental reviews, and authorizations;
                            ``(iv) allow data exchange between Federal
                        agency systems; and
                            ``(v) accelerate complex environmental
                        reviews.
            ``(2) Epermit unified interagency data system.--
                    ``(A) Epermit unified interagency data system.--To
                the maximum extent practicable, the Chairman and the
                head of each key permitting agency shall iteratively
                develop and maintain a unified interagency data system
                consisting of interconnected Federal agency systems and
                shared services for environmental reviews and
                authorizations.
                    ``(B) Authorization portal.--
                            ``(i) In general.--The shared services
                        developed and maintained under subparagraph (A)
                        shall include a common interactive, digital,
                        cloud-based authorization portal, which shall--
                                    ``(I) be designed in a manner
                                consistent with--
                                            ``(aa) the recommendations
                                        of the Chairman included in the
                                        study entitled `Council on
                                        Environmental Quality Report to
                                        Congress on the Potential for
                                        Online and Digital Technologies
                                        to Address Delays in Reviews
                                        and Improve Public
                                        Accessibility and Transparency
                                        under 42 U.S.C. 4332(2)(C)';
                                        and
                                            ``(bb) the minimum
                                        functional requirements;
                                    ``(II) serve as a platform for
                                tracking and displaying real-time data
                                on environmental reviews and
                                authorizations made available through
                                application programming interfaces or
                                other reporting mechanisms from Federal
                                agency systems that are compliant with
                                the data standards and data
                                architecture described in this section;
                                    ``(III) be supported by a
                                decentralized, cross-network digital
                                infrastructure software that ensures
                                vendor neutrality and interoperability
                                of data and models across Federal
                                agencies;
                                    ``(IV) include a mechanism for the
                                dissemination of relevant information
                                (such as a notice of intent for public
                                comment, public meetings, project
                                statuses, or a notice of intent to
                                prepare an environmental document) to
                                local communities, as applicable;
                                    ``(V) allow a project sponsor to
                                submit all necessary documentation for
                                environmental reviews and
                                authorizations in 1 unified and secure
                                portal;
                                    ``(VI) support interactive,
                                digital, and cloud-based tools enabling
                                project sponsors to edit documents and
                                collaborate with relevant Federal
                                agencies in real time;
                                    ``(VII) support visual features,
                                including video, animation, geographic
                                information system displays,
                                interactive maps, and three-dimensional
                                renderings;
                                    ``(VIII) provide for the exchange
                                of information to and from Federal
                                agency data systems via an application
                                programming interface or another
                                reporting mechanisms;
                                    ``(IX) allow for the submission of
                                geospatial data associated with project
                                location, footprint, and impact;
                                    ``(X) support automatic
                                documentation of submission and process
                                timelines; and
                                    ``(XI) allow certain metrics to be
                                tracked over time, including--
                                            ``(aa) estimates of
                                        achieved efficiencies, such as
                                        reductions in the time between
                                        receipt of applications and
                                        final authorization decisions;
                                            ``(bb) comparisons of
                                        authorization timelines before
                                        and after the implementation of
                                        the Bipartisan American
                                        Affordability and Jobs Act of
                                        2026;
                                            ``(cc) usage of the
                                        authorization portal and other
                                        statistics from the Digital
                                        Analytics Program of the
                                        General Services
                                        Administration;
                                            ``(dd) metrics on the
                                        number of public comments
                                        received, responses provided,
                                        and community meetings held;
                                            ``(ee) the number of
                                        projects subject to litigation
                                        based on authorization
                                        deficiencies or inefficiencies;
                                            ``(ff) a list of Federal
                                        agencies that are not yet fully
                                        compliant with the data
                                        standards and the minimum
                                        functional requirements,
                                        including their progress toward
                                        compliance; and
                                            ``(gg) examples or
                                        repositories of Federal agency-
                                        developed digital workflows
                                        enabled by the implementation
                                        of this Act, including
                                        visualizations of data sharing,
                                        authorizations and decision
                                        logic, and environmental
                                        reviews.
                            ``(ii) Administrative support.--The
                        Administrator of General Services shall host
                        the authorization portal as a shared service
                        for Congress, Federal agencies, and the public.
                            ``(iii) Accessibility.--The authorization
                        portal shall be accessible to Congress, Federal
                        agencies, and the public, with appropriate
                        safeguards to protect sensitive or classified
                        information and information restricted by user
                        type as appropriate.
                            ``(iv) Public accessibility.--To the extent
                        practicable and consistent with other law, the
                        authorization portal shall provide public
                        access to non-sensitive data, including
                        authorization timelines, location, project
                        type, environmental reviews, and mitigation
                        measures.
                            ``(v) Congressional access and oversight.--
                                    ``(I) In general.--The
                                authorization portal shall provide
                                Congress with direct access to
                                aggregated performance data and other
                                analytics to enable real-time oversight
                                of Federal agencies.
                                    ``(II) Artificial intelligence
                                support systems and training
                                materials.--Congress shall have access
                                to the data, fine-tuning procedures,
                                and prompt configurations specifically
                                created or adapted for artificial
                                intelligence systems used to support
                                environmental review or authorization
                                activities, excluding proprietary or
                                general pre-training materials
                                unrelated to such agency-specific
                                customization.
                                    ``(III) Technical assistance.--The
                                Chairman shall provide to Congress
                                technical assistance, on request, to
                                ensure effective use of the
                                authorization portal and artificial
                                intelligence systems for oversight
                                purposes.
                    ``(C) Cybersecurity and compliance
                considerations.--The authorization portal shall be
                designed to promote vendor neutral interoperability,
                reduce redundancy, and ensure compliance and
                coordination with other laws, including--
                            ``(i) section 552a of title 5, United
                        States Code (commonly known as the `Privacy Act
                        of 1974');
                            ``(ii) subchapter II of chapter 35 of title
                        44, United States Code;
                            ``(iii) the Federal Risk and Authorization
                        Management Program established by section 3608
                        of title 44, United States Code; and
                            ``(iv) the Cybersecurity and Infrastructure
                        Security Agency of the Department of Homeland
                        Security, in any case in which a project is in
                        coordination with a Federal agency with
                        stringent security requirements.
            ``(3) Deadlines.--
                    ``(A) Shared services pilot.--Not later than 1 year
                after the date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, the Chairman shall
                oversee piloting of shared services for environmental
                reviews and authorizations, including the authorization
                portal under paragraph (2)(B).
                    ``(B) Unified system development and
                implementation.--To the maximum extent practicable, not
                later than December 1, 2028, the Chairman shall develop
                and implement the ePermit unified interagency data
                system under paragraph (2).
    ``(e) Agency and Personnel Performance.--
            ``(1) In general.--The Chairman shall develop outcome-based
        performance measures to assess Federal agency performance and
        Federal agency personnel performance with respect to
        environmental reviews or other types of authorizations.
            ``(2) Requirements.--In developing the performance measures
        under paragraph (1), the Chairman shall--
                    ``(A) coordinate with--
                            ``(i) the agency CERPO for each key
                        permitting agency;
                            ``(ii) the Performance Improvement Officer
                        for each key permitting agency;
                            ``(iii) the Chief Human Capital Officer for
                        each key permitting agency;
                            ``(iv) the Director of the Office of
                        Management and Budget; and
                    ``(B) consider how eNEPA technologies assist in the
                assessment of--
                            ``(i) areas of high performance among key
                        permitting agencies for the purpose of
                        identifying successful strategies for meeting
                        performance goals that may be replicated by
                        other key permitting agencies;
                            ``(ii) areas of poor performance among the
                        department, program, district, field, region,
                        and other subsidiaries of each key permitting
                        agency for the purpose of providing additional
                        support and oversight;
                            ``(iii) areas of high performance among the
                        department, program, district, field, region,
                        and other subsidiaries of each key permitting
                        agency for the purpose of identifying
                        successful strategies for meeting performance
                        goals that may be replicated within other
                        offices of the Federal agency; and
                            ``(iv) opportunities for the Chairman to
                        expend funds from the Permitting Improvement
                        Fund established by section 1133(a) of the
                        Bipartisan American Affordability and Jobs Act
                        of 2026 to facilitate higher performance of
                        agencies and agency personnel with respect to
                        environmental reviews and authorizations.
    ``(f) Authority to Enter Into Contracts.--Subject to the
availability of appropriations, the Chairman may enter into contracts
and other arrangements for analyses, services, and products with
Federal agencies, private organizations, and businesses, and make such
payments as determined necessary by the Chairman to carry out this
section.
    ``(g) Annual Report.--Not less frequently than annually, the
Chairman, in consultation with the Chief Information Officers Council,
the Federal Permitting Improvement Steering Council, and other relevant
Federal agencies, as determined by the Chairman, shall submit to the
Committee on Environment and Public Works of the Senate and the
Committee on Natural Resources of the House of Representatives a report
on--
            ``(1) the progress of the Chairman in developing the
        ePermit unified interagency data system under subsection
        (d)(2); and
            ``(2) the performance of each key permitting agency under
        subsection (e), as compared to the previous year.
    ``(h) Savings Provisions.--
            ``(1) In general.--Nothing in this section authorizes the
        Chairman or a Federal agency to impose additional regulatory
        processes or requirements beyond those expressly stipulated
        under this Act or any other law.
            ``(2) No restriction.--To the extent that a data system,
        technology, or tool developed or incorporated into a unified
        interagency data system under this section is not limited by
        project type, the data system, technology, or tool shall not
        have its use be restricted by project type.

``SEC. 210. AUTHORIZATION OF APPROPRIATIONS.

    ``There is authorized to be appropriated to carry out this Act
$5,000,000 for each fiscal year.''.
    (b) Technical Amendment.--Section 202 of the National Environmental
Policy Act of 1969 (42 U.S.C. 4342) is amended, in the first sentence,
by striking ``(hereinafter referred to as the `Council')''.

               Subtitle C--Federal Permitting Improvement

SEC. 1131. DEFINITIONS.

    In this subtitle:
            (1) Applicable deadlines.--The term ``applicable
        deadlines'' means the deadlines described in section 107(g) of
        the National Environmental Policy Act of 1969 (42 U.S.C.
        4336a(g)).
            (2) Applicable schedule.--The term ``applicable schedule''
        means the schedule established for a transparency project under
        subsection (a)(1)(C)(iv) of section 107 of the National
        Environmental Policy Act of 1969 (42 U.S.C. 4336a).
            (3) FAST act terms.--The terms ``covered project'',
        ``Dashboard'', and ``Executive Director'' have the meanings
        given those terms in section 41001 of the FAST Act (42 U.S.C.
        4370m).
            (4) NEPA terms.--The terms ``authorization'', ``Chairman'',
        ``Council'', ``environmental assessment'', ``environmental
        document'', ``environmental impact statement'', ``environmental
        review'', ``key permitting agency'', ``lead agency'', ``project
        sponsor'', and ``statement of purpose and need'' have the
        meanings given those terms in section 3 of the National
        Environmental Policy Act of 1969.
            (5) Tracker.--The term ``Tracker'' means the Environmental
        Review and Permitting Tracker required under section 1132.
            (6) Transparency project.--The term ``transparency
        project'' means--
                    (A) a proposed agency action requiring the
                preparation of an environmental impact statement; or
                    (B) a proposed agency action requiring the
                preparation of an environmental assessment that has not
                been completed by the date that is 13 months after the
                deadline established for the project under paragraph
                (1)(A) of section 107(g) of the National Environmental
                Policy Act of 1969 (42 U.S.C. 4336a(g)).

SEC. 1132. ENVIRONMENTAL REVIEW AND PERMITTING TRACKER.

    (a) In General.--The Executive Director, in coordination with the
Chairman and the General Services Administration, shall maintain, as a
component of the Dashboard, an online database, to be known as the
``Environmental Review and Permitting Tracker'', to track the status of
Federal environmental documents and authorizations for each
transparency project.
    (b) List of Transparency Projects.--The Tracker shall include an
up-to-date list of all transparency projects.
    (c) Creation of Tracker Entries.--
            (1) In general.--The Chairman shall create a specific entry
        on the Tracker for a transparency project not later than--
                    (A) in the case of a transparency project described
                in section 1131(6)(A), the date that is 14 days after
                the date on which a notice of intent to prepare an
                environmental impact statement for that transparency
                project is published in the Federal Register in
                accordance with section 107(c) of the National
                Environmental Policy Act of 1969 (42 U.S.C. 4336a(c));
                and
                    (B) in the case of a transparency project described
                in section 1131(6)(B), the date that is 13 months and
                14 days after the deadline established for that
                transparency project under paragraph (1)(A) of section
                107(g) of the National Environmental Policy Act of 1969
                (42 U.S.C. 4336a(g)).
            (2) Specific and searchable entry.--Each entry of the
        Tracker shall include a specific and searchable entry for each
        transparency project listed on the Tracker in accordance with
        paragraph (1).
            (3) Exclusions.--Any environmental review relating to an
        action taken by a Federal agency to develop a rule under
        subchapter II of chapter 5 and chapter 7 of title 5, United
        States Code (commonly known as ``Administrative Procedure
        Act''), shall not be included on the Tracker.
    (d) Content of Tracker Postings.--
            (1) Transparency projects.--For each transparency project
        added to the Tracker under subsection (c)(1), the Executive
        Director shall post the most up-to-date information,
        including--
                    (A) a description of the location and major
                features of the transparency project;
                    (B) the statement of purpose and need for the
                transparency project, consistent with section 107(d) of
                the National Environmental Policy Act of 1969 (42
                U.S.C. 4336a(d));
                    (C) contact information, including the email
                address, of--
                            (i) a representative of the project sponsor
                        of the transparency project; and
                            (ii) a representative of the lead agency
                        for the transparency project;
                    (D) the status of the compliance of each agency
                with respect to the applicable schedule and applicable
                deadlines for the transparency project, to be updated
                quarterly, including each modification of the
                applicable schedule, which shall describe--
                            (i) an explanation of each modification,
                        including whether the modification is due to a
                        delay on the part of an agency or the project
                        sponsor;
                            (ii) the time period modified from the
                        originally projected applicable schedule; and
                            (iii) any subsequent modifications from
                        prior modifications, including whether such
                        subsequent modification is due to a delay on
                        the part of an agency or the project sponsor;
                        and
                    (E) a description of the status of any litigation
                that is directly related to the transparency project,
                including, if practicable, any judicial document made
                available on an electronic docket maintained by a
                Federal, State, or local court.
            (2) Publication.--All information described in this
        subsection shall be posted on the Dashboard not later than 7
        days after the date on which the lead agency or the Executive
        Director receives the information.
    (e) Covered Projects.--In the case of a transparency project that
is a covered project--
            (1) the entry for the covered project on the Dashboard
        under section 41003(b) of the FAST Act (42 U.S.C. 4370m-2(b))
        shall serve as the entry for the transparency project on the
        Tracker;
            (2) the Executive Director shall ensure that the entry
        includes the information described in subsection (d)(1); and
            (3) no Federal agency or project sponsor shall be required
        to submit information for the Tracker that duplicates
        information submitted for the Dashboard under section 41003(b)
        of the FAST Act (42 U.S.C. 4370m-2(b)).

SEC. 1133. PERMITTING IMPROVEMENT FUND.

    (a) Establishment.--There is established in the Treasury of the
United States a fund, to be known as the ``Permitting Improvement
Fund'' (referred to in this section as the ``Fund'').
    (b) Purpose.--The purpose of the Fund is to improve the performance
of key permitting agencies with respect to timely environmental reviews
and authorizations required under the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.).
    (c) Transfer Authority.--Amounts in the Fund shall be available to
the Chairman to transfer to a key permitting agency for 1 or more uses
described in subsection (d).
    (d) Use of Amounts.--Amounts transferred under subsection (c) shall
be used by a key permitting agency--
            (1) to support interagency detailee and rotation
        opportunities;
            (2) to facilitate professional development;
            (3) to enhance support for agency project managers;
            (4) to support standardizing processes among regional and
        field offices;
            (5) to improve opportunities for public engagement; or
            (6) for any other use, as determined by the Chairman,
        consistent with the purpose of the Fund.
    (e) Effect on Decisionmaking.--The use of funds under subsection
(d) by a key permitting agency shall not impact the impartial
decisionmaking of the key permitting agency with respect to
environmental reviews or authorizations, either procedurally or
substantively.
    (f) Authorization of Appropriation.--There is authorized to be
appropriated to the Fund $20,000,000 for each of fiscal years 2027
through 2033.

SEC. 1134. LIMITATION ON CLAIMS FOR FAST-41 COVERED PROJECTS.

    (a) In General.--Section 41007(a) of the FAST Act (42 U.S.C. 4370m-
6(a)) is amended--
            (1) in paragraph (1)(A), by striking ``2 years'' and
        inserting ``150 days''; and
            (2) in paragraph (2)(B), by striking ``2 years'' and
        inserting ``150 days''.
    (b) Applicability.--The amendments made by subsection (a) shall
apply to a claim seeking judicial review of an authorization for which
the notice of final agency action is published in the Federal Register
on or after the date of enactment of this Act.

                       TITLE II--CLEAN WATER ACT

SEC. 1201. WATER QUALITY CRITERIA.

    (a) Administrative Procedure.--Section 304(a) of the Federal Water
Pollution Control Act (33 U.S.C. 1314(a)) is amended by adding at the
end the following:
            ``(10) Administrative procedure.--In developing any
        criterion under this subsection, the Administrator shall carry
        out a rulemaking under section 553 of title 5, United States
        Code.''.
    (b) Judicial Review.--Section 509(b)(1) of the Federal Water
Pollution Control Act (33 U.S.C. 1369(b)(1)) is amended, in the first
sentence--
            (1) by striking ``402, and (G)'' and inserting ``402,
        (G)''; and
            (2) by inserting ``(H) in finalizing any criteria under
        section 304(a), and (I) in defining the scope of the term
        `waters of the United States' for purposes of this Act,'' after
        ``section 304(l),''.

SEC. 1202. CLEAN WATER ACT PERMITTING AND STATE CERTIFICATION.

    Section 401 of the Federal Water Pollution Control Act (33 U.S.C.
1341) is amended by adding at the end the following:
    ``(e) Certification Procedures, Requirements, and Limitations.--
            ``(1) Effect of certain certification actions.--
                    ``(A) Certification or waiver.--If a certifying
                authority grants a certification application or if a
                certifying authority waives the certification
                requirement for a certification application, the agency
                with jurisdiction over the Federal license or permit
                for which the certification application was made shall
                consider water quality requirements satisfied for the
                purpose of considering the application for the Federal
                license or permit.
                    ``(B) Certification with conditions.--
                            ``(i) In general.--If a certifying
                        authority grants a certification application
                        with conditions, the agency with jurisdiction
                        over the Federal license or permit for which
                        the certification application was made shall
                        consider water quality requirements satisfied
                        for the purpose of considering the application
                        for the Federal license or permit, subject to
                        the conditions included in the certification.
                            ``(ii) Savings clause.--Nothing in this
                        subparagraph affects paragraph (2)(B).
            ``(2) Scope of certification.--
                    ``(A) In general.--The scope of a certification
                provided under this section shall be limited to
                ensuring compliance with water quality requirements.
                    ``(B) Prohibition.--In reviewing a certification
                application, no certifying authority may--
                            ``(i) deny certification for any reason
                        other than making a determination by clear and
                        convincing evidence that--
                                    ``(I) no modification to or
                                reasonable condition on the
                                certification would make it possible to
                                grant the certification without
                                violating water quality requirements;
                                or
                                    ``(II) after the certifying
                                authority has sent the communication
                                described in clause (v)(II) of
                                paragraph (3)(C) and given the
                                applicant a reasonable opportunity to
                                provide the additional materials or
                                information described in that
                                communication, the application
                                continues to lack the information
                                required under clause (ii) and, if
                                applicable, clause (iii) of that
                                paragraph; or
                            ``(ii) grant certification with conditions,
                        except for conditions that the certifying
                        authority determines by clear and convincing
                        evidence are--
                                    ``(I) necessary to ensure
                                compliance with water quality
                                requirements; and
                                    ``(II) the least burdensome
                                conditions to ensure compliance with
                                water quality requirements.
                    ``(C) Savings provision.--Nothing in this paragraph
                allows a Federal licensing or permitting agency to
                refuse to include conditions from a certifying
                authority in a Federal license or permit if the
                certifying authority determines the conditions are
                necessary to ensure compliance with water quality
                requirements.
            ``(3) Required procedures.--
                    ``(A) Notice and hearings.--Taking into account
                State or Tribal law, as appropriate, and the review
                period described in paragraph (4), each certifying
                authority shall establish procedures for--
                            ``(i) public notice in the case of all
                        certification applications;
                            ``(ii) to the extent the certifying
                        authority determines to be appropriate, public
                        hearings in connection with specific
                        certification applications; and
                            ``(iii) a prefiling meeting as described in
                        subparagraph (B).
                    ``(B) Prefiling meeting.--
                            ``(i) Request.--Before submitting a
                        certification application, the prospective
                        applicant may request a prefiling meeting with
                        the certifying authority--
                                    ``(I) to ensure that the certifying
                                authority receives early notification
                                of projects for which a certification
                                under subsection (a) is necessary; and
                                    ``(II) to discuss informational
                                needs with the certifying authority
                                before submitting the application.
                            ``(ii) Response required.--If a prospective
                        applicant requests a prefiling meeting with a
                        certifying authority pursuant to clause (i),
                        the certifying authority shall--
                                    ``(I) respond to the request not
                                later than 30 days after the date on
                                which the request is received; and
                                    ``(II) hold the prefiling meeting
                                with the prospective applicant not
                                later than 60 days after the date on
                                which the request is received.
                    ``(C) Certification applications.--
                            ``(i) Application in writing.--A
                        certification application shall be made in
                        writing to the applicable certifying authority.
                            ``(ii) Requirements for complete
                        application.--A complete certification
                        application shall consist of the following:
                                    ``(I) Identification of each
                                applicant for the Federal license or
                                permit with respect to which the
                                certification application is made.
                                    ``(II) A statement that information
                                included in the certification
                                application is truthful, accurate, and
                                complete, to the best knowledge of each
                                such applicant.
                                    ``(III) In the case of a
                                certification application with respect
                                to an individual permit or license--
                                            ``(aa) identification of
                                        the Federal license or permit
                                        that is the subject of the
                                        certification application with
                                        respect to which the
                                        certification is requested;
                                            ``(bb) identification of
                                        any activity the conduct of
                                        which is subject to the Federal
                                        license or permit;
                                            ``(cc) identification of
                                        the location and nature of any
                                        discharge that may result from
                                        the activity, and the location
                                        of the receiving waters;
                                            ``(dd) a description of
                                        means that may be used to
                                        monitor, control, or manage any
                                        such discharge; and
                                            ``(ee) a list of all other
                                        Federal, interstate, Tribal,
                                        State, or local agency
                                        authorizations related to the
                                        requirement for a certification
                                        under subsection (a), and any
                                        approval or denial of such an
                                        authorization already received.
                                    ``(IV) Any additional materials
                                required by the applicable certifying
                                authority pursuant to clause (iii),
                                subject to the condition that the
                                additional materials shall only be
                                required with respect to certification
                                applications submitted after the date
                                on which the regulation described in
                                that clause has been promulgated.
                            ``(iii) Additional materials.--
                                    ``(I) In general.--A certifying
                                authority may promulgate regulations
                                establishing materials to be required
                                in completed certification applications
                                in addition to the materials described
                                in subclauses (I) through (III) of
                                clause (ii) that the certifying
                                authority determines are necessary to
                                demonstrate to the certifying authority
                                compliance with water quality
                                requirements.
                                    ``(II) Requirement.--In
                                promulgating regulations under
                                subclause (I), a certifying authority
                                shall only base the determination
                                regarding what additional materials are
                                needed on what can reasonably be
                                expected of an applicant at the time at
                                which a certification application is
                                submitted.
                                    ``(III) Effect of failure to
                                promulgate.--Beginning on or after
                                December 31, 2027, if a certifying
                                authority fails to promulgate
                                regulations under subclause (I), a
                                certification application to that
                                certifying authority shall be
                                considered complete if the
                                certification application includes all
                                of the items described in subclauses
                                (I) through (III) of clause (ii).
                                    ``(IV) Transition.--Prior to
                                December 31, 2027, a certifying
                                authority may require materials beyond
                                the materials described in subclauses
                                (I) through (III) of clause (ii)
                                without promulgating regulations under
                                subclause (I) through a single written
                                notice applicable to all applicants
                                submitting certification applications
                                if the certifying authority determines
                                that those additional materials are
                                necessary to demonstrate to the
                                certifying authority compliance with
                                water quality requirements and the
                                additional materials are those that can
                                be reasonably expected of an applicant
                                at the time at which a certification
                                application is submitted.
                            ``(iv) Acknowledgment of receipt.--Not
                        later than 3 days after the date on which an
                        applicant submits to a certifying authority a
                        certification application for an individual
                        Federal license or permit, the certifying
                        authority shall acknowledge receipt of the
                        certification application in writing.
                            ``(v) Notification of complete application
                        or identification of missing materials.--Not
                        later than 90 days after the date on which a
                        certifying authority acknowledges receipt of a
                        certification application under clause (iv),
                        the certifying authority shall--
                                    ``(I) provide the applicant a
                                written notification that the
                                certification application is complete;
                                or
                                    ``(II) identify to the applicant in
                                writing all specific additional
                                materials or information described in
                                clauses (ii) and, if applicable, (iii)
                                necessary for the certification
                                application to be considered complete,
                                including, for each such additional
                                piece of material or information, a
                                description of the water quality
                                requirement for which the additional
                                material or information is needed in
                                order to evaluate compliance with that
                                water quality requirement.
                            ``(vi) Petition to court.--
                                    ``(I) Right to petition.--An
                                applicant may petition for judicial
                                review of an alleged failure by a
                                certifying authority to act in
                                accordance with clauses (ii) through
                                (v) by filing a written petition in a
                                court of competent jurisdiction.
                                    ``(II) Considerations.--In
                                reviewing a petition under this
                                subclause, a reviewing court shall
                                consider--
                                            ``(aa) the administrative
                                        record, which shall consist of
                                        the materials required to be
                                        submitted under clause (ii);
                                            ``(bb) any materials or
                                        information identified by
                                        certifying authority as missing
                                        pursuant to a notification
                                        under clause (v)(II);
                                            ``(cc) the information
                                        submitted by the applicant to
                                        the certifying authority; and
                                            ``(dd) any evidence
                                        presented to the court by the
                                        applicant that suggests that
                                        the defense of the certifying
                                        authority to the petition is
                                        pretextual.
                                    ``(III) Court order.--If a court,
                                in reviewing a petition under this
                                clause, finds that a certifying
                                authority has failed to act in
                                accordance with any of clauses (ii),
                                (iv), and (v), the court shall provide
                                injunctive relief, as appropriate, to
                                give effect to this section.
                    ``(D) Denials of certification for individual
                license or permit.--If a certifying authority denies a
                certification application for an individual license or
                permit, the certifying authority shall provide to the
                applicant and the applicable Federal licensing or
                permitting agency--
                            ``(i) the specific water quality
                        requirements that the certifying authority
                        determined will be violated if certification
                        were granted;
                            ``(ii) a statement explaining why the
                        certifying authority determined the identified
                        water quality requirements will be violated;
                        and
                            ``(iii) if the denial is due to
                        insufficient information, a description of the
                        specific water quality data or information, if
                        any, that would be needed to evaluate whether
                        granting certification will comply with water
                        quality requirements.
            ``(4) Review period.--
                    ``(A) In general.--Subject to subparagraph (C) and
                in consultation with each certifying authority, a
                licensing or permitting agency shall, categorically or
                on a case-by-case basis for each certification
                application, establish a reasonable period of time (not
                to exceed 1 year from the date of receipt of the
                certification application) within which a certifying
                authority shall issue a final action on the
                certification application, which shall account for time
                required under applicable State or Tribal law for
                public notice and comment periods, if any.
                    ``(B) Failure to act.--If a certifying authority
                fails or refuses to issue a final action as described
                in paragraph (6) on a certification application by the
                end of the reasonable period of time established under
                subparagraph (A) and the reasonable period of time has
                not been extended in accordance with subparagraph (C),
                the requirement for a certification under subsection
                (a) shall be waived, except that the reasonable period
                of time shall restart in the event that the
                certification application is voluntarily withdrawn by
                the applicant and the applicant submits a new
                certification application.
                    ``(C) Requirement for extension.--With respect to a
                certification application, the reasonable period of
                time established under subparagraph (A) may only be
                extended if--
                            ``(i) the extension is requested, in
                        writing, by the applicant; and
                            ``(ii) the certifying authority concurs, in
                        writing, with the extension.
            ``(5) Waiver of certification requirement.--
                    ``(A) In general.--A certifying authority may, at
                any time during the reasonable period of time described
                in paragraph (4), affirmatively waive the requirement
                for a certification under subsection (a).
                    ``(B) No judicial review.--Notwithstanding any
                other provision of Federal law, including any provision
                of this section, a waiver of the requirement for a
                certification under this section shall not be subject
                to judicial review.
            ``(6) Final action.--Not later than the date on which the
        reasonable period of time established under paragraph (4) for a
        certification application ends or on the date of a waiver
        pursuant to paragraph (5)(A), as applicable, the certifying
        authority shall apply only 1 of the following final actions to
        the certification application:
                    ``(A) The certification application is granted.
                    ``(B) The certification application is granted with
                conditions.
                    ``(C) The certification application is denied.
                    ``(D) The certification requirements under
                subsection (a) have been waived in accordance with
                paragraph (4) or (5) with respect to the certification
                application.
    ``(f) Judicial Review.--
            ``(1) Burdens of proof.--When reviewing a denial of a
        certification under this section, a court shall place the
        burden of proof on the certifying authority to demonstrate, by
        clear and convincing evidence, that no reasonable modifications
        to or reasonable conditions on the certification would make it
        possible to grant the certification without violating water
        quality requirements.
            ``(2) Conditions.--When reviewing a challenge to 1 or more
        conditions required by a certifying authority under this
        section, a court shall place the burden of proof on the
        certifying authority to demonstrate, by clear and convincing
        evidence, that the 1 or more challenged conditions are--
                    ``(A) necessary to allow the certification to be
                made without violating water quality requirements; and
                    ``(B) the least burdensome condition or set of
                conditions for avoiding violation of water quality
                requirements.
    ``(g) Special Rule for Certain Certifications.--
            ``(1) Definition of interstate transmission line project.--
        In this subsection, the term `interstate transmission line
        project' means a project for the construction, modification, or
        upgrade of a transmission facility that is part of the bulk-
        power system (as defined in section 215(a) of the Federal Power
        Act (16 U.S.C. 824o(a))).
            ``(2) Limitation on certification requirements for certain
        interstate linear infrastructure.--Notwithstanding the first
        sentence of subsection (a)(1), any applicant for a certificate
        of public convenience and necessity for a project under section
        7 of the Natural Gas Act (15 U.S.C. 717f) or a Federal
        authorization or permit required to construct, modify, or
        operate an interstate transmission line project that may result
        in a direct point source discharge into the waters of the
        United States shall provide to the Federal licensing or
        permitting agency a certification from a certifying authority
        that such direct point source discharge complies with water
        quality requirements or a waiver pursuant to this section.
            ``(3) Certification of no limitation and standard.--In the
        case of any direct point source discharge described in this
        subsection for which there is not an applicable effluent
        limitation or other limitation under sections 301(b) and 302
        and for which there is not an applicable standard under
        sections 306 and 307, the certifying authority shall so
        certify, except that such a certification shall not satisfy
        section 511(c).
            ``(4) Review for compliance.--Notwithstanding subsection
        (a)(4)--
                    ``(A) prior to the initial operation of any
                federally licensed or permitted facility or activity
                that may result in a direct point source discharge into
                the waters of the United States and with respect to
                which a certification has been obtained pursuant to
                this subsection, which facility or activity is not
                subject to a Federal operating license or permit, the
                licensee or permittee shall provide an opportunity for
                the certifying authority to review the manner in which
                the facility or activity shall be operated or conducted
                for the purposes of assuring that applicable effluent
                limitations or other limitations or other applicable
                water quality requirements will not be violated;
                    ``(B) on notification by the certifying authority
                that the operation of any federally licensed or
                permitted facility or activity described in
                subparagraph (A) will violate applicable effluent
                limitations or other limitations or other water quality
                requirements, the applicable Federal agency may, after
                public hearing, suspend the Federal license or permit;
                and
                    ``(C) if a Federal license or permit is suspended
                pursuant to subparagraph (B), the Federal license or
                permit shall remain suspended until notification is
                received from the certifying authority that there is
                reasonable assurance that the facility or activity will
                not violate the applicable provisions of sections 301,
                302, 303, 306, and 307.
            ``(5) Limitation and monitoring requirements of certain
        linear infrastructure certifications.--Notwithstanding
        subsection (d)--
                    ``(A) any certification provided under this
                subsection shall set forth any effluent limitations and
                other limitations and monitoring requirements necessary
                to assure that any direct point source discharge
                subject to this subsection will comply with the
                applicable provisions of sections 301, 302, 303, 306,
                and 307; and
                    ``(B) any limitations and requirements set forth
                pursuant to subparagraph (A) shall be imposed by the
                licensing or permitting agency as a condition on any
                Federal license or permit subject to the provisions of
                this section.
            ``(6) Reasonable period of time.--Notwithstanding the
        periods of time in subsections (a)(1) and (e)(4), a licensing
        or permitting agency shall, categorically or on a case-by-case
        basis for each certification application, establish a
        reasonable period of time (not to exceed 9 months from the date
        of receipt of the certification application) within which a
        certifying authority shall issue a final action on the
        certification application under this subsection, which shall
        account for the time required under applicable State or Tribal
        law for public notice and comment periods.
    ``(h) Definitions.--In this section:
            ``(1) Certification application.--The term `certification
        application' means a request from an applicant for a
        certification described in subsection (a).
            ``(2) Certifying authority.--The term `certifying
        authority', with respect to a certification application, means,
        as applicable--
                    ``(A) the State or interstate agency to which the
                certification application was submitted, including an
                Indian Tribe that is treated as a State for purposes of
                this section pursuant to section 131.8 of title 40,
                Code of Federal Regulations; or
                    ``(B) if no State or interstate agency has the
                authority to provide the certification described in
                subsection (a), the Administrator.
            ``(3) Water quality requirements.--The term `water quality
        requirements' means--
                    ``(A) the applicable provisions of sections 301,
                302, 303, 306, and 307; and
                    ``(B) any Federal and State or Tribal laws
                (including regulations) implementing sections 301, 302,
                303, 306, and 307 that are applicable to discharges
                into waters of the United States.''.

SEC. 1203. PERMIT TERM FOR NPDES PERMITS.

    Section 402(b)(1)(B) of the Federal Water Pollution Control Act (33
U.S.C. 1342(b)(1)(B)) is amended by striking ``five years'' and
inserting ``10 years''.

SEC. 1204. PERMITS FOR DREDGED OR FILL MATERIAL.

    (a) Reducing Permitting Uncertainty.--
            (1) In general.--Section 404(c) of the Federal Water
        Pollution Control Act (33 U.S.C. 1344(c)) is amended--
                    (A) by striking ``(c) The Administrator'' and
                inserting the following:
    ``(c) Specification or Use of Defined Area.--
            ``(1) In general.--The Administrator'';
                    (B) in paragraph (1) (as so designated), by
                inserting ``during the period described in paragraph
                (2) and'' before ``after notice and opportunity for
                public hearings''; and
                    (C) by adding at the end the following:
            ``(2) Period of prohibition.--The Administrator may act
        pursuant to paragraph (1) only during the period that--
                    ``(A) begins on the date on which an applicant
                submits a complete application under this section; and
                    ``(B) ends on the date on which the Secretary
                issues the permit.''.
            (2) Applicability.--The amendments made by paragraph (1)
        shall apply to a permit application submitted under section 404
        of the Federal Water Pollution Control Act (33 U.S.C. 1344)
        after the date of enactment of this Act.
    (b) Nationwide Permitting Improvement.--Section 404(e) of the
Federal Water Pollution Control Act (33 U.S.C. 1344(e)) is amended--
            (1) by striking ``(e)(1) In carrying'' and inserting the
        following:
    ``(e) General Permits on State, Regional, or Nationwide Basis.--
            ``(1) Permits authorized.--In carrying'';
            (2) in paragraph (2)--
                    (A) by striking ``(2) No general'' and inserting
                the following:
            ``(2) Term.--
                    ``(A) In general.--No general'';
                    (B) in subparagraph (A) (as so designated), by
                striking ``five years'' and inserting ``10 years''; and
                    (C) by adding at the end the following:
                    ``(B) Timing of modification.--The Secretary may
                modify a general permit pursuant to subparagraph (A)
                during the term of the general permit or during the
                renewal of the general permit.''; and
            (3) by adding at the end the following:
            ``(3) Considerations.--In determining the environmental
        effects of an activity under paragraph (1) or (2), the
        Secretary--
                    ``(A) shall consider only the effects on compliance
                with water quality requirements (as defined in section
                401(h)) of any discharge of dredged or fill material
                resulting from the activity; and
                    ``(B) shall consider any effects of a discharge of
                dredged or fill material into less than 2 acres of
                navigable waters to be a minimal adverse environmental
                effect.
            ``(4) Nationwide permits for activities.--
                    ``(A) General permits authorized.--Notwithstanding
                any other provision of this section, the Secretary
                shall maintain general permits on a nationwide basis
                for activities described in subparagraph (B).
                    ``(B) Activities described.--An activity referred
                to in subparagraph (A) is an activity--
                            ``(i) authorized under Nationwide Permit
                        12, Nationwide Permit 14, Nationwide Permit 27,
                        Nationwide Permit 43, Nationwide Permit 57, or
                        Nationwide Permit 58, as those nationwide
                        permits are described in and reissued pursuant
                        to the final rule of the Corps of Engineers
                        entitled `Reissuance and Modification of
                        Nationwide Permits' (91 Fed. Reg. 768 (January
                        8, 2026)); and
                            ``(ii) that results in a discharge of
                        dredged or fill material into less than 2 acres
                        of navigable waters for each single and
                        complete project (as defined in section 330.2
                        of title 33, Code of Federal Regulations (as in
                        effect on the date of enactment of this
                        paragraph), including a single and complete
                        linear project and a single and complete non-
                        linear project (as those terms are defined in
                        the final rule of the Corps of Engineers
                        entitled `Reissuance and Modification of
                        Nationwide Permits' (91 Fed. Reg. 768 (January
                        8, 2026))).
                    ``(C) Retention of general and individual
                permitting authority.--Nothing in this paragraph
                prohibits the Secretary from issuing--
                            ``(i) general permits on a regional or
                        State basis; or
                            ``(ii) individual permits for linear
                        infrastructure projects.
            ``(5) Reissuance of nationwide permits.--
                    ``(A) In general.--Subject to subparagraph (B), in
                determining whether to reissue a general permit issued
                on a nationwide basis under this subsection--
                            ``(i) no consultation with an applicable
                        State pursuant to section 6(a) of the
                        Endangered Species Act of 1973 (16 U.S.C.
                        1535(a)) is required;
                            ``(ii) no consultation with a Federal
                        agency pursuant to section 7(a)(2) of that Act
                        (16 U.S.C. 1536(a)(2)) is required;
                            ``(iii) the requirements of section
                        102(2)(C) of the National Environmental Policy
                        Act of 1969 (42 U.S.C. 4332(2)(C)) shall be
                        satisfied by preparing a programmatic
                        environmental assessment with respect to the
                        general permit; and
                            ``(iv) no consultation under section 306108
                        of title 54, United States Code, is required.
                    ``(B) Requirement.--Clauses (i) through (iv) of
                subparagraph (A) shall only apply to a general permit
                being reissued pursuant to that subparagraph if the
                general permit does not--
                            ``(i) narrow or eliminate preconstruction
                        requirements; or
                            ``(ii) raise the threshold for such
                        preconstruction requirements.''.

SEC. 1205. JUDICIAL REVIEW TIMELINE CLARITY.

    Section 404 of the Federal Water Pollution Control Act (33 U.S.C.
1344) is amended--
            (1) in subsection (t), by striking ``(t) Nothing in this
        section'' and inserting the following:
    ``(u) Savings Provision.--Nothing in this section''; and
            (2) by inserting after subsection (s) the following:
    ``(t) Judicial Review.--
            ``(1) Statute of limitations.--Notwithstanding any
        applicable provision of law relating to statutes of
        limitations--
                    ``(A) an action seeking judicial review, under
                subchapter II of chapter 5, and chapter 7, of title 5,
                United States Code (commonly known as the
                `Administrative Procedure Act'), or any other
                applicable provision of law, of the approval by the
                Administrator of a State permit program pursuant to
                this section shall be filed not later than the date
                that is 150 days after the date on which the approval
                was issued, unless a shorter time period is otherwise
                provided for by law;
                    ``(B) an action seeking judicial review, under
                subchapter II of chapter 5, and chapter 7, of title 5,
                United States Code (commonly known as the
                `Administrative Procedure Act'), or any other
                applicable provision of law, of an individual permit or
                general permit issued under this section shall be filed
                not later than the date that is 150 days after the date
                on which the permit was issued, unless a shorter time
                period is otherwise provided for by law; and
                    ``(C) an action seeking judicial review, under
                subchapter II of chapter 5, and chapter 7, of title 5,
                United States Code (commonly known as the
                `Administrative Procedure Act'), or any other
                applicable provision of law, of a verification that an
                activity involving a discharge of dredged or fill
                material is authorized by a general permit issued under
                this section shall be filed not later than the date
                that is 150 days after the date on which the
                verification was issued, unless a shorter time period
                is otherwise provided for by law.
            ``(2) Limitation on commencement of certain actions.--
                    ``(A) In general.--Notwithstanding any other
                provision of law but subject to subparagraph (B), no
                action described in subparagraph (A) or (B) of
                paragraph (1) may be commenced unless the action--
                            ``(i) is filed by a party that submitted a
                        comment--
                                    ``(I) during the public comment
                                period for the administrative
                                proceedings related to the action; and
                                    ``(II) that is sufficiently
                                detailed to put the Administrator, the
                                Secretary, or the State, as applicable,
                                on notice of the issue on which the
                                party seeks judicial review; and
                            ``(ii) is related to that comment.
                    ``(B) Limitation.--The limitation under
                subparagraph (A) shall only apply to actions for
                which--
                            ``(i) a draft of the action was published
                        in the Federal Register; and
                            ``(ii)(I) the applicable agency provided a
                        public comment period of not less than 30 days;
                        and
                            ``(II) such public comment period occurred
                        after the date of enactment of the Bipartisan
                        American Affordability and Jobs Act of 2026.
            ``(3) Remedies for actions relating to permits.--If a court
        determines that the Secretary or a State, as applicable, did
        not comply with the requirements of this section in issuing an
        individual or general permit under this section, or in
        verifying that an activity involving a discharge of dredged or
        fill material is authorized by a general permit issued under
        this section, or otherwise was arbitrary and capricious under
        subchapter II of chapter 5, and chapter 7, of title 5, United
        States Code (commonly known as the `Administrative Procedure
        Act'), as applicable--
                    ``(A) the court shall remand the matter to the
                Secretary or the State, as applicable, for further
                proceedings consistent with the determination of the
                court;
                    ``(B) with respect to a determination regarding the
                issuance of an individual or general permit under this
                section, the court may not vacate, revoke, enjoin, or
                otherwise limit the permit unless the court finds that
                activities authorized under the permit would present an
                imminent and substantial danger to human health or the
                environment for which there is no other equitable
                remedy available under the law; and
                    ``(C) with respect to a determination regarding a
                verification that an activity involving a discharge of
                dredged or fill material is authorized by a general
                permit issued under this section, the court may not
                enjoin or otherwise limit the discharge unless the
                court finds that the activity would present an imminent
                and substantial danger to human health or the
                environment for which there is no other equitable
                remedy available under the law.
            ``(4) Timeline to act on court order.--If a court remands a
        matter under paragraph (3), the court shall set and enforce a
        reasonable schedule and deadline, which may not exceed 180 days
        from the date on which the court remands the matter, except as
        otherwise required by law, for the Administrator, the
        Secretary, or the State, as applicable, to take such actions as
        the court may order.''.

               TITLE III--ENDANGERED SPECIES ACT OF 1973

SEC. 1301. DEFINITIONS.

    Section 3 of the Endangered Species Act of 1973 (16 U.S.C. 1532) is
amended--
            (1) by redesignating paragraphs (2) through (10) as
        paragraphs (3) through (11), respectively;
            (2) by inserting after paragraph (1) the following:
            ``(2) The terms `best scientific and commercial data
        available' and `best scientific data available'--
                    ``(A) mean all relevant and objective scientific
                and commercial information available at the time of the
                agency action; and
                    ``(B) include credible and reliable data,
                quantitative analyses, conceptual and numerical models,
                and model results that--
                            ``(i) account for known or potential
                        sources of error;
                            ``(ii) are applied using prevailing
                        principles, methods, tools, and professional
                        standards of practice; and
                            ``(iii) are impartially gathered and
                        objectively applied without presumptions or
                        policy prescriptions that bias the
                        application.''; and
            (3) in paragraph (17), by striking ``the Trust Territory of
        the Pacific Islands'' and inserting ``the Commonwealth of the
        Northern Mariana Islands''.

SEC. 1302. TIMELINE FOR SECTION 7 CONSULTATIONS.

    Section 7(b)(1) of the Endangered Species Act of 1973 (16 U.S.C.
1536(b)(1)) is amended--
            (1) in subparagraph (A), by striking ``90-day'' and
        inserting ``60-day'';
            (2) in subparagraph (B)--
                    (A) in the matter preceding clause (i)--
                            (i) by striking ``90 days'' and inserting
                        ``60 days''; and
                            (ii) by striking ``90th day'' and inserting
                        ``60th day'';
                    (B) in clause (i), in the matter preceding
                subclause (I), by striking ``150th day'' and inserting
                ``100th day'';
                    (C) in clause (ii), by striking ``150 or more'' and
                inserting ``100 or more''; and
                    (D) in the undesignated matter following clause
                (ii)--
                            (i) by striking ``the preceding sentence''
                        and inserting ``subparagraph (B)''; and
                            (ii) by striking ``The Secretary'' and
                        inserting the following:
            ``(C) The Secretary''; and
            (3) by inserting after subparagraph (C) (as so designated)
        the following:
            ``(D) If the consultation period proposed to be agreed to
        between the Secretary and the Federal agency under subparagraph
        (B) extends beyond 145 days and the Secretary and the Federal
        agency have not provided a written statement to, or obtained
        consent from, a permit or license applicant under clause (i) or
        (ii), as applicable, of that subparagraph during such period,
        the applicant shall be eligible for relief under section 706(1)
        of title 5, United States Code.
            ``(E)(i) In the case of an agency action that requires the
        preparation of an environmental document (as defined in section
        3 of the National Environmental Policy Act of 1969), the
        consultation process under subsection (a)(2) shall be completed
        by not later than the date on which the applicable
        environmental document (as so defined) for the agency action is
        completed in accordance with section 107(g) of the National
        Environmental Policy Act of 1969 (42 U.S.C. 4336a(g)), unless
        the Secretary approves an extension of the deadline due to
        extraordinary circumstances beyond the control, and not due to
        any action, of the consulting parties.
            ``(ii) The requirement under clause (i) shall not be
        construed to extend the deadlines described in subparagraphs
        (A) through (D).''.

SEC. 1303. PROJECTS IN THE OPERATIONAL RIGHT-OF-WAY.

    Section 7 of the Endangered Species Act of 1973 (16 U.S.C. 1536) is
amended by adding at the end the following:
    ``(q) Projects in the Operational Right-of-way.--Notwithstanding
subsections (g) and (h), any project that is categorically excluded
from the requirements of the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.) pursuant to section 1316 of the Moving Ahead
for Progress in the 21st Century Act (23 U.S.C. 109 note; Public Law
112-141) shall be exempt from paragraphs (2), (3), and (4) of
subsection (a).''.

SEC. 1304. STATE ASSUMPTION OF CONSULTATION RESPONSIBILITIES.

    The Endangered Species Act of 1973 is amended by inserting after
section 7 (16 U.S.C. 1536) the following:

``SEC. 7A. STATE ASSUMPTION OF CONSULTATION RESPONSIBILITIES.

    ``(a) Definitions.--In this section:
            ``(1) Program.--The term `program' means the program
        carried out by the Secretary pursuant to this section.
            ``(2) Secretary.--The term `Secretary' means the Secretary
        of the Interior.
            ``(3) State agency.--The term `State agency' means any
        agency, department, board, commission, or other governmental
        entity in a State with primary jurisdiction over environmental
        or wildlife management matters in the State, as determined by
        the Governor of the State.
    ``(b) Program.--
            ``(1) In general.--Except as provided in this subsection,
        the Secretary shall carry out a program under which the
        Secretary may assign the consultation responsibilities of the
        Secretary described in paragraph (4)(A) to States.
            ``(2) Limitations on assumptions.--
                    ``(A) In general.--Except as provided in
                subparagraph (B), the Secretary may not assign the
                consultation responsibilities of the Secretary
                described in paragraph (4)(A) to any State for a
                project or agency action (as referred to in section 7)
                that exceeds the boundaries of the State.
                    ``(B) Limitation.--For any project or agency action
                (as referred to in section 7) that is solely within the
                boundaries of 1 State, but that is within an area
                affected that exceeds the boundaries of the State, a
                State that assumes responsibility under paragraph (4)
                for the project or agency action (as referred to in
                section 7) shall consult with--
                            ``(i) if any other State has assumed
                        responsibility under that paragraph, the
                        jurisdiction of which is within that area
                        affected, such State; or
                            ``(ii) if there is no State described in
                        clause (i), the Secretary.
            ``(3) Implementing regulation.--
                    ``(A) In general.--Not later than 270 days after
                the date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, the Secretary shall
                issue a proposed rule to establish a program that would
                comply with the requirements of this section and ensure
                that approved State assumption programs adequately
                carry out the consultation requirements under section 7
                (referred to in this section as the `implementing
                regulation').
                    ``(B) Public comment.--The proposed rule issued
                under subparagraph (A) shall be made available for
                public comment for a period of not less than 60 days,
                during which the Secretary shall solicit comment from
                States on the proposed rule.
                    ``(C) Limitation.--The rule issued under
                subparagraph (A) shall not include any requirement that
                is not necessary to carry out this section.
            ``(4) Assumption of responsibility.--
                    ``(A) In general.--Subject to the requirements of
                this section and the implementing regulation, with the
                written agreement of the Secretary and a State, which
                may be in the form of a memorandum of understanding,
                the Secretary may assign, and the State may assume, the
                consultation responsibilities of the Secretary within
                the boundary of the State under subsections (a), (b),
                and (c) of section 7.
                    ``(B) Certain projects and agency actions.--A State
                may not assume responsibility under the program until
                the date on which--
                            ``(i) the implementing regulation takes
                        effect; and
                            ``(ii) the State certifies to the Secretary
                        that the State has secured the financial,
                        legal, personnel, and other resources described
                        in subsection (c)(2)(B).
                    ``(C) Federal responsibility.--Any responsibility
                of the Secretary not explicitly assumed by the State by
                written agreement under the program shall remain the
                responsibility of the Secretary.
    ``(c) State Participation.--
            ``(1) Requirements for participating states.--Each State is
        eligible to participate in the program if the State meets each
        requirement described in this section and the implementing
        regulation.
            ``(2) Application.--
                    ``(A) In general.--A State seeking to participate
                in the program shall submit to the Secretary an
                application at such time, in such manner, and
                containing such information as the Secretary may
                require, in accordance with subparagraph (B).
                    ``(B) Requirements.--As part of the implementing
                regulation, the Secretary shall establish requirements
                relating to applications submitted by States under
                subparagraph (A), including, at a minimum, requirements
                that a State provide--
                            ``(i) verification of the financial and
                        legal resources necessary to carry out the
                        authority that may be granted to the State
                        under the program;
                            ``(ii) verification of the personnel
                        resources or a plan to hire the personnel, not
                        later than 1 year after the date on which the
                        application is approved, necessary to carry out
                        the authority that may be granted to the State
                        under the program;
                            ``(iii) verification that the State will
                        waive sovereign immunity for the
                        responsibilities assumed by the State under the
                        program; and
                            ``(iv) evidence of the notice and
                        solicitation of public comment by the State
                        relating to participation of the State in the
                        program, including--
                                    ``(I) copies of comments received
                                from that solicitation;
                                    ``(II) a brief summary of those
                                comments; and
                                    ``(III) a description of ways in
                                which those comments will be
                                incorporated by the State during the
                                participation of the State in the
                                program.
                    ``(C) Denial.--On denial of an application
                submitted by a State under subparagraph (A)--
                            ``(i) the Secretary shall--
                                    ``(I) respond to the State, in
                                writing, identifying the reasons for
                                the denial, subject to the condition
                                that such reasons shall only include a
                                determination by the Secretary that the
                                State did not demonstrate the legal,
                                financial, or personnel capability to
                                assume responsibility under the
                                program; and
                                    ``(II) at the request of the State,
                                provide technical assistance to the
                                State to address the reasons identified
                                under subclause (I); and
                            ``(ii) the State may reapply in accordance
                        with the requirements of subparagraphs (A) and
                        (B).
            ``(3) Public notice.--
                    ``(A) In general.--Not less than 60 days before the
                date of submission of an application of a State under
                paragraph (2)(A), the State shall, in accordance with
                the applicable public notice law of the State--
                            ``(i) publish the complete application of
                        the State; and
                            ``(ii) provide an opportunity for public
                        comment on the application for a period of not
                        less than 30 days.
                    ``(B) Response to comments.--Notwithstanding any
                other provision of law, a State shall be required to
                respond to public comments received under subparagraph
                (A)(ii).
            ``(4) Selection criteria.--The Secretary shall approve the
        application of a State submitted under paragraph (2)(A) if--
                    ``(A) the Secretary determines that the State has
                demonstrated the legal, financial, and current or
                future personnel capability to assume the
                responsibility;
                    ``(B) the Secretary has made an affirmative
                determination that the State has met the requirements
                to implement the program, as described in this section
                and the implementing regulation; and
                    ``(C) the head of the State agency enters into a
                written agreement with the Secretary described in
                subsection (d)(1).
            ``(5) Failure to approve or deny application.--If the
        Secretary fails to make a determination with respect to any
        application submitted under paragraph (2)(A) within 180 days
        after the date on which the Secretary receives that
        application, the inaction shall be considered a failure to act
        under section 107(g)(3) of the National Environmental Policy
        Act of 1969 (42 U.S.C. 4336a(g)(3)).
    ``(d) Written Agreement.--
            ``(1) In general.--A written agreement referred to in
        subsection (c)(4)(C) shall--
                    ``(A) be executed by the Governor or the head of
                the State agency that would assume responsibility under
                the program;
                    ``(B) be in such form as the Secretary may
                prescribe;
                    ``(C) provide that the State--
                            ``(i) agrees to assume all responsibilities
                        of the Secretary described in subsection
                        (b)(4);
                            ``(ii) expressly consents, on behalf of the
                        State, to accept the jurisdiction of the
                        Federal courts for the compliance, discharge,
                        and enforcement of any responsibility of the
                        Secretary assumed by the State;
                            ``(iii) certifies that State laws
                        (including regulations) are in effect that--
                                    ``(I) authorize the State to take
                                the actions necessary to carry out the
                                responsibilities being assumed; and
                                    ``(II) are comparable to section
                                552 of title 5, United States Code,
                                including providing that any decision
                                regarding the public availability of a
                                document under those State laws is
                                reviewable by a court of competent
                                jurisdiction;
                            ``(iv) agrees to maintain the legal
                        resources, financial resources, and personnel
                        capacity and expertise necessary to carry out
                        the responsibilities being assumed; and
                            ``(v) agrees to meet the same deadlines for
                        consultations that the Secretary would be
                        required to meet under--
                                    ``(I) section 7; and
                                    ``(II) section 107 of the National
                                Environmental Policy Act of 1969 (42
                                U.S.C. 4336a);
                    ``(D) require the State to provide to the Secretary
                any information the Secretary reasonably considers
                necessary to ensure that the State is adequately
                carrying out the responsibilities assigned to the
                State;
                    ``(E) be renewable;
                    ``(F) have a term of not more than 10 years; and
                    ``(G) be published in the Federal Register not
                later than 15 days after execution.
            ``(2) Role of secretary.--The Secretary shall not delegate
        the responsibilities of the Secretary with respect to entering
        into a written agreement with a State under paragraph (1).
    ``(e) Jurisdiction.--
            ``(1) In general.--The district courts of the United States
        shall have exclusive jurisdiction over any civil action against
        a State for failure to carry out any responsibility of the
        State under the program.
            ``(2) Legal standards and requirements.--A civil action
        under paragraph (1) shall be governed by the legal standards
        and requirements that would apply in such a civil action
        against the Secretary had the Secretary taken the actions in
        question.
            ``(3) Intervention.--The Secretary shall have the right to
        intervene in any action described in paragraph (1).
    ``(f) Effect of Assumption of Responsibility.--
            ``(1) In general.--A State that assumes responsibility
        under subsection (b)(4) shall be solely responsible for
        carrying out, in lieu of and without further approval of the
        Secretary, the responsibilities assumed under that subsection,
        until the Secretary or the State, as applicable, terminates the
        participation of the State in the program in accordance with
        paragraph (1) or (2) of subsection (k), as applicable.
            ``(2) Permit or license applicant election.--
        Notwithstanding a State assumption of responsibility under
        subsection (b)(4), a permit or license applicant may elect for
        the relevant Federal agency to consult with the Secretary
        within the boundary of the State under subsections (a), (b),
        and (c) of section 7 rather than with the State under the
        program.
    ``(g) Limitations on Agreements.--Nothing in this section permits a
State to assume any rulemaking authority of the Secretary under any
Federal law.
    ``(h) Audits.--
            ``(1) In general.--To ensure compliance by a State with any
        agreement of the State under subsection (c)(4)(C) (including
        compliance by the State with all Federal laws for which
        responsibility is assumed under subsection (b)(4)), for each
        State participating in the program, the Secretary shall--
                    ``(A) not later than 180 days after the date of
                execution of the agreement, meet with the State to
                review implementation of the agreement and discuss
                plans for the first annual audit;
                    ``(B) conduct annual audits during each of the
                first 4 years of State participation; and
                    ``(C) ensure that the time period for completing an
                audit, from initiation to completion (including public
                comment and responses to those comments), does not
                exceed 180 days.
            ``(2) Public availability and comment.--
                    ``(A) In general.--An audit conducted under
                paragraph (1) shall be provided to the public for
                comment.
                    ``(B) Response.--Not later than 60 days after the
                date on which the period for public comment ends--
                            ``(i) the Secretary shall respond to public
                        comments received under subparagraph (A); and
                            ``(ii) to the extent necessary, the
                        applicable State agency may respond to those
                        comments.
            ``(3) Audit team.--
                    ``(A) In general.--Subject to subparagraph (C), an
                audit conducted under paragraph (1) shall be carried
                out by an audit team determined by the Secretary, in
                consultation with the State, in accordance with
                subparagraph (B).
                    ``(B) Consultation.--Consultation with the State
                under subparagraph (A) shall include a reasonable
                opportunity for the State to review and provide
                comments on the proposed members of the audit team.
                    ``(C) Limitation.--An audit team shall only
                include--
                            ``(i) qualified staff of regional and
                        headquarters offices of the United States Fish
                        and Wildlife Service;
                            ``(ii) staff of the Department of the
                        Interior Office of Inspector General; and
                            ``(iii) staff of the applicable State
                        agency.
    ``(i) Monitoring.--
            ``(1) In general.--After the fourth year of the
        participation of a State in the program, the Secretary shall
        monitor compliance by the State with the written agreement
        entered into under subsection (c)(4)(C), including the
        provision by the State of financial resources to carry out the
        written agreement.
            ``(2) Resumption of annual audits.--If the Secretary
        determines that there is reasonable cause to believe that a
        State is not complying with a written agreement entered into
        under subsection (c)(4)(C) pursuant to monitoring under
        paragraph (1), the Secretary may require the resumption of
        annual audits under subsection (h).
    ``(j) Report to Congress.--The Secretary shall submit to the
Committee on Environment and Public Works of the Senate and the
Committee on Natural Resources of the House of Representatives an
annual report that describes the administration of the program, which
shall include an identification of--
            ``(1) a list of active written agreements entered into
        under subsection (c)(4)(C) being carried out;
            ``(2) a list of pending written agreements entered into
        under that subsection;
            ``(3) a list of applications denied under subsection
        (c)(2)(C) and the reasons for those denials, if any; and
            ``(4) the results of any audits completed pursuant to
        subsection (h) in the year covered by the report.
    ``(k) Termination.--
            ``(1) Termination by the secretary.--The Secretary shall
        terminate the participation of a State in the program if--
                    ``(A) the Secretary determines that the State is
                not adequately carrying out the responsibilities
                assigned to the State;
                    ``(B) the Secretary provides to the State--
                            ``(i) a notification of the determination
                        of noncompliance;
                            ``(ii) a period of not less than 120 days
                        to take corrective action as the Secretary
                        determines to be necessary to comply with the
                        applicable written agreement; and
                            ``(iii) on request of the Governor of the
                        State, a detailed description of each
                        responsibility in need of corrective action
                        relating to an inadequacy identified under
                        subparagraph (A); and
                    ``(C) the State, after the notification and period
                provided under subparagraph (B)(i), fails to take
                satisfactory corrective action, as determined by the
                Secretary.
            ``(2) Termination by the state.--The State may terminate
        the participation of the State in the program at any time by
        providing to the Secretary a notice not later than the date
        that is 90 days before the date of termination, subject to such
        terms and conditions as the Secretary may provide.
    ``(l) Outreach and Capacity Building.--
            ``(1) Outreach.--The Secretary shall require the Director
        of the United States Fish and Wildlife Service (referred to in
        this subsection as the `Director') to conduct outreach and
        education activities to States with respect to the program.
            ``(2) Capacity building.--The Director, in cooperation with
        relevant State officials, shall provide education, training,
        peer-exchange, and other initiatives as appropriate--
                    ``(A) to assist States in developing the capacity
                to participate in the program; and
                    ``(B) to promote information sharing and
                collaboration among States with respect to the program.
            ``(3) Delegation.--The Director may delegate the outreach
        and education activities and capacity building requirements
        under this subsection to a relevant field or regional office of
        the United States Fish and Wildlife Service.
    ``(m) Agency Deemed to Be Federal Agency.--A State agency that is
assigned a responsibility under a written agreement under the program
shall be deemed to be an agency for the purposes of section 2412 of
title 28, United States Code.''.

SEC. 1305. JUDICIAL REVIEW.

    Section 7(n) of the Endangered Species Act of 1973 (16 U.S.C.
1536(n)) is amended--
            (1) in the first sentence, by striking ``Any person, as
        defined by section 3(13) of this Act,'' and inserting the
        following:
            ``(1) In general.--Any person'';
            (2) in paragraph (1) (as so designated), by redesignating
        paragraphs (1) and (2) as subparagraphs (A) and (B),
        respectively; and
            (3) by adding at the end the following:
            ``(2) Petition for review.--
                    ``(A) In general.--Except as provided in section
                111 of the National Environmental Policy Act of 1969
                and section 306108(c)(9)(E) of title 54, United States
                Code, and subject to subparagraph (B), any person may
                obtain judicial review under chapter 7 of title 5,
                United States Code, of any opinion issued by the
                Secretary under subsection (b) in the United States
                Court of Appeals for the District of Columbia Circuit
                by filing in such court not later than 150 days after
                the date on which the opinion is made public a written
                petition for review.
                    ``(B) Limitation.--If an opinion issued by the
                Secretary under subsection (b) relates to an agency
                action for which venue for judicial review of such
                action is provided by section 111 of the National
                Environmental Policy Act of 1969 or section
                306108(c)(9)(E) of title 54, United States Code, such
                venue shall control.
            ``(3) Definition of made public.--In this subsection, the
        term `made public', with respect to an opinion issued by the
        Secretary under subsection (b), means that the opinion is
        published in a single location on the primary website of the
        applicable Federal agency with--
                    ``(A) hyperlinks to the document prominently
                displayed on the website; and
                    ``(B) the date of initial publication of the
                document displayed and maintained on the website.''.

SEC. 1306. LISTING DETERMINATIONS.

    Section 4 of the Endangered Species Act of 1973 (16 U.S.C. 1533) is
amended by adding at the end the following:
    ``(j) State Data.--In making a determination to list, or delist, a
species as a threatened species or an endangered species under this
section, the Secretary shall accept and integrate State-collected data,
subject to the condition that the State-collected data meets the
definition of `best scientific and commercial data available'.''.

SEC. 1307. AUTHORIZATION OF APPROPRIATIONS.

    There is authorized to be appropriated $150,000,000 for each of
fiscal years 2027 through 2031--
            (1) to carry out section 7 of the Endangered Species Act of
        1973 (16 U.S.C. 1536); and
            (2) to support State participation in the program under
        section 7A of that Act.

SEC. 1308. NATIONAL FISH AND WILDLIFE FOUNDATION COASTAL STATE FUND.

    (a) Definitions.--In this section:
            (1) Coastal county.--The term ``coastal county'' has the
        meaning given the term by the National Oceanic and Atmospheric
        Administration in the document entitled ``NOAA's List of
        Coastal Counties for the Bureau of the Census'' (or a similar
        successor document).
            (2) Coastal state.--The term ``coastal State'' has the
        meaning given the term ``coastal state'' in section 304 of the
        Coastal Zone Management Act of 1972 (16 U.S.C. 1453).
            (3) Foundation.--The term ``Foundation'' means the National
        Fish and Wildlife Foundation established by section 2(a) of the
        National Fish and Wildlife Foundation Establishment Act (16
        U.S.C. 3701(a)).
            (4) Program.--The term ``program'' means the National Fish
        and Wildlife Foundation Coastal State Fund established under
        subsection (b).
            (5) Tidal shoreline.--The term ``tidal shoreline'' means
        the length of tidal shoreline or Great Lake shoreline based on
        the most recently available data from or accepted by the Office
        of Coast Survey of the National Oceanic and Atmospheric
        Administration.
    (b) Establishment of Program.--Not later than 1 year after the date
of enactment of this Act, subject to the availability of
appropriations, the Foundation shall establish and carry out a program,
to be known as the ``National Fish and Wildlife Foundation Coastal
State Fund'', to award grants to coastal States to support State
programs and activities that implement natural and nature-based
infrastructure, habitat restoration and protection, and related
capacity building and planning.
    (c) Allocation of Amounts.--Of the amounts made available to carry
out the program each fiscal year, subject to subsection (d), such
amounts shall be allocated to grants for coastal States under the
program in accordance with the following:
            (1) 70 percent shall be allocated equally among coastal
        States.
            (2) 15 percent shall be allocated on the basis of the ratio
        of tidal shoreline in a coastal State to the tidal shoreline of
        all coastal States.
            (3) 15 percent shall be allocated on the basis of the ratio
        of population density of the coastal counties of a coastal
        State to the average population density of all coastal counties
        based on the most recent data available from the Bureau of the
        Census.
    (d) Limitation for Single Coastal State.--
            (1) In general.--Notwithstanding subsection (c), not more
        than 5 percent of the total amounts allocated under that
        subsection may be allocated to any single coastal State, and
        any amount exceeding that limitation shall be reallocated, in
        accordance with paragraph (2), equally among the remaining
        coastal States.
            (2) Reallocation limitation.--If a reallocation of amounts
        under paragraph (1) results in another coastal State exceeding
        the limitation described in that paragraph, such amounts shall
        be reallocated among the remaining coastal States that have not
        reached that limitation.
    (e) Funding.--
            (1) Authorization of appropriations.--There is authorized
        to be appropriated to the Foundation to carry out the program
        $50,000,000 for each of fiscal years 2028 through 2032.
            (2) Additional funding.--In addition to the amounts made
        available pursuant to paragraph (1), the Foundation may use
        such additional amounts as may be made available to carry out
        the program.
            (3) Timely transfer; availability.--Federal funds
        appropriated for purposes of the program shall--
                    (A) be distributed by the Secretary of the Treasury
                to the Foundation not later than 60 days after the date
                on which the appropriation is made; and
                    (B) remain available until expended.

SEC. 1309. STATE WILDLIFE ACTION PLANS.

    Section 4(e)(3) of the Pittman-Robertson Wildlife Restoration Act
(16 U.S.C. 669c(e)(3)) is amended--
            (1) by striking the paragraph designation and all that
        follows through ``If the Secretary'' and inserting the
        following:
            ``(3)(A) If the Secretary'';
            (2) in subparagraph (A) (as so designated)--
                    (A) by inserting ``, not later than 180 days after
                the date on which the State submitted the comprehensive
                plan,'' after ``, the Secretary''; and
                    (B) by striking ``, as redesignated''; and
            (3) by adding at the end the following:
            ``(B) Upon submission of a comprehensive plan by a State
        under paragraph (1), the Secretary shall--
                    ``(i) conditionally authorize the implementation of
                the wildlife conservation and restoration program of
                the State; and
                    ``(ii) set aside amounts as described in
                subparagraph (A).
            ``(C) The Secretary, in consultation with the States, shall
        develop a process to ensure sufficient and timely review of
        comprehensive plans submitted by States under paragraph (1) and
        final approval of the wildlife conservation and restoration
        program of such States not later than 180 days after the date
        on which a State submits such a comprehensive plan.
            ``(D) It is the intent of Congress that the Secretary
        prioritize--
                    ``(i) the timely review of comprehensive plans
                submitted by States under paragraph (1); and
                    ``(ii) the approval of the wildlife conservation
                and restoration programs of such States.
            ``(E) Not later than June 1 of the year immediately
        following the year in which a State submits a comprehensive
        plan under paragraph (1), if the Secretary does not approve the
        wildlife conservation and restoration program of the State
        under subparagraph (A) within the time described in that
        subparagraph, the Secretary shall submit to the Chair and
        Ranking Member of the Committee on Natural Resources of the
        House of Representatives and the Committee on Environment and
        Public Works of the Senate a report on the status of such
        comprehensive plan, which shall include the reason why the
        wildlife conservation and restoration program was not so
        approved.''.

                      TITLE IV--PROJECT CERTAINTY

SEC. 1401. MAINTAINING FEDERAL AUTHORIZATIONS OR PERMITS FOR PROJECTS
              WITH NON-FEDERAL SPONSORS.

    (a) Definitions.--In this section:
            (1) Covered project or action.--The term ``covered project
        or action'' means a project or action with a non-Federal
        project sponsor that has secured all necessary Federal
        authorizations or permits for construction or operation.
            (2) Federal authorization or permit.--The term ``Federal
        authorization or permit'' means an authorization, permit,
        record of decision, right-of-way, finding of no significant
        impact, verification, extension, construction and operations
        plan, biological opinion, incidental take statement,
        concurrence, variance, departure, determination, or any other
        similar approval or order that is necessary, including any
        determination by a Federal department or agency that additional
        authorizations or permits are not necessary, for the
        construction or operation at normal capacity of a project.
    (b) Maintenance of Authorizations and Permits.--
            (1) In general.--For covered projects or actions, a Federal
        department or agency shall not take any new action that would
        revoke, rescind, withdraw, terminate, suspend, vacate, remand,
        reopen, materially amend, or materially alter a Federal
        authorization or permit in effect on or after November 6, 2026,
        or take any other action to interfere with or prevent the
        construction or operation at normal capacity of a project that
        has secured all necessary Federal authorizations and permits,
        unless--
                    (A) the Federal department or agency takes such
                action in response to an order by a court of competent
                jurisdiction;
                    (B) the holder of the Federal authorization or
                permit has materially breached the terms of the Federal
                authorization or permit or otherwise materially
                violated applicable law;
                    (C) the Federal authorization or permit was
                obtained through fraud, intentional concealment, or
                material misrepresentation;
                    (D) such action is necessary to prevent immediate,
                specific, urgent, substantial, and proximate harm or
                damage to life, property, human health, the
                environment, national security, or defense that is
                based on new information that was not considered in the
                underlying environmental review process or final agency
                action for the Federal authorization or permit;
                    (E) the Federal department or agency has received a
                request from the holder of the Federal authorization or
                permit for the covered project or action to take such
                action; or
                    (F) such action is taken pursuant to any applicable
                law or regulation.
            (2) Requirement.--If a Federal department or agency takes
        an action under paragraph (1) in response to a matter described
        in subparagraph (D) of that paragraph, the action shall be
        narrowly tailored in scope, duration, and degree only so much
        as is necessary to remedy the specific issue the action is
        intended to address.
            (3) Notice.--Before a Federal department or agency takes an
        action under paragraph (1), the Federal department or agency
        shall notify the holder of the Federal authorization or permit
        for a covered project or action, in writing, of such action,
        including by--
                    (A) providing a detailed explanation of the action;
                    (B) identifying the statutory authority relied on
                for the action; and
                    (C) providing the evidence supporting the action.
            (4) Judicial review.--
                    (A) Venue.--Unless another provision of law
                provides for direct review in a court of appeals of the
                United States, a holder of a Federal authorization or
                permit for a covered project or action seeking judicial
                review of an action taken by a Federal department or
                agency under paragraph (1) may obtain review of such
                action in--
                            (i) a United States district court in which
                        the project is at least partially located; or
                            (ii) the United States District Court for
                        the District of Columbia.
                    (B) Standard of review.--In reviewing an action
                taken by a Federal department or agency under paragraph
                (1) under subchapter II of chapter 5 and chapter 7 of
                title 5, United States Code (commonly known as the
                ``Administrative Procedure Act''), or any other
                provision of law, the reviewing court shall,
                notwithstanding subchapter II of chapter 5 and chapter
                7 of title 5, United States Code (commonly known as the
                ``Administrative Procedure Act''), or any other
                provision of law, place the burden of proof on the
                Federal department or agency to demonstrate that 1 or
                more of the matters described in subparagraphs (A)
                through (F) of that paragraph applies.
                    (C) Review of classified information.--If any
                portion of the information that is a basis for the
                agency action being reviewed under this paragraph is
                classified or otherwise protected from public
                disclosure under Federal law, the head of the Federal
                department or agency shall submit that portion of the
                information to the applicable court under seal or in
                camera, and the applicable court shall review and refer
                to that portion of the information in accordance with
                applicable procedures governing classified or protected
                information.
                    (D) Relief.--
                            (i) In general.--If, at the conclusion of
                        its review of an action taken by a Federal
                        department or agency under paragraph (1), the
                        court concludes that the Federal department or
                        agency has not met its burden under
                        subparagraph (B), the holder of the Federal
                        authorization or permit for a covered project
                        or action shall be entitled to--
                                    (I) the reinstatement of the
                                Federal authorization or permit and the
                                termination of any action by the
                                Federal department or agency preventing
                                the construction or operation of the
                                covered project or action;
                                    (II) injunctive relief preventing a
                                Federal department or agency from
                                taking any new action that would
                                revoke, rescind, withdraw, terminate,
                                suspend, vacate, remand, reopen,
                                materially amend, or materially alter a
                                previously granted Federal
                                authorization or permit or take any
                                other action to interfere with or
                                prevent the construction or operation
                                at normal capacity of the covered
                                project or action without first
                                obtaining a court order to that effect
                                from--
                                            (aa) the same judge that
                                        heard the original matter,
                                        assuming that judge continues
                                        to sit in the same district; or
                                            (bb) if that judge is no
                                        longer sitting in the same
                                        district, from another judge in
                                        the same district;
                                    (III) reasonable attorney fees and
                                costs of litigation, as the court
                                determines appropriate;
                                    (IV) any costs associated with the
                                applicable delay in the construction or
                                operation of the covered project or
                                action, as the court determines
                                appropriate; and
                                    (V) on a showing that 1 or more
                                Federal agencies interfered with a
                                Federal authorization or permit in bad
                                faith or interfered in bad faith with
                                the construction or operation of a
                                project that has secured all necessary
                                Federal authorizations or permits,
                                costs in an amount not less than 25
                                percent and not more than 50 percent of
                                the total of all development and
                                construction costs incurred by the
                                holder of the Federal authorization or
                                permit for a covered project or action
                                in connection with the project as of
                                the date of the action and not
                                otherwise recovered under subclause
                                (III) or (IV), which amount shall be
                                determined by the court by taking into
                                consideration--
                                            (aa) the degree to which
                                        the Federal interference in the
                                        project occurred due to bad
                                        faith;
                                            (bb) the degree to which
                                        there exists a pattern of
                                        similar Federal interference in
                                        other projects; and
                                            (cc) the actual degree of
                                        economic harm to the project
                                        sponsor or operator.
                            (ii) Savings clause.--Nothing in this
                        subparagraph limits or supersedes any existing
                        equitable authority of a court to grant any
                        available form of temporary or injunctive
                        relief against the Federal department or
                        agency.
                            (iii) Motion for temporary or preliminary
                        relief.--Notwithstanding any other provision of
                        this section, on a motion for temporary or
                        preliminary relief, the reviewing court shall
                        not consider available cost recovery under
                        subclause (III), (IV), or (V) of clause (i) in
                        considering whether harm to the holder of a
                        Federal authorization or permit is irreparable.
                    (E) Special rule.--If, within 2 years prior to the
                date of enactment of this Act, a Federal department or
                agency has issued a stop-work order that would
                interfere with or prevent the construction or operation
                at normal capacity of a project and such order has been
                enjoined or stayed by a court of competent
                jurisdiction, then, if a Federal department or agency
                takes or acquiesces to any action that would revoke,
                rescind, withdraw, terminate, suspend, vacate, remand,
                reopen, materially amend, or materially alter a
                previously granted Federal authorization or permit or
                takes or acquiesces to any other action to interfere
                with or prevent the construction or operation at normal
                capacity of such project, such action shall have no
                force or effect until the Federal department or agency
                has first obtained a court order to that effect from--
                            (i) the same judge that issued the
                        preliminary injunction or stay, assuming that
                        judge continues to sit in the same district; or
                            (ii) if that judge is no longer sitting in
                        the same district, from another judge in the
                        same district who shall also have jurisdiction
                        to hear any subsequent complaint or motion
                        under this section.
                    (F) Source of funds.--
                            (i) In general.--Amounts awarded under
                        subparagraph (D)(i)--
                                    (I) shall be paid from the fund
                                described in section 1304 of title 31,
                                United States Code; and
                                    (II) shall not be subject to the
                                availability of appropriations.
                            (ii) Limitation on payments.--
                                    (I) In general.--No payment shall
                                be issued under clause (i) or from any
                                other source to resolve any dispute
                                related to a Federal authorization or
                                permit, or to Federal interference in
                                the construction or operation of a
                                project, in the absence of a final
                                judgment from a Federal court of
                                competent jurisdiction authorizing the
                                payment.
                                    (II) Final judgment.--For the
                                purposes of subclause (I), a final
                                judgment includes a court-approved
                                settlement or consent decree, subject
                                to the condition that the settlement or
                                consent decree is accompanied by a
                                determination by the court that the
                                settlement or consent decree--
                                            (aa) arises from and
                                        resolves a dispute within the
                                        subject matter jurisdiction of
                                        the court;
                                            (bb) furthers the
                                        objectives of this section,
                                        including that the interfered-
                                        with project be built and
                                        operated; and
                                            (cc) is fair, reasonable,
                                        and consistent with the public
                                        interest.
                    (G) Limitation on jurisdiction.--Notwithstanding
                sections 1346 and 1491 of title 28, United States Code,
                the United States Court of Federal Claims shall not
                have jurisdiction over any claim for, or in respect to,
                this section--
                            (i) during the consideration of a petition
                        for relief under this section; and
                            (ii) in perpetuity if relief is granted
                        under subparagraph (D)(i).
    (c) Savings Clause.--Nothing in this section limits or modifies any
authority under any applicable law, compact, or treaty.

SEC. 1402. ENSURING FAIRNESS FOR SPECIFIC TYPES OF COVERED PROJECTS.

    (a) Sense of Congress.--It is the sense of Congress that--
            (1) all Federal agencies shall treat all applications for
        Federal authorizations or permits fairly and efficiently; and
            (2) this section shall serve as a guarantee that fair and
        efficient decisionmaking shall occur after the date of
        enactment of this Act.
    (b) Definitions.--In this section:
            (1) Covered application.--The term ``covered application''
        means a complete application for 1 or more Federal
        authorizations or permits.
            (2) Federal authorization or permit.--The term ``Federal
        authorization or permit'' means an authorization, permit,
        record of decision, right-of-way, finding of no significant
        impact, verification, extension, construction and operations
        plan, biological opinion, incidental take statement, variance,
        departure, determination, concurrence, or any other similar
        approval or order that is necessary, including any
        determination by a Federal department or agency that additional
        authorizations or permits are not necessary, for the
        construction or operation at normal capacity of a specific type
        of covered project.
            (3) Pattern of disparate treatment.--The term ``pattern of
        disparate treatment'' means, with respect to 1 specific type of
        covered project, an empirically demonstrated statistical
        pattern that--
                    (A) shows a substantial increase, compared against
                the 10 most recent calendar years of empirical data on
                Federal authorization or permit decisions and delays
                for that specific type of covered project, in--
                            (i) the percentage of Federal
                        authorizations or permits for that 1 specific
                        type of covered project that are unreasonably
                        delayed beyond the applicable timeline as
                        described in subsection (d)(1)(A)(ii); or
                            (ii) the percentage of Federal
                        authorizations or permits for that 1 specific
                        type of covered project that are denied;
                    (B) persists--
                            (i) for a Federal authorization or permit
                        for which an environmental impact statement or
                        environmental assessment (as those terms are
                        defined in section 3 of the National
                        Environmental Policy Act of 1969) are not
                        required, over a minimum period of 180 days, at
                        least 180 days of which occurred after the date
                        of enactment of this Act; or
                            (ii) for a Federal authorization or permit
                        for which an environmental impact statement or
                        environmental assessment (as so defined) are
                        required, over a minimum period of 280 days, at
                        least 280 days of which occurred after the date
                        of enactment of this Act; and
                    (C) is the result of an intentional course of
                action undertaken by the Federal Government to create
                such a pattern.
            (4) Specific type of covered project.--The term ``specific
        type of covered project'' means 1 of the following types of
        projects:
                    (A) A project to produce electricity from onshore
                wind.
                    (B) A project to produce electricity from offshore
                wind.
                    (C) A project to produce electricity from solar.
                    (D) An energy storage project.
                    (E) A project to produce electricity from coal.
                    (F) A project to produce electricity from natural
                gas.
                    (G) A project to produce electricity from oil.
                    (H) A project to produce electricity from a nuclear
                fission reactor.
                    (I) A project to produce electricity from
                geothermal.
                    (J) An onshore electricity transmission project.
                    (K) An offshore electricity transmission project.
                    (L) A natural gas pipeline project.
                    (M) An oil pipeline project.
                    (N) A hydrogen pipeline project.
                    (O) A carbon dioxide pipeline project.
                    (P) A natural gas liquids pipeline project.
                    (Q) A project to produce coal.
                    (R) A project to produce onshore natural gas.
                    (S) A project to produce offshore natural gas.
                    (T) A project to produce onshore oil.
                    (U) A project to produce offshore oil.
                    (V) A hardrock mining project to produce minerals,
                with hardrock mining projects that produce the same
                mineral to be considered the same specific type of
                covered project for purposes of this paragraph.
                    (W) A hardrock mineral processing project to
                produce or expand production of hardrock minerals.
                    (X) A project to produce electricity from hydrogen.
                    (Y) A project to produce electricity from biomass.
                    (Z) A project to refine or process petroleum
                products.
                    (AA) A project to produce biomass.
                    (BB) A hydropower project.
                    (CC) A pumped storage hydropower project.
                    (DD) A project to produce electricity from a fusion
                machine.
                    (EE) A project to produce uranium.
                    (FF) A project to enrich, convert, fabricate,
                reprocess, or store source material or special nuclear
                material (as those terms are defined in section 11 of
                the Atomic Energy Act of 1954 (42 U.S.C. 2014)).
                    (GG) A project to export or import liquefied
                natural gas.
                    (HH) A project to liquefy natural gas or to
                regasify liquefied natural gas.
                    (II) A project to export or import crude oil.
                    (JJ) A project to export or import refined
                petroleum products.
                    (KK) A project to export or import coal.
                    (LL) A geologic carbon dioxide sequestration or
                storage project, including an injection well.
                    (MM) An enhanced oil or natural gas recovery
                project, including a project using carbon dioxide,
                water, or other injectants.
                    (NN) Long-duration battery storage.
                    (OO) A project to refine or process crude oil.
                    (PP) A project to refine natural gas or natural gas
                liquids.
                    (QQ) An ammonia pipeline project.
                    (RR) A produced water pipeline project.
                    (SS) A helium pipeline project.
                    (TT) A coal gasification project.
                    (UU) Any other specific type of energy related
                project not described in subparagraphs (A) through (TT)
                that a United States district court of competent
                jurisdiction certifies shares common industrial
                characteristics, taking into account the specificity of
                the covered project types described in subparagraphs
                (A) through (TT).
    (c) Judicial Review.--
            (1) Cause of action.--
                    (A) In general.--The applicant seeking a Federal
                authorization or permit for a specific type of covered
                project may bring an action in a United States district
                court in which the project is at least partially
                located, or the United States District Court for the
                District of Columbia, alleging, subject to subparagraph
                (B), that after the date of enactment of this Act 1 or
                more Federal authorizations or permits for that
                specific type of covered project were--
                            (i) denied in bad faith as part of a
                        pattern of disparate treatment by the Federal
                        Government against the specific type of covered
                        project at issue; or
                            (ii) unreasonably delayed as part of a
                        pattern of disparate treatment by the Federal
                        Government against the specific type of covered
                        project at issue by more than 60 days beyond
                        the applicable deadline described in--
                                    (I) section 107(g)(1)(A) of the
                                National Environmental Policy Act of
                                1969 (42 U.S.C. 4336a(g)(1)(A));
                                    (II) section 107(g)(1)(B) of the
                                National Environmental Policy Act of
                                1969 (42 U.S.C. 4336a(g)(1)(B)); or
                                    (III) section 1403(b).
                    (B) Requirement.--
                            (i) In general.--In a cause of action
                        brought under subparagraph (A), the applicant
                        shall have the burden of proof of showing
                        that--
                                    (I) the relevant application
                                satisfies all applicable Federal law;
                                    (II) the applicable Federal
                                authorizations or permits would not, if
                                granted, be subject to cancellation--
                                            (aa) for a violation of
                                        applicable Federal law; or
                                            (bb) because the Federal
                                        authorization or permit would
                                        have been obtained through
                                        fraud, intentional concealment,
                                        or material misrepresentation;
                                        and
                                    (III) the Federal authorizations or
                                permits were denied in bad faith or
                                unreasonably delayed as part of a
                                pattern of disparate treatment by the
                                Federal Government against the specific
                                type of covered project at issue that
                                occurred after the date of enactment of
                                this Act.
                            (ii) Prima facie evidence.--
                                    (I) Evidence.--The following shall
                                be considered by a court as prima facie
                                evidence of a pattern of disparate
                                treatment under clause (i)(III):
                                            (aa) Empirical evidence.--

                                                    (AA) In general.--
                                                Empirical evidence
                                                demonstrating a pattern
                                                of denial or
                                                unreasonable delay with
                                                respect to the specific
                                                type of covered project
                                                at issue compared to
                                                the previous rate at
                                                which other Federal
                                                authorizations or
                                                permits were delivered
                                                for that same specific
                                                type of covered project
                                                prior to the
                                                commencement of the
                                                alleged pattern of
                                                delayed or denied
                                                Federal authorizations
                                                or permits.

                                                    (BB) Rate of
                                                denial.--In the case of
                                                a substantial increase
                                                in the rate of denied
                                                Federal authorizations
                                                or permits under
                                                subitem (AA), evidence
                                                of bad faith.

                                            (bb) Supporting evidence.--
                                        In support of the empirical
                                        evidence described in item
                                        (aa), an applicant may provide
                                        supporting evidence, including
                                        a pattern of statements made by
                                        executive branch officials,
                                        Federal department and agency
                                        policies, Executive orders, or
                                        other official guidance that
                                        demonstrates a bias in the
                                        permitting regime against the
                                        specific type of covered
                                        project at issue, except as
                                        provided in subclause (II).
                                    (II) Exclusion.--Statements,
                                policies, Executive orders, or other
                                guidance that expresses a preference
                                for, or opposition to, 1 or more
                                specific types of covered projects, but
                                is unrelated to the permitting of such
                                projects, shall not be considered by a
                                court as supporting evidence of a
                                pattern of disparate treatment under
                                subclause (I)(bb).
                            (iii) Rebuttal evidence.--Once an applicant
                        has made a prima facie case of disparate
                        treatment, the Federal Government shall bear
                        the burden of either--
                                    (I) disproving the case by the
                                applicant; or
                                    (II) putting forth evidence of a
                                lawful basis for the pattern of
                                disparate treatment demonstrated by the
                                applicant.
                            (iv) Burden of evidentiary production.--
                                    (I) In general.--In a cause of
                                action brought under this paragraph, if
                                the applicant produces prima facie
                                evidence of a pattern of disparate
                                treatment under clause (i), the Federal
                                Government shall have the burden to
                                provide to the applicant and the court
                                raw statistical data for the calendar
                                year in which the action is brought and
                                the preceding 10 calendar years
                                showing, with respect to the specific
                                type of covered project at issue--
                                            (aa) the number and
                                        percentage of projects that
                                        received all necessary Federal
                                        authorizations or permits;
                                            (bb) the number and
                                        percentage of projects that
                                        were denied 1 or more Federal
                                        authorizations or permits; and
                                            (cc) the number and
                                        percentage of projects for
                                        which 1 or more covered
                                        applications were pending for
                                        more than 60 days beyond the
                                        applicable deadline described
                                        in subsection (c).
                                    (II) Failure to produce.--A failure
                                of the Federal Government to produce
                                the data described in subclause (I)
                                shall result in an adverse inference
                                against the 1 or more Federal agencies
                                named in the cause of action.
                    (C) Record for review.--The court shall hear a
                cause of action brought under this paragraph solely
                on--
                            (i) the evidence produced by the applicant
                        or the Federal Government;
                            (ii) the administrative record before the
                        agency; and
                            (iii) any raw statistical data required to
                        be provided under subparagraph (B)(iv).
            (2) Remedy.--
                    (A) In general.--If the applicant for a specific
                type of covered project successfully proves that the
                applicable Federal authorizations or permits were
                denied in bad faith or unreasonably delayed under
                paragraph (1), the applicant shall be entitled to--
                            (i) injunctive relief, as provided by
                        applicable Federal law;
                            (ii) reasonable attorney fees and costs of
                        litigation, as the court determines
                        appropriate;
                            (iii) economic damages, including any costs
                        associated with the applicable denial or delay,
                        as the court determines appropriate; and
                            (iv) damages in an amount equal to not less
                        than 50 percent and not more than 100 percent
                        of the total reasonably expected cost of
                        construction of the project, which amount shall
                        be determined by the court taking into
                        consideration--
                                    (I) the degree to which the Federal
                                interference in the applicable specific
                                type of covered project occurred due to
                                bad faith;
                                    (II) the degree to which there
                                exists a pattern of similar Federal
                                interference in specific types of
                                covered projects; and
                                    (III) the actual degree of economic
                                harm to the project sponsor or
                                operator.
                    (B) Requirement.--To receive a remedy under
                subparagraph (A), the applicant shall demonstrate the
                technical and financial ability to construct the
                project that is the subject of the litigation, as well
                as any other projects for which the applicant has
                applied for 1 or more Federal authorizations or
                permits.
            (3) Project completion.--An applicant that receives a
        remedy under paragraph (2) shall, after obtaining all necessary
        Federal authorizations or permits and absent a showing of
        impossibility caused in substantial part by Federal Government
        interference--
                    (A) complete the applicable specific type of
                covered project; or
                    (B) repay all remedies received under paragraph
                (2).
            (4) Source of funds.--
                    (A) In general.--Amounts awarded under paragraph
                (2)--
                            (i) shall be paid from the fund described
                        in section 1304 of title 31, United States
                        Code; and
                            (ii) shall not be subject to the
                        availability of appropriations.
                    (B) Limitation on payments.--
                            (i) In general.--No payment shall be issued
                        under subparagraph (A) or from any other source
                        to resolve any dispute related to a Federal
                        authorization or permit for a specific type of
                        covered project in the absence of a final
                        judgment from a Federal court of competent
                        jurisdiction authorizing the payment.
                            (ii) Final judgment.--For the purposes of
                        clause (i), a final judgment includes a court-
                        approved settlement or consent decree, subject
                        to the condition that the settlement or consent
                        decree is accompanied by a determination by the
                        court that the settlement or consent decree--
                                    (I) arises from and resolves a
                                dispute within the subject matter
                                jurisdiction of the court;
                                    (II) furthers the objectives of
                                this section, including the permitting,
                                construction, and operation of the
                                specific type of covered project; and
                                    (III) is fair, reasonable, and
                                consistent with the public interest.
            (5) Prohibition on class actions.--Rule 23 of the Federal
        Rules of Civil Procedure shall not apply to any action brought
        under this section, and no party with a claim under this
        section or any other person may sue as a representative party
        on behalf of any member of a specific type of covered project
        subject to Rule 23 of the Federal Rules of Civil Procedure.
            (6) Limitation on bringing claims.--With respect to a claim
        filed under this section after the date of enactment of this
        Act--
                    (A) no claim related to a Federal authorization or
                permit for which an environmental impact statement or
                environmental assessment (as those terms are defined in
                section 3 of the National Environmental Policy Act of
                1969) is required may be filed until the date that is
                280 days after that date of enactment; and
                    (B) no claim related to a Federal authorization or
                permit for which an environmental impact statement or
                environmental assessment (as so defined) is not
                required may be filed until the date that is 180 days
                after that date of enactment.

SEC. 1403. AVOIDING UNREASONABLE DELAYS IN PERMITTING.

    (a) Definitions.--In this section:
            (1) Covered application.--The term ``covered application''
        means a complete application for 1 or more Federal
        authorizations or permits.
            (2) Federal authorization or permit.--The term ``Federal
        authorization or permit'' means an authorization, permit,
        record of decision, right-of-way, finding of no significant
        impact, verification, extension, construction and operations
        plan, biological opinion, incidental take statement, variance,
        departure, determination, concurrence, or any other similar
        approval or order that is necessary, including any
        determination by a Federal department or agency that additional
        authorizations or permits are not necessary, for the
        construction or operation at normal capacity of a project.
    (b) Timeline for Issuance of Certain Authorizations or Permits Not
Subject to the Preparation of an Environmental Document.--
            (1) In general.--For any Federal authorizations or permits
        that are not agency actions for which an environmental impact
        statement or environmental assessment (as those terms are
        defined in section 3 of the National Environmental Policy Act
        of 1969) is required, all Federal agencies shall render
        decisions on all applicable covered applications not later than
        1 year after the date on which the latest of the covered
        applications was submitted.
            (2) Effect of rehearing provisions.--If applicable Federal
        law provides for a rehearing on a Federal authorization or
        permit, the 1-year period described in paragraph (1) shall
        begin on--
                    (A) the day after the rehearing is complete; or
                    (B) in the event a rehearing is not pursued, the
                day after the deadline to seek a rehearing expires.
    (c) Right To Petition.--An applicant seeking a Federal
authorization or permit for which an environmental impact statement or
environmental assessment (as those terms are defined in section 3 of
the National Environmental Policy Act of 1969) is not required may
obtain judicial review of the compliance by a Federal department or
agency with the deadline established under subsection (b) with respect
to the covered application by filing a complaint in--
            (1) a United States district court in which the applicable
        project is at least partially located; or
            (2) the United States District Court for the District of
        Columbia.
    (d) Exceptions.--The failure of a Federal department or agency to
comply with the deadline established under subsection (b) with respect
to a covered application shall not be considered a failure to comply if
the Federal department or agency proves by clear and convincing
evidence that the failure was caused by--
            (1) a natural disaster, act of God, or act of war that
        reasonably impaired the ability of the Federal department or
        agency to comply with the relevant deadline established under
        subsection (b);
            (2) a national emergency for which the only available
        response is to delay the decision on the Federal authorization
        or permit beyond the applicable deadline;
            (3) the covered application being based on fraud or
        material misrepresentations of fact;
            (4) the applicant withholding information necessary to the
        ability of the Federal department or agency to comply with the
        statutory obligations of the Federal department or agency in
        issuing a decision on the Federal authorization or permit after
        the Federal department or agency has made a reasonable and
        timely request for such information; or
            (5) a lapse in appropriations of more than 14 days
        affecting 1 or more of the relevant Federal agencies with
        decisionmaking authority over the Federal authorization or
        permit.
    (e) Remedy.--If a court of competent jurisdiction finds that a
Federal department or agency has failed to act in accordance with this
section, the court shall--
            (1) provide injunctive relief, as appropriate, to give
        effect to this section; and
            (2) retain jurisdiction to ensure compliance with any such
        injunctive relief provided.
    (f) Expedited Procedures; Time to Decide.--A reviewing court
shall--
            (1) establish an expedited schedule for briefing and
        disposition under this section; and
            (2) issue a decision under this section as expeditiously as
        practicable, but not later than 120 days, after the date on
        which the petition is filed under subsection (b), absent
        extraordinary circumstances.
    (g) Order.--A court awarding injunctive relief under subsection
(e)(1) shall issue an order requiring a decision on the covered
application not later than 60 days after the date on which the order is
issued.

                   TITLE V--NUCLEAR ENERGY LICENSING

SEC. 1501. UPDATING HEARING PROCEDURES.

    (a) Hearings and Judicial Review.--Section 189 a. of the Atomic
Energy Act of 1954 (42 U.S.C. 2239(a)) is amended--
            (1) in paragraph (1)--
                    (A) in subparagraph (A)--
                            (i) by striking ``In any proceeding under
                        this Act'' and inserting ``(i) In any
                        proceeding under this Act''; and
                            (ii) in clause (i) (as so designated), by
                        striking ``The Commission shall hold a
                        hearing'' and all that follows through ``upon a
                        determination by the Commission that the
                        amendment involves no significant hazards
                        consideration.'' and inserting the following:
    ``(ii) The Commission may, in the absence of a request for a
hearing by any person whose interest may be affected, issue a
construction permit, an operating license, a combined construction
permit and operating license, an amendment to a construction permit, an
amendment to an operating license, or an amendment to a combined
construction permit and operating license under section 103, 104 b.,
104 c., or 185 b. for a facility or a testing facility, without a
hearing, but upon thirty days notice and publication once in the
Federal Register of its intent to do so. The Commission may dispense
with such thirty days notice and publication with respect to any
application for an amendment to a construction permit, an amendment to
an operating license, or an amendment to a combined construction permit
and operating license upon a determination by the Commission that the
amendment involves no significant hazards consideration.
    ``(iii) The Commission shall use informal adjudicatory procedures
for any hearing held by the Commission pursuant to this
subparagraph.''; and
                    (B) in subparagraph (B)(iv)--
                            (i) by inserting ``informal'' before
                        ``hearing procedures''; and
                            (ii) by striking ``, whether informal or
                        formal adjudicatory,''; and
            (2) in paragraph (2)(A), in the second sentence, by
        striking ``required hearing'' and inserting ``hearing held by
        the Commission under this section''.
    (b) Construction Permits and Operating Licenses.--Section 185 b. of
the Atomic Energy Act of 1954 (42 U.S.C. 2235(b)) is amended by
striking ``After holding a public hearing under section 189 a.
(1)(A),'' and inserting ``After the thirty days notice and publication
period or holding a hearing, as applicable, under section 189 a.
(1)(A),''.
    (c) Applicability.--The amendments made by this section shall apply
to all applications and proceedings pending before the Nuclear
Regulatory Commission on or after the date of enactment of this
section.

SEC. 1502. LICENSING OF URANIUM ENRICHMENT FACILITIES.

    (a) In General.--Section 193 of the Atomic Energy Act of 1954 (42
U.S.C. 2243) is amended--
            (1) by striking subsections (a) through (c) and inserting
        the following:
    ``(a) At-risk Construction.--
            ``(1) In general.--Construction of a uranium enrichment
        facility prior to the issuance of a license under sections 53
        and 63 for that facility shall be permitted under the same
        terms and conditions applicable to other fuel cycle facilities
        licensed under those sections.
            ``(2) Rule of construction.--Paragraph (1) may not be
        construed to modify the licensing and regulatory authority of
        the Commission to issue a license under sections 53 and 63 for
        a uranium enrichment facility, including the authority to deny
        an application for such a license for the failure of an
        applicant to meet regulatory requirements.''; and
            (2) by redesignating subsections (d) through (f) as
        subsections (b) through (d), respectively.
    (b) Notification of Enrichment Construction.--As part of an
application for a license under sections 53 and 63 of the Atomic Energy
Act of 1954 (42 U.S.C. 2073, 2093) for operation of a uranium
enrichment facility, the Nuclear Regulatory Commission (referred to in
this section as the ``Commission'') shall require that an applicant
submit a certification that, not fewer than 15 days before commencing
construction of the uranium enrichment facility pursuant to subsection
(a) of section 193 of that Act (42 U.S.C. 2243), the applicant will
submit a written notification with respect to commencing construction
to--
            (1) the Governor of the State in which the uranium
        enrichment facility is to be located;
            (2) the chief executive and governing body of each unit of
        local government in which the facility is to be located; and
            (3) the governing body of each Indian Tribe with an offsite
        response organization that would be notified by the applicant
        in the event of an emergency, as described in the emergency
        plan of the applicant pursuant to section 70.22(i)(3)(viii) of
        title 10, Code of Federal Regulations (or a successor
        regulation), if applicable.
    (c) Regulations Required.--Not later than 180 days after the date
of enactment of this Act, the Commission shall issue or revise
regulations to carry out this section and the amendments made by this
section.
    (d) Rule of Construction.--None of the amendments made by this
section shall be construed to affect--
            (1) the applicability of the National Environmental Policy
        Act of 1969 (42 U.S.C. 4321 et seq.) to the issuance of a
        license under section 53 or 63 of the Atomic Energy Act of 1954
        (42 U.S.C. 2073, 2093) for a uranium enrichment facility;
            (2) the right of any person whose interest may be affected
        by a proceeding under the Atomic Energy Act of 1954 (42 U.S.C.
        2011 et seq.) to a hearing under section 189 of that Act (42
        U.S.C. 2239); or
            (3) the authority of the Commission to conduct inspections
        of uranium enrichment facilities.

SEC. 1503. APPLICABILITY OF DEADLINES TO CERTAIN NUCLEAR FACILITIES.

    Section 102 of the Nuclear Energy Innovation and Modernization Act
(42 U.S.C. 2215) is amended--
            (1) by redesignating subsections (e), (f), and (g) as
        subsections (f), (g), and (h), respectively;
            (2) by inserting after subsection (d) the following:
    ``(e) Licensing Deadlines.--
            ``(1) Definition of covered deadline.--In this subsection,
        the term `covered deadline' means--
                    ``(A) with respect to environmental assessments,
                items (bb) and (cc) of paragraph (1)(A)(ii)(I) of
                section 107(g) of the National Environmental Policy Act
                of 1969 (42 U.S.C. 4336a(g));
                    ``(B) with respect to environmental impact
                statements, paragraph (1)(B)(ii)(II) of that section;
                and
                    ``(C) with respect to Federal authorizations and
                permits, section 1403(b) of the Bipartisan American
                Affordability and Jobs Act of 2026.
            ``(2) Applicability.--Notwithstanding any other provision
        of law, the covered deadlines shall not apply with respect to
        certifications, permits, approvals, licenses, license
        amendments, certificates of compliance, or other authorizations
        issued--
                    ``(A) for a production facility or utilization
                facility (as those terms are defined in section 11 of
                the Atomic Energy Act of 1954 (42 U.S.C. 2014));
                    ``(B) pursuant to sections 53, 63, or 81 of the
                Atomic Energy Act of 1954 (42 U.S.C. 2073, 2093, 2111);
                or
                    ``(C) under parts 60 or 61 of title 10, Code of
                Federal Regulations (or successor regulations).''; and
            (3) in subsection (g) (as so redesignated), by striking
        ``subsection (c),'' inserting ``subsection (c) and except with
        respect to subsection (e),''.

SEC. 1504. COMPENSATION AUTHORITY FOR CAREER APPOINTEES.

    (a) In General.--Section 161B of the Atomic Energy Act of 1954 (42
U.S.C. 2201b) is amended--
            (1) by redesignating subsections (d) through (h) as
        subsections (e) through (i), respectively;
            (2) by inserting after subsection (c) the following:
    ``(d) Compensation Authority for Career Appointees.--
            ``(1) In general.--Notwithstanding any other provision of
        law, the Chairman may fix the compensation of a career
        appointee at an annual rate of basic pay that is not greater
        than 110 percent of the maximum annual rate of basic pay for
        Senior Executive Service positions within the Commission
        established under section 5382 of title 5, United States Code.
            ``(2) Applicability.--The authority to fix the compensation
        of a career appointee under paragraph (1) shall apply
        regardless of when the career appointee was appointed.
            ``(3) Effect on certain certification.--The exercise of the
        authority to fix the compensation of a career appointee under
        paragraph (1) may not affect the certification of any
        performance appraisal system of the Commission under section
        5307(d) of title 5, United States Code.
            ``(4) Career appointee defined.--In this subsection, the
        term `career appointee' has the meaning given the term in
        section 3132(a) of title 5, United States Code.'';
            (3) in subsection (g) (as so redesignated), in paragraph
        (2)(C)--
                    (A) in clause (ii)--
                            (i) in each of subclauses (I) and (III), by
                        striking ``subsection (g)(1)'' each place it
                        appears and inserting ``subsection (h)(1)'';
                        and
                            (ii) in each of subclauses (II) and (IV),
                        by striking ``subsection (g)(2)'' each place it
                        appears and inserting ``subsection (h)(2)'';
                    (B) in clause (iv), by striking ``and'' at the end;
                    (C) by redesignating clause (v) as clause (vi); and
                    (D) by inserting after clause (iv) the following:
                            ``(v) the total number of career appointees
                        that have their compensation fixed pursuant to
                        subsection (d); and''; and
            (4) in subsection (i) (as so redesignated)--
                    (A) in each of paragraphs (1) and (3), by striking
                ``subsections (a) and (b)'' each place it appears and
                inserting ``subsections (a), (b), and (d)'';
                    (B) in paragraph (2), by striking ``or both
                subsections'' and inserting ``subsection (d), or any
                combination of those subsections''; and
                    (C) in paragraph (3)--
                            (i) by inserting ``, or a career
                        appointee,'' after ``compensation of an
                        employee or other personnel serving in a
                        covered position''; and
                            (ii) by striking ``subsection (a) or (b)''
                        and inserting ``subsection (a), (b), or (d)''.
    (b) Conforming Amendment Relating to Government Accountability
Office Report.--Section 502(b) of the ADVANCE Act of 2024 (Public Law
118-67; 138 Stat. 1476) is amended by striking ``subsections (a), (b),
and (c)'' each place it appears and inserting ``subsections (a), (b),
(c), and (d)''.

                 TITLE VI--OTHER ENVIRONMENTAL MATTERS

SEC. 1601. WILDFIRE EMISSIONS PREVENTION.

    (a) Air Quality Monitoring Data Influenced by Exceptional Events.--
            (1) In general.--Section 319(b) of the Clean Air Act (42
        U.S.C. 7619(b)) is amended--
                    (A) in paragraph (1)--
                            (i) in subparagraph (B)--
                                    (I) in the matter preceding clause
                                (i), by striking ``In this subsection,
                                the'' and inserting ``The''; and
                                    (II) by redesignating clauses (i)
                                through (iii) as subclauses (I) through
                                (III), respectively, and indenting
                                appropriately;
                            (ii) by redesignating subparagraph (B) as
                        clause (ii) and indenting appropriately;
                            (iii) by striking the paragraph designation
                        and heading and all that follows through
                        ``exceptional event.'' at the end of
                        subparagraph (A)(iv) and inserting the
                        following:
            ``(1) Definitions.--In this subsection:
                    ``(A) Exceptional event.--
                            ``(i) In general.--The term `exceptional
                        event' means an event--
                                    ``(I)(aa) that--
                                            ``(AA) affects air quality;
                                            ``(BB) is not reasonably
                                        controllable or preventable;
                                        and
                                            ``(CC) is an event caused
                                        by human activity that is
                                        unlikely to recur at a
                                        particular location or a
                                        natural event; or
                                    ``(bb) that is a prescribed fire;
                                and
                                    ``(II) that is--
                                            ``(aa) determined by the
                                        Administrator, through the
                                        process established in the
                                        regulations revised under
                                        paragraph (2)(B), to be an
                                        exceptional event; or
                                            ``(bb) deemed to be an
                                        exceptional event pursuant to a
                                        State petition deemed to be
                                        approved pursuant to paragraph
                                        (3)(B)(v).''; and
                            (iv) by adding at the end the following:
                    ``(B) Prescribed fire.--
                            ``(i) In general.--The term `prescribed
                        fire' means a fire deliberately ignited in
                        accordance with applicable law (including
                        regulations) to burn wildland fuels in a
                        natural or modified state under specified
                        environmental conditions that are intended to
                        allow the fire to be confined to a
                        predetermined area and produce the fireline
                        intensity and rate of spread required to attain
                        planned resource management objectives.
                            ``(ii) Inclusion.--The term `prescribed
                        fire' includes cultural burning activities, as
                        determined by an Indian tribe.'';
                    (B) in paragraph (2), by striking subparagraph (B)
                and inserting the following:
                    ``(B) Revision of regulations.--
                            ``(i) Proposed revisions.--Not later than
                        270 days after the date of enactment of the
                        Bipartisan American Affordability and Jobs Act
                        of 2026, the Administrator, after consultation
                        with Federal land managers, State air pollution
                        control agencies, State foresters, State fish
                        and wildlife agencies, and Indian tribes, shall
                        publish in the Federal Register any necessary
                        revisions to existing regulations promulgated
                        under this section--
                                    ``(I) to reduce the burden and cost
                                for States to demonstrate an
                                exceptional event;
                                    ``(II) to clarify the eligibility
                                of prescribed fires as exceptional
                                events pursuant to the definition in
                                paragraph (1)(A); and
                                    ``(III) to establish the procedure
                                for the review of State petitions
                                described in paragraph (3)(B)(iv).
                            ``(ii) Final revisions.--Not later than 180
                        days after the date on which the Administrator
                        publishes proposed revisions to regulations
                        promulgated under this section under clause
                        (i), and after providing an opportunity for
                        interested persons to make oral presentations
                        of views, data, and arguments regarding the
                        proposed revisions, the Administrator shall
                        finalize those revisions to govern air quality
                        monitoring data influenced by exceptional
                        events that are consistent with paragraph
                        (3).'';
                    (C) in paragraph (3)--
                            (i) in subparagraph (A)--
                                    (I) by redesignating clauses (ii)
                                through (v) as clauses (iii) through
                                (vi), respectively;
                                    (II) by inserting after clause (i)
                                the following:
                            ``(ii) the principle that prescribed fire
                        can play an important role in reducing the
                        magnitude and frequency of wildfires;''; and
                                    (III) in clause (iv) (as so
                                redesignated), by striking ``manner, an
                                appropriate'' and inserting ``manner in
                                an appropriate''; and
                            (ii) in subparagraph (B)--
                                    (I) in clause (ii), by inserting
                                ``or, for prescribed fire, be
                                reasonably expected to exist,'' after
                                ``must exist'';
                                    (II) in clause (iii), by striking
                                ``and'' at the end;
                                    (III) in clause (iv)--
                                            (aa) by striking ``with
                                        respect to exceedances'' and
                                        inserting the following: ``with
                                        respect to--
                                    ``(I) exceedances'';
                                            (bb) in subclause (I) (as
                                        so designated), by striking the
                                        period at the end and inserting
                                        ``; and''; and
                                            (cc) by adding at the end
                                        the following:
                                    ``(II) the designation,
                                redesignation, classification, or
                                reclassification of an area, the
                                determination of attainment of a
                                national ambient air quality standard,
                                or other determinations by the
                                Administrator for determining
                                compliance with this Act; and''; and
                                    (IV) by adding at the end the
                                following:
                            ``(v)(I) a State petition described in
                        clause (iv) be approved, disapproved, or
                        approved-in-part and disapproved-in-part by the
                        Administrator by the date that is 1 year after
                        the date on which the petition is submitted;
                        and
                            ``(II) if the Administrator does not act on
                        a State petition described in clause (iv) by
                        that date, the State petition be deemed
                        approved unless the Administrator, through the
                        process established in the regulations revised
                        under paragraph (2)(B), subsequently determines
                        that the event is not an exceptional event.'';
                        and
                    (D) by striking paragraph (4) and inserting the
                following:
            ``(4) Regional, national, or international exceptional
        events.--At the request of multiple State or local government
        agencies or Tribal authorities, the Administrator shall conduct
        analyses or otherwise collaborate with such agencies or
        authorities to lead the development of regional, national, or
        international exceptional event demonstrations when exceptional
        events impact multijurisdictional areas.''.
            (2) Savings provision.--Nothing in this subsection or an
        amendment made by this subsection makes stationary source (as
        defined in section 51.491 of title 40, Code of Federal
        Regulations (as in effect on the date of enactment of this
        Act)) emissions that did not qualify as an exceptional event
        (as defined in section 319(b)(1) of the Clean Air Act (42
        U.S.C. 7619(b)(1))) on the day before the date of enactment of
        this Act an exceptional event under that section after that
        date of enactment.
    (b) Smoke Ready Communities Program.--
            (1) Establishment.--Subject to the availability of
        appropriations, the Administrator of the Environmental
        Protection Agency (referred to in this subsection as the
        ``Administrator'') may make competitive grants under section
        103(b)(3) of the Clean Air Act (42 U.S.C. 7403(b)(3)) to
        eligible entities for the assessment, prevention, control, or
        abatement of wildfire smoke hazards in community buildings,
        including school buildings (as defined in section 11 of the
        Asbestos School Hazard Detection and Control Act of 1980 (20
        U.S.C. 3610)), and related activities.
            (2) Eligible entities.--The entities eligible for a grant
        under paragraph (1) are--
                    (A) States;
                    (B) federally recognized Indian Tribes; and
                    (C) any entities eligible for grants under section
                103(b)(3) of the Clean Air Act (42 U.S.C. 7403(b)(3)).
            (3) Cost share.--
                    (A) In general.--Subject to subparagraph (B), the
                Federal share of the cost of an activity carried out
                using a grant under paragraph (1) shall be not more
                than 90 percent.
                    (B) Waiver.--The Administrator may waive the cost-
                share requirement under subparagraph (A) if the
                facility that is the subject of the activity for which
                the grant is provided is in an economically distressed
                community.
            (4) Limitation.--Of the amounts made available each fiscal
        year for grants under this section, not more than 25 percent
        may be awarded to recipients in any 1 State.

SEC. 1602. BROWNFIELDS REVITALIZATION.

    (a) Brownfields Revitalization Funding.--
            (1) Definition of eligible entity.--Section 104(k)(1)(I) of
        the Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)(1)(I)) is amended by
        inserting ``or 501(c)(6)'' after ``section 501(c)(3)''.
            (2) Grants and loans for brownfield remediation.--Section
        104(k)(3)(A)(ii) of the Comprehensive Environmental Response,
        Compensation, and Liability Act of 1980 (42 U.S.C.
        9604(k)(3)(A)(ii)) is amended by striking ``$500,000'' and all
        that follows through the period at the end and inserting
        ``$1,000,000 for each site to be remediated.''.
            (3) Multipurpose brownfields grants.--Section
        104(k)(4)(B)(i) of the Comprehensive Environmental Response,
        Compensation, and Liability Act of 1980 (42 U.S.C.
        9604(k)(4)(B)(i)) is amended by striking ``$1,000,000'' and
        inserting ``$2,000,000''.
            (4) General provisions.--Section 104(k)(5) of the
        Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)(5)) is amended--
                    (A) in subparagraph (A), by striking clause (i) and
                inserting the following:
                            ``(i) Brownfield site characterization and
                        assessment.--A grant under paragraph (2) may be
                        awarded to an eligible entity on a community-
                        wide or site-by-site basis, and shall not
                        exceed, for any individual brownfield site
                        covered by the grant, $500,000.''; and
                    (B) by adding at the end the following:
                    ``(F) Demolition.--A recipient of a grant or loan
                under paragraph (2), (3), or (4) may use up to 10
                percent of the amounts made available under the grant
                or loan for demolition activities as needed to carry
                out the purpose for which the grant or loan was
                provided, subject to the approval of the
                Administrator.''.
            (5) Ranking criteria.--Section 104(k)(6)(C) of the
        Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)(6)(C)) is amended by
        adding at the end the following:
                            ``(xiii) The extent to which a grant would
                        facilitate the redevelopment and reuse of a
                        brownfield site located in whole or in part on
                        a former military installation.
                            ``(xiv) The extent to which a grant could
                        facilitate the remediation and reuse of a
                        brownfield site for any activity described in
                        the matter preceding clause (i) of section
                        41001(6)(A) of the FAST Act (42 U.S.C.
                        4370m(6)(A)) (regardless of whether the
                        activity is described in any of clauses (i)
                        through (iv) of that section).''.
            (6) Implementation of brownfields programs.--Section
        104(k)(7) of the Comprehensive Environmental Response,
        Compensation, and Liability Act of 1980 (42 U.S.C. 9604(k)(7))
        is amended--
                    (A) in subparagraph (A)--
                            (i) by striking ``The Administrator may
                        provide'' and inserting the following: ``The
                        Administrator--
                            ``(i) may provide'';
                            (ii) in clause (i) (as so designated), by
                        striking the period at the end and inserting
                        ``; and''; and
                            (iii) by adding at the end the following:
                            ``(ii) shall provide, on a noncompetitive
                        basis, 1 grant to a covered entity in each of
                        fiscal years 2028 and 2029, which grant shall
                        be used to provide technical assistance to 5
                        covered applicants, selected by the
                        Administrator, for purposes of applying for a
                        grant under this subsection for activities to
                        be carried out in a small community.''; and
                    (B) by adding at the end the following:
                    ``(C) Definitions.--In this paragraph:
                            ``(i) Covered applicant.--The term `covered
                        applicant' means an eligible entity--
                                    ``(I) that applied for, but did not
                                receive, a grant under this subsection
                                in the fiscal year immediately
                                preceding the fiscal year for which the
                                Administrator is selecting covered
                                applicants under subparagraph (A)(ii)
                                for activities to be carried out in a
                                small community; and
                                    ``(II) for which the provision of
                                technical assistance under this
                                paragraph would help secure a grant
                                under this subsection.
                            ``(ii) Covered entity.--The term `covered
                        entity' means an eligible entity or nonprofit
                        organization with relevant experience and
                        expertise in applying for and securing Federal
                        assistance that is receiving funding under
                        subparagraph (A)(i).
                            ``(iii) Small community.--The term `small
                        community' has the meaning given the term in
                        section 128(a)(1)(B)(iv).''.
            (7) Audits.--Section 104(k)(8) of the Comprehensive
        Environmental Response, Compensation, and Liability Act of 1980
        (42 U.S.C. 9604(k)(8)) is amended--
                    (A) by striking subparagraph (A) and inserting the
                following:
                    ``(A) In general.--Not later than 2 years after the
                date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, and every 2 years
                thereafter, the Inspector General of the Environmental
                Protection Agency shall conduct reviews or audits of
                the use of--
                            ``(i) Federal funds by the Administrator
                        under this subsection;
                            ``(ii) grants and loans made under this
                        subsection; and
                            ``(iii) grants made to a State or Indian
                        tribe under section 128(a) and activities
                        carried out using such grants, including grants
                        made to a State or Indian tribe using amounts
                        made available under paragraph (7) to carry out
                        section 128(a)(1)(B)(ii)(III).''; and
                    (B) in subparagraph (D), by striking ``September
                30, 2022'' and inserting ``2 years after the date of
                enactment of the Bipartisan American Affordability and
                Jobs Act of 2026, and every 2 years thereafter''.
            (8) Agreements.--Section 104(k)(10)(B)(iii) of the
        Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)(10)(B)(iii)) is
        amended--
                    (A) by inserting ``the eligible entity is located
                in a small community or disadvantaged area (as those
                terms are defined in section 128(a)(1)(B)(iv)) or''
                after ``unless''; and
                    (B) by inserting ``, in which case the
                Administrator shall waive the matching share
                requirement under this clause'' before ``; and''.
            (9) Authorization of appropriations.--Section 104(k) of the
        Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)) is amended by
        striking paragraph (13) and inserting the following:
            ``(13) Authorization of appropriations.--
                    ``(A) In general.--There is authorized to be
                appropriated to carry out this subsection $200,000,000
                for each of fiscal years 2027 through 2031.
                    ``(B) Funding for oversight.--Of the amounts made
                available under this paragraph for each fiscal year,
                0.5 percent shall be available to carry out paragraph
                (8).''.
    (b) Reauthorization of Funding for Certain Assistance to States.--
Section 128(a) of the Comprehensive Environmental Response,
Compensation, and Liability Act of 1980 (42 U.S.C. 9628(a)) is
amended--
            (1) in paragraph (1), by adding at the end the following:
                    ``(C) Brownfields inventory.--Each State or Indian
                tribe receiving a grant under this subsection shall
                maintain, update not less than annually, and make
                available to the public, by location, an inventory of
                all brownfield sites within that State on which
                activities authorized and funded pursuant to that grant
                have occurred.''; and
            (2) in paragraph (3), by striking ``subsection $50,000,000
        for each of fiscal years 2019 through 2023.'' and inserting the
        following: ``subsection--
                    ``(A) $60,000,000 for fiscal year 2027;
                    ``(B) $65,000,000 for fiscal year 2028;
                    ``(C) $70,000,000 for fiscal year 2029;
                    ``(D) $75,000,000 for fiscal year 2030; and
                    ``(E) $80,000,000 for fiscal year 2031.''.
    (c) Studies, Reports, and Guidance.--
            (1) Capitalization of revolving loan funds study.--Not
        later than September 30, 2028, the Comptroller General of the
        United States shall submit to Congress a report containing a
        review of revolving loan funds that were capitalized using a
        grant received under subparagraph (A)(i) of section 104(k)(3)
        of the Comprehensive Environmental Response, Compensation, and
        Liability Act of 1980 (42 U.S.C. 9604(k)(3)) during any of
        fiscal years 2015 through 2025, including information on--
                    (A) the status and balance of each such revolving
                loan fund;
                    (B) each loan or grant provided by an eligible
                entity under subparagraph (B) of that section; and
                    (C) any barriers to the eligible entity providing
                additional loans or grants under that subparagraph.
            (2) Report on funding for covered entities and covered
        applicants.--
                    (A) In general.--Not later than September 30, 2030,
                the Administrator shall submit to Congress a report
                on--
                            (i) the effect of providing a grant under
                        clause (ii) of section 104(k)(7)(A) of the
                        Comprehensive Environmental Response,
                        Compensation, and Liability Act of 1980 (42
                        U.S.C. 9604(k)(7)(A)) (as amended by subsection
                        (a)(6));
                            (ii) the covered applicants selected by the
                        Administrator under that clause; and
                            (iii) the status of--
                                    (I) any applications for a grant
                                under section 104(k) of that Act (42
                                U.S.C. 9604(k)) submitted by a covered
                                applicant that received technical
                                assistance pursuant to that clause; and
                                    (II) any activities for which a
                                grant was provided pursuant to such an
                                application.
                    (B) Updated report.--Not later than September 30,
                2032, the Administrator shall submit to Congress an
                update to the report submitted under subparagraph (A).
            (3) Report on loan programs for assessment, remediation,
        and reuse of brownfield sites.--
                    (A) In general.--Not later than 2 years after the
                date of enactment of this Act, the Administrator shall
                submit to the Committee on Energy and Commerce of the
                House of Representatives and the Committee on
                Environment and Public Works of the Senate a report
                containing--
                            (i) an analysis of whether establishing and
                        implementing a loan program for the assessment,
                        remediation, and reuse of brownfield sites,
                        consistent with section 104(k) of the
                        Comprehensive Environmental Response,
                        Compensation, and Liability Act of 1980 (42
                        U.S.C. 9604(k)), would be feasible and useful,
                        including consideration of--
                                    (I) the demand for larger loans for
                                which the amount of the loan is equal
                                to or greater than the largest loan
                                currently offered by eligible entities
                                under paragraph (3)(B) of that section;
                                    (II) the extent to which such a
                                program would facilitate the
                                remediation and reuse of brownfield
                                sites at which potential contamination
                                is particularly extensive or complex;
                                and
                                    (III) the extent to which such a
                                program could facilitate the
                                remediation and reuse of 1 or more
                                brownfield sites at an earlier date
                                than such activities would otherwise
                                proceed; and
                            (ii) if the Administrator finds such a
                        program will be feasible and useful,
                        recommendations for statutory changes needed to
                        authorize such a program.
                    (B) Consultation.--In carrying out this paragraph,
                the Administrator shall consult with other Federal
                agencies, eligible entities, site owners, site
                developers, and any other entities the Administrator
                considers appropriate.
            (4) National priorities list deletion study.--The
        Comptroller General of the United States shall conduct a study
        with respect to the process for the deletion or partial
        deletion of sites from the National Priorities List established
        under section 105 of the Comprehensive Environmental Response,
        Compensation, and Liability Act of 1980 (42 U.S.C. 9605) in
        order to identify any barriers to such deletion or partial
        deletion, including a review of the following:
                    (A) The process of coordination between Federal and
                State entities with respect to that deletion or partial
                deletion.
                    (B) Any impediments to timely and efficient
                deletion or partial deletion of sites.
                    (C) Opportunities to expedite the deletion or
                partial deletion of sites with respect to which
                applicable remedial action has been completed.
            (5) Guidance for permitting on brownfield sites.--
                    (A) In general.--Not later than 1 year after the
                date of enactment of this Act, the Administrator shall
                develop guidance to assist Federal agencies in more
                efficiently issuing Federal authorizations, and
                conducting environmental reviews for such
                authorizations, with respect to projects relating to
                brownfield sites.
                    (B) Considerations.--In developing or updating
                guidance under this paragraph, the Administrator shall
                consider matters related to--
                            (i) the availability of historic site-
                        specific environmental data;
                            (ii) previously completed environmental
                        reviews required by the National Environmental
                        Policy Act of 1969 (42 U.S.C. 4321 et seq.);
                            (iii) data or information collected as part
                        of assessment or remediation activities under
                        section 104(k) of the Comprehensive
                        Environmental Response, Compensation, and
                        Liability Act of 1980 (42 U.S.C. 9604(k));
                            (iv) community engagement and historical
                        experience with previous uses; and
                            (v) any other matters the Administrator
                        determines appropriate.
                    (C) Updates.--The Administrator shall update the
                guidance developed under this paragraph periodically.
            (6) Definitions.--In this subsection:
                    (A) Administrator.--The term ``Administrator''
                means the Administrator of the Environmental Protection
                Agency.
                    (B) Brownfield site.--The term ``brownfield site''
                has the meaning given the term in section 101 of the
                Comprehensive Environmental Response, Compensation, and
                Liability Act of 1980 (42 U.S.C. 9601).
                    (C) Federal authorization.--The term ``Federal
                authorization'', with respect to a project--
                            (i) means any authorization required under
                        Federal law for the project; and
                            (ii) includes any permits, special use
                        authorizations, certifications, opinions, or
                        other approvals as may be required under
                        Federal law for such project.
                    (D) Remedial action.--The term ``remedial action''
                has the meaning given the term in section 101 of the
                Comprehensive Environmental Response, Compensation, and
                Liability Act of 1980 (42 U.S.C. 9601).

         DIVISION B--COMMITTEE ON ENERGY AND NATURAL RESOURCES

                     TITLE I--ELECTRIC TRANSMISSION

SEC. 2101. TRANSMISSION PERMITTING.

    (a) Definitions.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (a) and inserting the
following:
    ``(a) Definitions.--In this section:
            ``(1) Affected landowner.--The term `affected landowner'
        includes each owner of a property interest in affected
        property, including--
                    ``(A) the Federal Government;
                    ``(B) a State, local, or Tribal government; and
                    ``(C) each owner noted in the most recent county or
                city tax record as receiving the relevant tax notice
                with respect to that interest.
            ``(2) Affected property.--The term `affected property'
        means any land or other property--
                    ``(A) that is or will be crossed by the energy
                transmission facility proposed to be constructed or
                modified under the applicable permit under subsection
                (b);
                    ``(B) that is or will be used as a facility site
                with respect to the energy transmission facility
                proposed to be constructed or modified under the
                applicable permit under subsection (b);
                    ``(C) that abuts any boundary of an existing right-
                of-way or other facility site that--
                            ``(i) is owned by an electric utility; and
                            ``(ii) is located not more than 500 feet
                        from the energy transmission facility to be
                        constructed or modified under the applicable
                        permit under subsection (b);
                    ``(D) that abuts the boundary of a proposed
                facility site for the energy transmission facility to
                be constructed or modified under the applicable permit
                under subsection (b);
                    ``(E) that is crossed by, or abuts any boundary of,
                an existing or proposed right-of-way that--
                            ``(i) will be used for the energy
                        transmission facility to be constructed or
                        modified under the applicable permit under
                        subsection (b); and
                            ``(ii) is located not more than 500 feet
                        from the proposed location of that energy
                        transmission facility; or
                    ``(F) on which a residence is located not more than
                500 feet from the boundary of any right-of-way for that
                energy transmission facility.
            ``(3) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(4) Improved reliability.--The term `improved
        reliability' has the meaning given the term in section 225(a).
            ``(5) Landowner input.--The term `landowner input' means
        input received--
                    ``(A) by the Commission;
                    ``(B) from affected landowners, such as farmers and
                ranchers, in the path of the proposed construction or
                modification of an electric transmission facility; and
                    ``(C) pursuant to notification provided to, and
                consultation with, those affected landowners, farmers,
                and ranchers by the Commission.
            ``(6) Secretary.--The term `Secretary' means the Secretary
        of Energy.''.
    (b) Construction Permit.--Section 216(b) of the Federal Power Act
(16 U.S.C. 824p(b)) is amended--
            (1) in the matter preceding paragraph (1), by striking
        ``Except'' and all that follows through ``finds that'' and
        inserting ``Except as provided in subsections (d)(1) and (i),
        the Commission shall, after notice and an opportunity for
        hearing, including a public comment period of at least 45 days,
        issue one or more permits to individual or joint applicants for
        the construction or modification of electric transmission
        facilities necessary in the national interest if the Commission
        finds that'';
            (2) in paragraph (1)--
                    (A) in subparagraph (A)(i), by inserting ``or
                modification'' after ``siting''; and
                    (B) in subparagraph (C)--
                            (i) in the matter preceding clause (i), by
                        inserting ``or modification'' after ``siting'';
                        and
                            (ii) in clause (i), by striking ``the later
                        of'' in the matter preceding subclause (I) and
                        all that follows through the semicolon at the
                        end of subclause (II) and inserting ``the date
                        on which the application was filed with the
                        State commission or other entity;''; and
            (3) by striking paragraphs (2) through (6) and inserting
        the following:
            ``(2) the proposed facilities will be used for the
        transmission of electric energy in interstate or foreign
        commerce;
            ``(3) the proposed construction or modification is
        consistent with the public interest;
            ``(4) the proposed construction or modification will
        protect or benefit consumers, provide improved reliability, and
        facilitate just and reasonable rates;
            ``(5) the electric transmission facilities--
                    ``(A) are--
                            ``(i) capable of transmitting electric
                        energy at a voltage of not less than 230
                        kilovolts; or
                            ``(ii) necessary to safely and reliably
                        interconnect 1 or more facilities described in
                        clause (i) for which the permit is provided; or
                    ``(B) in the case of facilities that include
                advanced transmission conductors (including
                superconductors), as defined by the Commission, are
                capable of transmitting electric energy at voltages
                determined to be appropriate by the Commission for
                facilities of a comparable throughput specifically with
                respect to an application for an individual project
                under this section; and
            ``(6) if applicable, the proposed modification (including
        reconductoring) will maximize, to the extent reasonable and
        economical, the transmission capabilities of existing towers,
        structures, or rights-of-way.''.
    (c) State Siting and Consultation.--Section 216 of the Federal
Power Act (16 U.S.C. 824p) is amended by striking subsection (d) and
inserting the following:
    ``(d) State Siting and Consultation.--
            ``(1) Preservation of state siting authority.--The
        Commission shall have no authority to issue a permit under
        subsection (b) for the construction or modification of an
        electric transmission facility within a State except as
        provided in paragraph (1) of that subsection.
            ``(2) Consultation.--In any proceeding before the
        Commission under subsection (b), the Commission shall afford
        each State in which a transmission facility covered by the
        permit is or will be located, each affected Federal agency and
        Indian Tribe, private property owners, and other interested
        persons, a reasonable opportunity to present their views and
        recommendations with respect to the need for and impact of a
        facility covered by the permit.
            ``(3) Landowner input.--In authorizing the construction or
        modification of an electric transmission facility under
        subsection (b), the Commission shall take into account
        landowner input.
            ``(4) State record.--In any proceeding before the
        Commission under subsection (b), each State in which a
        transmission facility covered by the permit is or will be
        located may file with the Commission, and the Commission shall
        consider, any part of the State record, if applicable, that the
        State finds to be relevant to the determination of the
        Commission.
            ``(5) Pre-filing processes.--Any Commission-related pre-
        filing processes relating to an application submitted under
        subsection (c) may commence before, but shall commence no later
        than, an application is submitted to the applicable State
        commission or other entity that has authority to approve the
        siting of the applicable facility.''.
    (d) Rights-of-Way.--Section 216(e) of the Federal Power Act (16
U.S.C. 824p(e)) is amended by striking ``or a State'' in paragraph (1)
and by striking ``shall conform as nearly as practicable to the
practice and procedure in a similar action or proceeding in the courts
of the State in which the property is located'' in paragraph (3) and
inserting ``shall be in accordance with rule 71.1 of the Federal Rules
of Civil Procedure.''.
    (e) Cost Allocation.--
            (1) In general.--Section 216 of the Federal Power Act (16
        U.S.C. 824p) is amended by striking subsection (f) and
        inserting the following:
    ``(f) Cost Allocation.--
            ``(1) Transmission tariffs.--For the purposes of this
        section and except as provided in paragraph (2), any
        transmitting utility that owns, controls, or operates, or
        proposes to construct, electric transmission facilities with
        respect to which the Commission finds that the criteria set
        forth in paragraphs (2) through (5) and, if applicable, (6) of
        subsection (b) are satisfied, and any entity that will become a
        transmitting utility on completion of 1 or more proposed
        electric transmission facilities with respect to which the
        Commission finds that those criteria are satisfied, shall file
        a tariff or tariff revision with the Commission pursuant to
        section 205 and the regulations of the Commission allocating
        the costs of those new or modified electric transmission
        facilities. The issuance of a permit under subsection (b) shall
        not be required to make, or otherwise act as a prerequisite to
        making, that filing pursuant to section 205, provided that the
        Commission finds that the criteria set forth in paragraphs (2)
        through (5) and, if applicable, (6) of subsection (b) are
        satisfied with respect to the applicable facilities.
            ``(2) Exception.--In the case of an exempt transmitting
        utility (as defined in section 225(a)) that owns, controls, or
        operates electric transmission facilities described in
        paragraph (1), the Commission, notwithstanding section 211A(c),
        shall require the exempt transmitting utility to provide
        transmission services over such facilities pursuant to section
        211A and the regulations of the Commission allocating the costs
        of the new or modified transmission facilities.
            ``(3) Transmission benefits.--The Commission shall require
        that tariffs or tariff revisions filed under this section are
        just and reasonable and allocate the costs of providing service
        to customers that benefit, in accordance with the cost-
        causation principle and at least roughly commensurate with the
        benefits, including through--
                    ``(A) improved reliability;
                    ``(B) reduced congestion;
                    ``(C) reduced power losses;
                    ``(D) greater carrying capacity that delivers
                improved reliability or reductions in the cost of
                delivered power;
                    ``(E) reduced operating reserve requirements; and
                    ``(F) improved access to generation that achieves
                reductions in the cost of delivered power.
            ``(4) Ratepayer protection.--Customers that receive no
        benefit, or benefits that are trivial in relation to the costs
        sought to be allocated, from existing or proposed electric
        transmission facilities the costs of which are allocated
        pursuant to paragraph (1) shall not be involuntarily allocated
        any of the costs of those transmission facilities, provided,
        however, that nothing in this section shall prevent a
        transmitting utility from recovering all or part of such costs
        through voluntary agreement with its customers and allocating
        any remaining costs in accordance with this subsection.''.
            (2) Savings provision.--If the Federal Energy Regulatory
        Commission finds that the considerations under paragraphs (2)
        through (5) and, if applicable, (6) of subsection (b) of
        section 216 of the Federal Power Act (16 U.S.C. 824p) (as
        amended by subsection (b)) are satisfied, nothing in this
        section or the amendments made by this section shall be
        construed to exclude transmission facilities located on the
        outer Continental Shelf from being eligible for cost allocation
        established under subsection (f)(1) of that section (as amended
        by paragraph (1)).
    (f) Coordination of Federal Authorizations for Transmission
Facilities.--Section 216(h) of the Federal Power Act (16 U.S.C.
824p(h)) is amended--
            (1) in paragraph (1), by adding at the end the following:
            ``(C) The term `Federal authorization' includes a
        certification under section 401 of the Federal Water Pollution
        Control Act (33 U.S.C. 1341) from a certifying authority (as
        defined in subsection (h) of that section) and any other
        permit, license, concurrence, or approval of a State
        administrative agency required under Federal law, other than
        the Coastal Zone Management Act of 1972 (16 U.S.C. 1451 et
        seq.), in order to site a transmission facility.'';
            (2) in paragraph (2), by striking the period at the end and
        inserting the following: ``, except that--
            ``(A) the Commission shall act as the lead agency in the
        case of facilities permitted under subsection (b) or section
        225; and
            ``(B) the Department of the Interior shall act as the lead
        agency in the case of facilities located on a lease, easement,
        or right-of-way granted by the Secretary of the Interior under
        section 8(p)(1)(C) of the Outer Continental Shelf Lands Act (43
        U.S.C. 1337(p)(1)(C)).'';
            (3) in each of paragraphs (3), (4)(B), (4)(C), (5)(B),
        (6)(A), (7)(A), (7)(B)(i), (8)(A)(i), and (9), by striking
        ``Secretary'' each place it appears and inserting ``lead
        agency'';
            (4) in paragraph (4)(A), by striking ``As head of the lead
        agency, the Secretary'' and inserting ``The lead agency'';
            (5) in paragraph (5)(A), by striking ``As lead agency head,
        the Secretary'' and inserting ``The lead agency'';
            (6) in paragraph (7)--
                    (A) in subparagraph (A), by striking ``18 months
                after the date of enactment of this section'' and
                inserting ``18 months after the date of enactment of
                the Bipartisan American Affordability and Jobs Act of
                2026''; and
                    (B) in subparagraph (B)(i), by striking ``1 year
                after the date of enactment of this section'' and
                inserting ``18 months after the date of enactment of
                the Bipartisan American Affordability and Jobs Act of
                2026''; and
            (7) by adding at the end the following:
    ``(10) Any order or action of a Federal agency or State
administrative agency acting pursuant to Federal law to issue,
condition, or deny a Federal authorization shall be subject to judicial
review in the same courts in which an order of the Commission is
subject to judicial review under section 313, and a court shall have
jurisdiction over the action in accordance with the third sentence of
subsection (b) of that section, the courts described in that section
having original and exclusive jurisdiction over such actions.''.
    (g) Interstate Compacts.--Section 216(i) of the Federal Power Act
(16 U.S.C. 824p(i)) is amended--
            (1) in paragraph (3), by striking ``, including facilities
        in national interest electric transmission corridors''; and
            (2) in paragraph (4)--
                    (A) in subparagraph (A), by striking ``; and'' and
                inserting a period;
                    (B) by striking subparagraph (B); and
                    (C) by striking ``in disagreement'' in the matter
                preceding subparagraph (A) and all that follows through
                ``(A) the'' in subparagraph (A) and inserting ``unable
                to reach an agreement on an application seeking
                approval by the''.
    (h) Transmission Infrastructure Investment.--Section 219(b)(4) of
the Federal Power Act (16 U.S.C. 824s(b)(4)) is amended--
            (1) in subparagraph (A), by striking ``and'' after the
        semicolon at the end;
            (2) in subparagraph (B), by striking the period at the end
        and inserting ``; and''; and
            (3) by adding at the end the following:
                    ``(C) all prudently incurred costs associated with
                payments to jurisdictions impacted by electric
                transmission facilities developed pursuant to section
                216 or 225.''.
    (i) Jurisdiction.--Section 216 of the Federal Power Act (16 U.S.C.
824p) is amended by striking subsection (k) and inserting the
following:
    ``(k) Jurisdiction.--
            ``(1) ERCOT.--This section shall not apply within the area
        referred to in section 212(k)(2)(A).
            ``(2) Other utilities.--
                    ``(A) In general.--For the purposes of this
                section, the Commission shall have jurisdiction over
                all transmitting utilities, including transmitting
                utilities described in section 201(f), but excluding
                any ERCOT utility (as defined in section 212(k)(2)(B))
                and any exempt transmitting utility (as defined in
                section 225(a)) that does not voluntarily subject
                itself to Commission jurisdiction for the purposes of
                this section.
                    ``(B) Clarification.--Being subject to Commission
                jurisdiction for the purposes of this section shall not
                make an entity described in section 201(f) a public
                utility for the purposes of section 201(e).''.
    (j) Conforming Amendments.--
            (1) Section 50151(b) of Public Law 117-169 (42 U.S.C.
        18715(b)) is amended by striking ``facilities designated by the
        Secretary to be necessary in the national interest under
        section 216(a) of the Federal Power Act (16 U.S.C. 824p(a))''
        and inserting ``facilities in a geographic area identified
        under section 224 of the Federal Power Act''.
            (2) Section 1222 of the Energy Policy Act of 2005 (42
        U.S.C. 16421) is amended--
                    (A) in subsection (a)(1)(A), by striking ``in a
                national interest electric transmission corridor
                designated under section 216(a)'' and inserting ``in a
                geographic area identified under section 224''; and
                    (B) in subsection (b)(1)(A), by striking ``in an
                area designated under section 216(a)'' and inserting
                ``in a geographic area identified under section 224''.
            (3) Section 40106(h)(1)(A) of the Infrastructure Investment
        and Jobs Act (42 U.S.C. 18713(h)(1)(A)) is amended by striking
        ``in an area designated as a national interest electric
        transmission corridor pursuant to section 216(a) of the Federal
        Power Act 16 U.S.C. 824p(a)'' and inserting ``in a geographic
        area identified under section 224 of the Federal Power Act''.

SEC. 2102. RECONDUCTORING AND OTHER ACTIVITIES IN EXISTING RIGHTS-OF-
              WAY.

    (a) Categorical Exclusion for Reconductoring.--The Federal Power
Act is amended by inserting after section 216 (16 U.S.C. 824p) the
following:

``SEC. 216A. GRID CAPACITY EXPANSION IN EXISTING RIGHTS-OF-WAY.

    ``(a) Definitions.--In this section:
            ``(1) Applicable electrical standard.--The term `applicable
        electrical standard' includes--
                    ``(A) a reliability standard (as defined in section
                215(a)); and
                    ``(B) an applicable clause of the National
                Electrical Safety Code published by the Institute of
                Electrical and Electronics Engineers Standards
                Association.
            ``(2) Covered area.--The term `covered area' means an
        area--
                    ``(A) within an existing right-of-way; or
                    ``(B) within the minimum additional area adjacent
                to an existing right-of-way, provided that the total
                additional area is not more than \1/4\ mile from the
                boundary of the right-of-way, that is necessary--
                            ``(i) to comply with applicable electrical
                        standards; or
                            ``(ii) to complete an activity described in
                        subsection (b).
            ``(3) Covered facility.--The term `covered facility' means
        an existing electric transmission or distribution facility or
        associated infrastructure (including an electrical substation)
        that is located within a covered area.
    ``(b) Exemptions.--
            ``(1) In general.--Activities to maintain or increase the
        transmission capacity of the electric grid within a covered
        area, and any Federal agency action authorizing such activities
        shall not be considered to be--
                    ``(A) a major Federal action for purposes of the
                National Environmental Policy Act of 1969 (42 U.S.C.
                4321 et seq.); or
                    ``(B) an undertaking for purposes of section 306108
                of title 54, United States Code.
            ``(2) Inclusions.--The activities described in paragraph
        (1) include--
                    ``(A) any repair, maintenance, replacement,
                upgrade, rebuilding, modification, optimization, minor
                relocation of, or addition to, a covered facility,
                including--
                            ``(i) reconductoring;
                            ``(ii) an increase in operating voltage;
                            ``(iii) a circuit addition or adjustment;
                            ``(iv) installation of advanced
                        transmission technologies (as defined in
                        section 1223(a) of the Energy Policy Act of
                        2005 (42 U.S.C. 16422(a))); and
                            ``(v) installation of grid-enhancing
                        advanced transmission technologies (as defined
                        in section 232(a));
                    ``(B) any minimum widening of an existing right-of-
                way associated with an activity described in
                subparagraph (A) that--
                            ``(i) is necessary to comply with
                        applicable electrical standards; or
                            ``(ii) remains within a covered area;
                    ``(C) an addition of energy storage at or near a
                covered facility; and
                    ``(D) the addition of a parallel circuit within an
                existing right-of-way.''.
    (b) Interstate Natural Gas Pipeline Modernization Within Existing
Corridors.--Section 7 of the Natural Gas Act (15 U.S.C. 717f) is
amended by adding at the end the following:
    ``(i) Covered Pipeline Activities.--
            ``(1) Definitions.--In this subsection:
                    ``(A) Covered activity.--The term `covered
                activity' means any repair, maintenance, replacement,
                upgrade, rebuilding, modification, optimization, minor
                relocation, looping, compression, capacity-enhancement
                project, or addition to a covered facility.
                    ``(B) Covered area.--The term `covered area'
                means--
                            ``(i) an existing right-of-way; and
                            ``(ii) the footprint of original
                        construction previously authorized and
                        environmentally reviewed under the National
                        Environmental Policy Act of 1969 (42 U.S.C.
                        4321 et seq.), together with any minimum
                        additional area adjacent to an existing right-
                        of-way, provided that the total additional area
                        is not more than \1/4\ mile from the boundary
                        of the right-of-way, that is necessary to
                        complete a covered activity.
                    ``(C) Covered facility.--The term `covered
                facility' means an existing interstate natural gas
                pipeline or associated infrastructure, including a
                compressor station, meter station, regulator station,
                valve site, launcher, receiver, storage-related
                facility, or similar facility located within a covered
                area.
            ``(2) Environmental review.--A covered activity and any
        Federal agency action authorizing that covered activity--
                    ``(A) shall not be considered a major Federal
                action under the National Environmental Policy Act of
                1969 (42 U.S.C. 4321 et seq.) if the covered activity
                remains within a covered area; and
                    ``(B) shall not be considered an undertaking for
                purposes of section 306108 of title 54, United States
                Code, if the covered activity remains within a covered
                area.
            ``(3) Rule of construction.--Nothing in this subsection
        affects the applicability of any requirement under--
                    ``(A) the Federal Water Pollution Control Act (33
                U.S.C. 1251 et seq.) (commonly known as the `Clean
                Water Act');
                    ``(B) the Clean Air Act (42 U.S.C. 7401 et seq.);
                or
                    ``(C) any other applicable Federal law not
                expressly addressed by this subsection.''.

SEC. 2103. TRANSMISSION PLANNING.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) is amended
by adding at the end the following:

``SEC. 224. TRANSMISSION STUDY.

    ``(a) In General.--Not later than 1 year after the date of
enactment of this section and every 3 years thereafter, the Secretary
of Energy (referred to in this section as the `Secretary'), in
consultation with affected States and Indian Tribes, shall conduct a
study of electric transmission capacity constraints and congestion.
    ``(b) Report.--
            ``(1) In general.--Not less frequently than once every 3
        years, the Secretary shall issue a report based on the study
        under subsection (a) or other information relating to electric
        transmission capacity constraints and congestion.
            ``(2) Opportunity for comment.--Before issuing a report
        under paragraph (1), the Secretary shall--
                    ``(A) provide an opportunity for comment to
                affected States and Indian Tribes; and
                    ``(B) take into consideration any comments received
                under subparagraph (A) in preparing the report.
            ``(3) Identification of areas with capacity constraints and
        congestion.--After considering alternatives and recommendations
        from interested parties (including any comments received from
        affected States and Indian Tribes), the Secretary may identify
        in a report issued under paragraph (1) any geographic area
        that--
                    ``(A) is experiencing electric energy transmission
                capacity constraints or congestion that adversely
                affects consumers; or
                    ``(B) is expected to experience such energy
                transmission capacity constraints or congestion.
    ``(c) Consultation.--Not less frequently than once every 3 years,
the Secretary, in conducting the study under subsection (a) and issuing
the report under subsection (b), shall consult with affected
transmission planning regions (as defined in section 225(a)) and any
appropriate regional entity referred to in section 215.
    ``(d) Alaska.--The Secretary--
            ``(1) shall, in consultation with the State of Alaska and
        affected Indian Tribes, consider any intrastate transmission
        capacity constraints and congestion within the State of Alaska
        in the study under subsection (a); and
            ``(2) in issuing the report under subsection (b), may,
        subject to the approval of the Regulatory Commission of Alaska,
        identify any geographic area in the State of Alaska that--
                    ``(A) is experiencing electric energy transmission
                capacity constraints or congestion that adversely
                affects consumers; or
                    ``(B) is expected to experience such energy
                transmission capacity constraints or congestion.

``SEC. 225. PLANNING FOR TRANSMISSION FACILITIES THAT ENHANCE GRID
              RELIABILITY, AFFORDABILITY, AND RESILIENCE.

    ``(a) Definitions.--In this section:
            ``(1) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(2) ERO.--The term `ERO' has the meaning given the term
        in section 215(a).
            ``(3) Exempt transmitting utility.--The term `exempt
        transmitting utility' means a transmitting utility that is a
        State or any political subdivision of a State, an electric
        cooperative that receives financing under the Rural
        Electrification Act of 1936 (7 U.S.C. 901 et seq.) or that
        sells less than 4,000,000 megawatt hours of electricity per
        year, or any agency, authority, or instrumentality of any one
        or more of the foregoing, or any corporation which is wholly
        owned, directly or indirectly, by any one or more of the
        foregoing.
            ``(4) Improved reliability.--The term `improved
        reliability' means that, on balance, considering each of the
        matters described in subparagraphs (A) through (D), reliability
        is improved in a material manner that benefits customers
        through at least one of the following:
                    ``(A) Facilitating compliance with a mandatory
                standard for reliability approved by the Commission
                under section 215.
                    ``(B) A reduction in expected unserved energy, loss
                of load hours, or loss of load probability (as defined
                by the ERO).
                    ``(C) Facilitating compliance with a tariff
                requirement or process for resource adequacy on file
                with the Commission.
                    ``(D) Any other similar material improvement,
                including a reduction in correlated outage risk.
            ``(5) Interregional transmission facility.--The term
        `interregional transmission facility' means a transmission
        facility that--
                    ``(A) is located within 2 or more neighboring
                transmission planning regions; or
                    ``(B) significantly impacts the ability of 1 or
                more transmission planning regions to transmit electric
                energy among neighboring transmission planning regions.
            ``(6) Regional transmission facility.--The term `regional
        transmission facility' means a transmission facility that--
                    ``(A) is located within 1 transmission planning
                region; and
                    ``(B) is not an interregional transmission
                facility.
            ``(7) Transmission planning region.--
                    ``(A) In general.--The term `transmission planning
                region'--
                            ``(i) when used in a geographical sense,
                        means a region for which the Commission
                        determines that electric transmission planning
                        is appropriate, such as a region established in
                        accordance with Order No. 1000 of the
                        Commission, entitled `Transmission Planning and
                        Cost Allocation by Transmission Owning and
                        Operating Public Utilities' (76 Fed. Reg. 49842
                        (August 11, 2011)); and
                            ``(ii) when used in a corporate sense,
                        means the Transmission Organization or other
                        entity responsible for planning or operating
                        electric transmission facilities within a
                        region described in clause (i).
                    ``(B) Exclusion.--The term `transmission planning
                region' does not include the Electric Reliability
                Council of Texas or the region served by members of the
                Electric Reliability Council of Texas.
    ``(b) Jurisdiction.--
            ``(1) ERCOT.--This section shall not apply within the area
        referred to in section 212(k)(2)(A).
            ``(2) Other utilities.--
                    ``(A) In general.--For the purposes of this
                section, the Commission shall have jurisdiction over
                all transmitting utilities, including transmitting
                utilities described in section 201(f), but excluding
                any ERCOT utility (as defined in section 212(k)(2)(B))
                and any exempt transmitting utility that does not
                voluntarily subject itself to Commission jurisdiction
                for the purposes of this section.
                    ``(B) Clarification.--Being subject to Commission
                jurisdiction for the purposes of this section shall not
                make an entity described in section 201(f) a public
                utility for the purposes of section 201(e).
    ``(c) Rulemaking Requirement.--Not later than 180 days after the
date of enactment of this section, the Commission shall, consistent
with the requirements of this section, by rule--
            ``(1) require each transmission planning region to
        establish a process for planning for regional transmission
        facilities in accordance with this section;
            ``(2) require neighboring transmission planning regions to
        jointly establish a process for planning interregional
        transmission facilities in accordance with this section;
            ``(3) require each transmission planning region to submit
        to the Commission for approval--
                    ``(A) a regional transmission planning process; and
                    ``(B) a joint interregional transmission planning
                process with each of its neighboring transmission
                planning regions, which requirement may, at the
                discretion of the transmission planning region, be
                satisfied through the submission of--
                            ``(i) a separate joint interregional
                        transmission planning process with each of its
                        neighboring transmission planning regions; or
                            ``(ii) 1 or more joint interregional
                        transmission planning processes, any of which
                        may be submitted with any 1 or more of its
                        neighboring transmission planning regions; and
            ``(4) establish rate treatments for regional and
        interregional transmission planning and cost allocation.
    ``(d) Transmission Planning Process Elements.--The Commission shall
require, within the rule under subsection (c), that regional and joint
interregional transmission planning processes contain the following
elements:
            ``(1) Compatibility.--A common set of input assumptions and
        models, on a consistent timeline, that--
                    ``(A) allow for the joint identification and
                selection of specific interregional transmission
                facilities, and individual identification and selection
                of specific regional transmission facilities, by
                transmission planning regions, for construction or
                modification, including through the use of advanced
                transmission conductors (including superconductors) and
                reconductoring;
                    ``(B) consider, to the extent reasonable and
                economical, modifications that maximize the
                transmission capabilities of existing towers,
                structures, or rights-of-way; and
                    ``(C) consider interactions with existing regional,
                interregional, and supplemental transmission plans and
                planning processes, including the consolidated planning
                process established under section 228(a).
            ``(2) Transmission benefits.--A common set of benefits for
        regional and interregional transmission planning and cost
        allocation, including--
                    ``(A) improved reliability;
                    ``(B) reduced congestion;
                    ``(C) reduced power losses;
                    ``(D) greater carrying capacity that delivers
                improved reliability or reductions in the cost of
                delivered power;
                    ``(E) reduced operating reserve requirements; and
                    ``(F) improved access to generation that achieves
                reductions in the cost of delivered power.
            ``(3) Selection criteria.--Criteria governing the selection
        by transmission planning regions, for construction or
        modification, of regional and interregional transmission
        facilities that--
                    ``(A) provide improved reliability;
                    ``(B) protect or benefit consumers; and
                    ``(C) are consistent with the public interest.
            ``(4) State and tribal participation.--Any right, role,
        engagement period, or opportunity afforded to States or
        political subdivisions of a State under a rule issued under
        subsection (c), or under any order described in subsection
        (h)(1), shall be afforded on a commensurate basis to Indian
        Tribes or subdivisions of Indian Tribes.
    ``(e) Deadline; Planning Cycles.--The regional and joint
interregional transmission planning processes required to be submitted
to the Commission pursuant to the rule under subsection (c) shall be--
            ``(1) submitted to the Commission not later than 2 years
        after the date of enactment of this section; and
            ``(2) conducted, including the identification of
        transmission needs and the evaluation and selection of
        transmission facilities in accordance with subsection (d), not
        less frequently than once every 4 years, with the first
        planning cycle commencing not later than 1 year after the date
        on which the Commission approves the applicable planning
        process under subsection (f)(2).
    ``(f) Commission Review.--The Commission shall--
            ``(1) review each regional and joint interregional
        transmission planning process submitted pursuant to the rule
        under subsection (c); and
            ``(2) approve the regional or joint interregional
        transmission planning process if the Commission finds that the
        process--
                    ``(A) meets the requirements of subsection (d);
                    ``(B) allocates costs in accordance with subsection
                (g);
                    ``(C) meets the requirement of sections 205 and 206
                that all rates, charges, terms, and conditions will be
                just and reasonable and not unduly discriminatory or
                preferential; and
                    ``(D) is consistent with the public interest.
    ``(g) Cost Allocation.--
            ``(1) Transmission tariffs.--For the purposes of this
        section and except as provided in paragraph (2), any
        transmitting utility that owns, controls, or operates, or
        proposes to construct, electric transmission facilities
        selected in a regional or joint interregional transmission plan
        for the purposes of cost allocation pursuant to a transmission
        planning process approved under subsection (f)(2) or described
        in subsection (h)(1) shall file a tariff or tariff revision
        with the Commission pursuant to section 205 and the regulations
        of the Commission allocating the costs of the new or modified
        transmission facilities.
            ``(2) Exception.--In the case of an exempt transmitting
        utility that owns, controls, or operates electric transmission
        facilities described in paragraph (1), the Commission,
        notwithstanding section 211A(c), shall require the exempt
        transmitting utility to provide transmission services over such
        facilities pursuant to section 211A and the regulations of the
        Commission allocating the costs of the new or modified
        transmission facilities.
            ``(3) Requirement.--The Commission shall require that
        tariffs or tariff revisions filed under this section are just
        and reasonable and allocate the costs of providing service to
        customers that benefit, in accordance with the cost-causation
        principle and at least roughly commensurate with the benefits,
        including through the benefits described in subsection (d)(2).
            ``(4) Ratepayer protection.--Customers that receive no
        benefit, or benefits that are trivial in relation to the costs
        sought to be allocated, from electric transmission facilities
        constructed or modified under this section shall not be
        involuntarily allocated any of the costs of those transmission
        facilities.
    ``(h) Compliance With This Section.--A Commission order or
rulemaking regarding transmission planning that is effective as of the
date of enactment of this section, including orders published in the
Federal Register on April 28, 2025, December 6, 2024, and June 11,
2024, shall constitute compliance with the regional transmission
planning and cost allocation requirements of this section and relieves
the Commission of the requirements under subsection (c)(1).
    ``(i) Construction Permit.--For the purposes of obtaining a
construction permit under section 216(b), a project that is selected by
1 or more transmission planning regions pursuant to a regional or joint
interregional transmission plan in accordance with this section shall
be considered to satisfy paragraphs (2) through (5) and, if applicable,
(6) of that section.
    ``(j) Failure To Submit Planning Process.--In the event that
neighboring transmission planning regions (in the case of an
interregional planning process) or a single planning region (in the
case of a regional planning process) fails to submit to the Commission
a regional or joint interregional transmission planning process, as
applicable, under this section, the Commission shall, as the Commission
determines to be appropriate, grant a request to extend the time for
submission of the planning process for not more than 6 months after the
deadline the Commission requires for compliance with the rule under
subsection (c).
    ``(k) NEPA.--For purposes of the National Environmental Policy Act
of 1969 (42 U.S.C. 4321 et seq.)--
            ``(1) any approval of a regional or joint interregional
        transmission planning process under subsection (f) shall not be
        considered a major Federal action; and
            ``(2) any permit granted under section 216(b) for a project
        that is selected by transmission planning regions pursuant to a
        joint interregional transmission plan shall be considered a
        major Federal action.
    ``(l) Savings Provision.--Except as expressly provided in this
section, nothing in this section shall be construed as conferring,
limiting, or impairing any authority of the Commission under any other
provision of law.''.

SEC. 2104. IMPROVEMENTS RELATING TO LOCAL TRANSMISSION PLANNING AND
              DEVELOPMENT.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as
amended by section 2103) is amended by adding at the end the following:

``SEC. 226. OVERSIGHT OF LOCAL TRANSMISSION PLANNING AND DEVELOPMENT.

    ``(a) Definitions.--In this section:
            ``(1) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(2) Local transmission facility.--The term `local
        transmission facility' means an electric transmission
        facility--
                    ``(A) that is located solely within the retail
                distribution service territory or footprint of a public
                utility transmission provider; and
                    ``(B) is not selected in a regional transmission
                plan for purposes of cost allocation.
            ``(3) Referring state.--The term `referring State' means 1
        or more States with jurisdiction over a referring State
        commission that has jurisdiction over the referred public
        utility.
            ``(4) Referring state commission.--The term `referring
        State commission' means 1 or more State commissions making a
        referral under subsection (b).
            ``(5) Regional transmission facility.--The term `regional
        transmission facility' means an electric transmission facility
        the cost of which is recovered from transmission customers
        located within more than 1 service territory but within a
        single transmission planning region.
            ``(6) Transmission planning region.--The term `transmission
        planning region' means a region for which the Commission
        determines that electric transmission planning is appropriate,
        such as a region established in accordance with Order No. 1000
        of the Commission, entitled `Transmission Planning and Cost
        Allocation by Transmission Owning and Operating Public
        Utilities' (76 Fed. Reg. 49842 (August 11, 2011)).
    ``(b) State Commission Referral Authority.--
            ``(1) In general.--Not later than 1 year after the date of
        enactment of this section, the Commission shall, by rule,
        establish procedures by which 1 or more State commissions may
        refer a public utility over which those State commissions have
        jurisdiction to the Commission for an investigation into the
        processes used by the public utility for planning, developing,
        and replacing local transmission facilities.
            ``(2) Requirements.--A referral under paragraph (1) shall
        include, at a minimum--
                    ``(A) a description of the 1 or more processes used
                by the public utility for local transmission planning,
                development, and replacement about which the referring
                State commission is concerned;
                    ``(B) a description of the harm that those
                processes may be causing to wholesale or retail
                electric customers within the referring State; and
                    ``(C) a description of the efforts that the
                referring State commission has taken to resolve its
                concerns about the identified local transmission
                planning, development, and replacement processes prior
                to referral to the Commission.
    ``(c) Commission Action To Exercise Oversight of Local Transmission
Planning, Development, and Replacement.--
            ``(1) In general.--On receipt of a referral under
        subsection (b) from a referring State commission, the
        Commission shall--
                    ``(A) dismiss the referral as unsupported and make
                public the reasons for that dismissal, in accordance
                with the rulemaking under paragraph (1) of that
                subsection and the requirements described in paragraph
                (2) of that subsection; or
                    ``(B)(i) notice for initial public comment the
                initiation of an investigation; and
                    ``(ii) concurrently with that notice, establish an
                investigative team to be composed of--
                            ``(I) 1 or more non-decisional individuals
                        from an office designated by the Chairman of
                        the Commission; and
                            ``(II) up to 3 representatives appointed by
                        the referring State commission.
            ``(2) Authority of investigative team.--An investigative
        team established under paragraph (1)(B)(ii) shall have all
        investigative authorities that would be available to the
        Commission or Commission staff in proceedings under or relating
        to the authority of the Commission under section 307.
            ``(3) Preliminary findings report and recommendation.--
                    ``(A) Preliminary findings report.--Not later than
                120 days after notice for initial public comment of the
                initiation of an investigation under paragraph
                (1)(B)(i), the investigative team established under
                paragraph (1)(B)(ii) shall issue a preliminary findings
                report.
                    ``(B) Final report and recommendation.--If an
                investigative team established under paragraph
                (1)(B)(ii) concludes that the processes used by a
                public utility for planning, developing, and replacing
                local transmission facilities are not resulting in the
                selection of the more efficient or cost-effective local
                transmission facilities or that those processes are
                interfering with the processes of the relevant
                transmission planning region for planning, developing,
                and replacing regional transmission facilities, the
                investigative team shall issue a final report and
                recommendation to the Commission explaining that
                conclusion and recommending a remedy.
            ``(4) Commission response to report.--
                    ``(A) Notice and comment.--Not later than 14
                business days after receiving a final report and
                recommendation under paragraph (3)(B), the Commission
                shall notice the report for comment.
                    ``(B) Order.--After reviewing the record, including
                any comments received under subparagraph (A), and not
                later than 120 days after issuing the notice for
                comment under subparagraph (A), the Commission shall
                issue an order taking any such action that the
                Commission determines to be appropriate, which may
                include 1 or more of the following remedies:
                            ``(i) Requiring changes to the processes
                        used by the applicable public utility for
                        planning local transmission facilities.
                            ``(ii) Reducing the return on equity of the
                        public utility with respect to local
                        transmission facilities.
                            ``(iii) Eliminating the presumption of
                        prudence for local transmission facilities
                        planned, developed, or replaced by the public
                        utility.
                            ``(iv) A civil penalty, credited to the
                        transmission customers who bore the costs of
                        the applicable local transmission facility, of
                        up to $5,000,000 for each local transmission
                        facility--
                                    ``(I) that was developed or
                                energized during the period beginning
                                60 days before the referral under
                                subsection (b) and ending on the date
                                on which the order under this
                                subparagraph is issued; and
                                    ``(II) the development or
                                energizing of which the Commission
                                determines--
                                            ``(aa) was imprudent; and
                                            ``(bb) caused financial
                                        harm to wholesale or retail
                                        electric customers within the
                                        referring State.
                            ``(v) Any other appropriate remedy.
    ``(d) Savings Provision.--Nothing in this section limits or impairs
any authority of the Commission under any other provision of law.
    ``(e) Judicial Review.--Orders issued by the Commission pursuant to
subsection (c)(4)(B) shall be subject to rehearing and judicial review
pursuant to section 313, except that any such order imposing a civil
penalty pursuant to subsection (c)(4)(B)(iv) shall be issued and
reviewed in accordance with the provisions of section 31(d).''.

SEC. 2105. PROHIBITION OF RIGHT OF FIRST REFUSAL.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as
amended by section 2104) is amended by adding at the end the following:

``SEC. 227. PROHIBITION OF RIGHT OF FIRST REFUSAL.

    ``Except as otherwise provided by any rule or order of the Federal
Energy Regulatory Commission in effect as of the date of enactment of
this section, a Federal right of first refusal is prohibited with
respect to a transmission facility selected in a regional or
interregional transmission plan for the purposes of cost allocation.''.

SEC. 2106. CONSOLIDATED PLANNING PROCESS.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as
amended by section 2105) is amended by adding at the end the following:

``SEC. 228. CONSOLIDATED PLANNING PROCESS.

    ``(a) Consolidated Generation and Transmission Planning.--Not later
than 18 months after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026, the Federal Energy Regulatory
Commission (referred to in this section as the `Commission') shall
issue a rule requiring each Transmission Organization to file a
consolidated interconnection and regional transmission planning process
that--
            ``(1) jointly evaluates electric transmission facilities
        and the generating capacity reasonably anticipated to be needed
        over the next 20 years to meet both forecasted demand and
        forecasted generation;
            ``(2) routinely identifies and publishes--
                    ``(A) resource and fuel-neutral planned
                interconnection locations for--
                            ``(i) generating and storage capacity; and
                            ``(ii) transmission capacity for customers;
                        and
                    ``(B) an upfront, fixed, subregional, per-megawatt
                fee for each planned generation and storage
                interconnection location;
            ``(3) establishes a streamlined generator interconnection
        and transmission service request study process with--
                    ``(A) a single decision point;
                    ``(B) meaningful and nonrefundable financial
                security; and
                    ``(C) withdrawal penalties after the determination
                of total costs of interconnection and any limitations
                from contingencies are provided to the customer that
                are sufficient to deter speculative projects; and
            ``(4) aims to co-optimize solutions to cost-effectively
        address electricity demand growth while integrating new
        generation and storage resources.
    ``(b) Deadline; Planning Cycles.--The consolidated interconnection
and regional transmission planning process required to be filed with
the Commission pursuant to the rule under subsection (a) shall be--
            ``(1) filed with the Commission not later than 2 years
        after the date of enactment of the Bipartisan American
        Affordability and Jobs Act of 2026; and
            ``(2) conducted not less frequently than once every 2
        years.
    ``(c) Commission Review.--The Commission shall--
            ``(1) review each consolidated interconnection and regional
        transmission planning process filed pursuant to the rule under
        subsection (a); and
            ``(2) approve the consolidated interconnection and regional
        transmission planning process if the Commission finds that the
        process--
                    ``(A) as adopted pursuant to this section,
                including any revisions to the rule issued under
                subsection (a), meets the requirement of sections 205
                and 206 that all rates, charges, terms, and conditions
                be just and reasonable and not unduly discriminatory or
                preferential; and
                    ``(B) is consistent with the rule issued under
                subsection (a).
    ``(d) Savings Provision.--Nothing in this section prevents the
Commission from finding--
            ``(1) that the current generator interconnection and
        regional transmission planning processes are compliant with the
        rule issued under subsection (a); or
            ``(2) that a Transmission Organization achieves the
        objectives of this section through comparable processes that
        meet the objectives of the rule issued under subsection (a)
        during the Commission review pursuant to subsection (c).''.

SEC. 2107. RATEPAYER PROTECTION.

    (a) FERC Pricing Policy for Transmission Services Provided by
Public Utilities and Transmitting Utilities.--
            (1) Findings.--Congress finds that--
                    (A) it is the policy of the United States that
                computational load owners and computational load
                operators bear the full cost of any electric service
                that they require and the full cost of any
                infrastructure built to serve them, regardless of
                whether they take the electric service that they
                request, so that such costs are not borne by other
                customers, including residential customers;
                    (B) it is not just and reasonable within the
                meaning of sections 205 and 206 of the Federal Power
                Act (16 U.S.C. 824d, 824e) for any public utility or
                transmitting utility to maintain rates, terms, or
                conditions of service that, by their terms, charge less
                than the embedded costs and incremental expansion costs
                to eligible computational load customers seeking
                transmission service on behalf of computational load
                owners and computational load operators;
                    (C) transmission costs incurred in response to
                transmission service from eligible computational load
                customers should be fully assigned to such customers so
                as to minimize or avoid the cost burden on other
                customers; and
                    (D) computational load owners and computational
                load operators should incur the full cost of the
                transmission service they require.
            (2) Definitions.--In this subsection:
                    (A) 1994 transmission pricing policy statement.--
                The term ``1994 transmission pricing policy statement''
                means the policy statement issued by the Commission on
                October 26, 1994, and published in the Federal Register
                on November 3, 1994, relating to ``Inquiry Concerning
                the Commission's Pricing Policy for Transmission
                Services Provided by Public Utilities Under the Federal
                Power Act; Policy Statement'' (59 Fed. Reg. 55031).
                    (B) Commission.--The term ``Commission'' means the
                Federal Energy Regulatory Commission.
                    (C) Computational load operator.--The term
                ``computational load operator'' means an entity that
                operates a computational load site.
                    (D) Computational load owner.--The term
                ``computational load owner'' means an entity that owns
                a computational load site.
                    (E) Computational load site.--
                            (i) In general.--The term ``computational
                        load site'' means 1 or more buildings,
                        structures, or installations at a single
                        location that--
                                    (I) primarily contain information
                                technology infrastructure used for--
                                            (aa) creating, executing,
                                        and delivering software
                                        applications and services;
                                            (bb) artificial
                                        intelligence training,
                                        deployment, and delivery;
                                            (cc) cryptocurrency mining;
                                        or
                                            (dd) other computational
                                        activities at a data center;
                                        and
                                    (II) are supplied through
                                electrical equipment that is connected
                                to the bulk-power system (as defined in
                                section 215(a) of the Federal Power Act
                                (16 U.S.C. 824o(a))).
                            (ii) Exclusion.--The term ``computational
                        load site'' does not include computing or data
                        storage equipment that is ancillary to a
                        facility the primary purpose of which is a
                        commercial or industrial activity other than an
                        activity described in subparagraph (A).
                    (F) Eligible computational load customer.--The term
                ``eligible computational load customer'' has the
                meaning given the term by the Commission by rule or
                order.
                    (G) Public utility.--The term ``public utility''
                has the meaning given the term in section 201(e) of the
                Federal Power Act (16 U.S.C. 824(e)).
                    (H) Transmitting utility.--The term ``transmitting
                utility'' has the meaning given the term in section 3
                of the Federal Power Act (16 U.S.C. 796).
            (3) Revisions of policy statement.--
                    (A) In general.--Not later than 90 days after the
                date of enactment of this Act, the Commission shall--
                            (i) revise the 1994 transmission pricing
                        policy statement--
                                    (I) to require public utilities and
                                transmitting utilities to charge
                                eligible computational load customers
                                seeking transmission service on behalf
                                of computational load owners and
                                computational load operators the
                                embedded cost and a reasonable
                                assessment, as determined by the
                                Commission, of the incremental cost of
                                transmission service;
                                    (II) to ensure that any incremental
                                costs paid are credited to the annual
                                transmission revenue requirement of the
                                applicable public utility or
                                transmitting utility to prevent double
                                recovery from other customers; and
                                    (III) to provide for a lower cost
                                of transmission service for eligible
                                computational load customers seeking
                                transmission service on behalf of
                                computational load owners and
                                computational load operators that elect
                                non-firm transmission service; and
                            (ii) issue a notice of proposed rulemaking
                        requiring public utilities and transmitting
                        utilities--
                                    (I) to establish or revise
                                transmission rates for eligible
                                computational load customers seeking
                                transmission service on behalf of
                                computational load owners and
                                computational load operators in
                                accordance with that revised
                                transmission pricing policy statement;
                                    (II) to conduct a standardized
                                analysis to identify a reasonable
                                assessment of the incremental costs of
                                transmission service to eligible
                                computational load customers;
                                    (III) to conduct a standardized
                                analysis to identify and evaluate cost
                                reduction options;
                                    (IV) to provide a transmission rate
                                that includes the embedded cost and a
                                reasonable assessment of the
                                incremental cost of transmission
                                service to eligible computational load
                                customers; and
                                    (V) to establish or revise
                                transmission rates for existing
                                customers to go into effect following
                                the issuance of the final rule under
                                subparagraph (B), consistent with
                                subclauses (I) through (IV).
                    (B) Final rule.--Not later than 1 year after the
                date on which the notice of proposed rulemaking
                described in subparagraph (A)(ii) is issued, the
                Commission shall issue a final rule requiring public
                utilities and transmitting utilities to establish or
                revise transmission rates for eligible computational
                load customers seeking transmission service on behalf
                of computational load owners and computational load
                operators.
                    (C) Cost assignment.--In revising the 1994
                transmission pricing policy statement and issuing a
                notice of proposed rulemaking and final rule under this
                paragraph, the Commission may treat eligible
                computational load customers seeking transmission
                service on behalf of computational load owners and
                computational load operators as a customer class and
                assign some or all costs to the class rather than to
                individual customers.
                    (D) Coordination.--
                            (i) Regional and interregional transmission
                        plans.--For transmission facilities subject to
                        section 216(f) of the Federal Power Act,
                        selected under section 225 of that Act, or
                        pursuant to a Commission rule or order, a
                        reasonable assessment of the incremental cost
                        shall be such costs assigned under each
                        respective section or Commission rule or order.
                            (ii) Consolidated planning process.--For
                        transmission facilities selected pursuant to
                        section 228 of the Federal Power Act, a
                        reasonable assessment of the incremental cost
                        shall be such costs assigned under such section
                        or an applicable Commission rule or order.
    (b) Ratepayer Protection With Respect to Data Centers.--Part II of
the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by section
2106) is amended by adding at the end the following:

``SEC. 229. RATEPAYER PROTECTION WITH RESPECT TO DATA CENTERS.

    ``(a) Definitions.--In this section:
            ``(1) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(2) Computational load operator.--The term `computational
        load operator' means an entity that operates a computational
        load site.
            ``(3) Computational load owner.--The term `computational
        load owner' means an entity that owns a computational load
        site.
            ``(4) Computational load site.--
                    ``(A) In general.--The term `computational load
                site' means 1 or more buildings, structures, or
                installations at a single location that primarily
                contain information technology infrastructure used
                for--
                            ``(i) creating, executing, and delivering
                        software applications and services;
                            ``(ii) artificial intelligence training,
                        deployment, and delivery;
                            ``(iii) cryptocurrency mining; or
                            ``(iv) other computational activities at a
                        data center.
                    ``(B) Exclusion.--The term `computational load
                site' does not include computing or data storage
                equipment that is ancillary to a facility the primary
                purpose of which is a commercial or industrial activity
                other than an activity described in subparagraph (A).
            ``(5) Retail embedded cost.--The term `retail embedded
        cost' means the average cost of retail service reflected in the
        rates otherwise in effect for the customer class that would
        apply to the applicable computational load owner or
        computational load operator.
            ``(6) Retail incremental cost.--The term `retail
        incremental cost' means a reasonable assessment of costs that
        would be avoided had a specific computational load owner or
        computational load operator not been served by an electric
        utility, including all costs to construct, own, and operate
        power generation or storage resources and electric transmission
        and distribution services associated with serving the
        computational load site.
            ``(7) State.--The term `State' includes--
                    ``(A) an applicable State commission; and
                    ``(B) any other State authority with jurisdiction
                over retail electric service.
            ``(8) Transmission service category.--The term
        `transmission service category' means a class of transmission
        service provided under a tariff on file with the Commission,
        including--
                    ``(A) network integration transmission service;
                    ``(B) point-to-point transmission service; and
                    ``(C) any interim, non-firm, contract demand, or
                other service that limits--
                            ``(i) the quantity of energy a load may
                        withdraw from the transmission system; or
                            ``(ii) the conditions under which the load
                        may withdraw energy from the transmission
                        system.
    ``(b) Ratepayer Protection Floor.--
            ``(1) No subsidy of data centers.--No portion of the retail
        incremental cost may be allocated to, or recovered in the rates
        of, any customer other than a computational load owner or a
        computational load operator.
            ``(2) Surplus permitted.--Paragraph (1) does not limit the
        authority of a State under subsection (c)--
                    ``(A) to recover from a computational load owner or
                computational load operator amounts in excess of the
                retail incremental cost; or
                    ``(B) to credit those amounts to other customers as
                a rebate or a reduction to the electric utility costs
                that are used as a basis for the calculation of
                customer rates.
            ``(3) Continuing recovery on exit.--A rate, charge, or
        agreement for service to a computational load site shall be
        designed to recover from the computational load owner or
        computational load operator the full retail incremental cost of
        the electric utility, and such recovery shall continue
        notwithstanding the termination by the computational load owner
        or computational load operator of a contract or other agreement
        pertaining to the sale of electric energy, or the cessation by
        the computational load owner or computational load operator of
        the purchase of electric energy, before that retail incremental
        cost has been fully recovered.
            ``(4) Financial assurance.--Before constructing, or making
        an upgrade to, a generation, transmission, or distribution
        facility necessary to serve a computational load site, an
        electric utility shall require the computational load owner or
        computational load operator to provide reasonable financial
        assurances or contributions sufficient to cover the expected
        cost of, or upgrade to, the computational load site, subject to
        the condition that any financial assurances or contributions
        provided by the applicable computational load owner or
        computational load operator to a public utility or Transmission
        Organization for the same computational load site or upgrade
        shall be credited against the requirement of this paragraph.
    ``(c) State Authority to Hold Open Seasons and Competitive
Solicitations and Set Certain Rates.--
            ``(1) In general.--Notwithstanding any other provision of
        this Act, in accordance with subsection (b)(3), a State may,
        with respect to retail electric service to computational load
        owners and computational load operators--
                    ``(A) establish rates, charges, or contract terms
                that recover more than the retail embedded cost, and
                more than the retail incremental cost, of serving a
                computational load site;
                    ``(B) require that revenue collected from a
                computational load owner or computational load operator
                in excess of retail incremental cost be credited or
                applied to reduce the rates of other retail customers;
                    ``(C) in effectuating the policy described in this
                paragraph, use an open season or competitive
                solicitation to allocate among computational load
                owners and computational load operators the opportunity
                to obtain and contract for retail electric service,
                making awards in such manner as returns the greatest
                benefit to other ratepayers on a net present value
                basis, notwithstanding the order in which applications
                or requests for service are received from computational
                load owners or computational load operators or any
                other basis for making such awards, subject to the
                condition that each award under such an open season or
                competitive solicitation shall specify the maximum
                quantity of firm demand awarded, in megawatts, and the
                transmission service category on the basis of which the
                computational load site is to be served;
                    ``(D) condition the provision of retail electric
                service to a computational load site on the
                procurement, construction, or contracting by the
                computational load owner or computational load operator
                for new generation resources sufficient to serve the
                demand of the computational load site; and
                    ``(E) condition the provision of retail electric
                service to a computational load site on the
                computational load owner or computational load operator
                taking, or agreeing to take, a transmission service
                category that limits--
                            ``(i) the quantity of energy the
                        computational load site may withdraw from the
                        transmission system; or
                            ``(ii) the conditions under which the
                        computational load site may withdraw energy
                        from the transmission system.
            ``(2) Priority of open seasons and state competitive
        solicitations.--
                    ``(A) Broad discretion.--For purposes of an open
                season or competitive solicitation under paragraph (1),
                a State shall, with respect to retail electric service
                to a computational load owner or computational load
                operator, be afforded broad discretion to conduct, to
                authorize an electric utility to conduct, or to require
                an electric utility to conduct an open season or
                competitive solicitation to allocate the opportunity to
                interconnect, or to obtain service for, a computational
                load owner or computational load operator.
                    ``(B) Electric utility filing.--An electric utility
                may file with a State an application to conduct an open
                season or competitive solicitation under subparagraph
                (A).
                    ``(C) Authority to require.--A State may require an
                electric utility to conduct an open season or
                competitive solicitation under subparagraph (A).
    ``(d) Protection of American Industry.--A State may--
            ``(1) treat computational load owners and computational
        load operators as a separate class of retail electric service;
        and
            ``(2) establish rates, charges, terms, conditions, and
        interconnection or service priorities for computational load
        owners and computational load operators that differ from, and
        that are less favorable than, those applicable to other large
        industrial, manufacturing, or commercial loads.
    ``(e) Rules of Construction.--
            ``(1) State and federal authority.--Nothing in this section
        expands or diminishes the jurisdiction of the Commission or any
        State, including--
                    ``(A) State authority over retail electric service,
                rate design, and resource planning; and
                    ``(B) Commission authority over rates, terms, and
                conditions of service with respect to transmission
                service of electric energy in interstate commerce.
            ``(2) Recognition of reserved state authority.--
                    ``(A) In general.--The authority described in
                subsection (c)(1) is an attribute of the reserved
                authority of the States over retail electric service.
                    ``(B) Clarification.--This section--
                            ``(i) recognizes and confirms the authority
                        described in subparagraph (A); and
                            ``(ii) is not the source of that authority.
    ``(f) Applicability.--
            ``(1) Prospective application.--Subsections (b) and (c)
        apply to any computational load site that interconnects on or
        after the date of enactment of this section.
            ``(2) Existing arrangements.--
                    ``(A) In general.--Any arrangement to serve a
                computational load site that was approved by a State
                before the date of enactment of this section shall
                remain in effect, subject to subparagraph (B).
                    ``(B) State revisions.--To the extent permissible
                under applicable State law, a State may revise an
                arrangement described in subparagraph (A) to achieve
                consistency, beginning on the effective date of the
                revision, with subsections (b) and (c).''.

SEC. 2108. DISPATCHABLE ENERGY SYSTEMS MARKET ACCESS.

    (a) Definitions.--Section 3 of the Federal Power Act (16 U.S.C.
796) is amended by adding at the end the following:
            ``(30) Qualifying behind-the-meter distributed energy
        system facility; qualifying BTM DES facility.--The term
        `qualifying behind-the-meter distributed energy system
        facility' or `qualifying BTM DES facility' means a facility
        that--
                    ``(A) is an energy storage system (including a
                battery energy storage system), a fuel cell system, a
                generator, or other resource--
                            ``(i) that can deliver electricity within
                        15 minutes of being called on for deployment;
                        and
                            ``(ii) the output of which can be
                        dispatched and adjusted at the signal of the
                        system operator;
                    ``(B) is located behind the meter of a retail
                customer of a distribution utility (as defined in
                section 217(a));
                    ``(C) has a rated capacity of not less than 5
                kilowatts and not more than 5 megawatts; and
                    ``(D) maintains metering and telemetry capabilities
                that--
                            ``(i) are sufficient to dispatch the
                        facility, account for withdrawals from and
                        injections to the grid, and communicate all
                        relevant operational data from the facility;
                        and
                            ``(ii) are not required to include
                        equipment owned or installed by the
                        distribution utility (as so defined), and may
                        include the use of device-level equipment,
                        including inverters.
            ``(31) Qualifying behind-the-meter distributed energy
        system aggregation; qualifying BTM DES aggregation.--The term
        `qualifying behind-the-meter distributed energy system
        aggregation' or `qualifying BTM DES aggregation' means an
        aggregation of 2 or more qualifying BTM DES facilities--
                    ``(A) with a combined capacity of not less than 100
                kilowatts; and
                    ``(B) that maintains aggregation-level metering and
                telemetry capabilities sufficient to facilitate the
                dispatch and market settlement of the aggregation.''.
    (b) Rule of Construction.--Section 201 of the Federal Power Act (16
U.S.C. 824) is amended by adding at the end the following:
    ``(h) Qualifying BTM DES Facilities and Aggregations.--The
designation of a facility as a qualifying BTM DES facility or an
aggregation of 2 or more facilities as a qualifying BTM DES aggregation
does not, of itself, subject any of the following to the jurisdiction
of the Commission:
            ``(1) The facility or aggregation.
            ``(2) The retail electric service provided to or for the
        facility or aggregation.
            ``(3) The distribution service on which the facility or
        aggregation relies.''.
    (c) Wholesale Market Access for Qualifying BTM DES Aggregations.--
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by
section 2107(b)) is amended by adding at the end the following:

``SEC. 230. WHOLESALE MARKET ACCESS FOR QUALIFYING BTM DES
              AGGREGATIONS.

    ``(a) Definitions.--In this section:
            ``(1) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(2) Double compensation.--The term `double compensation'
        means payment through or by both a wholesale market and a
        State-jurisdictional retail market or program for providing the
        same service during the same time interval.
    ``(b) Just and Reasonable Practices.--Effective on the date that is
18 months after the date of enactment of this section, it shall not be
just and reasonable within the meaning of sections 205 and 206 for any
Transmission Organization to maintain rates, terms, or conditions of
service that, by their terms and to the extent that such rates, terms,
and conditions directly affect wholesale rates, prevent the
participation of any qualifying BTM DES aggregation in wholesale
energy, capacity, or ancillary services markets administered by the
Transmission Organization.
    ``(c) Prohibited Practices.--
            ``(1) In general.--Effective on the date that is 18 months
        after the date of enactment of this section, the following
        practices shall not be considered to be just and reasonable
        within the meaning of sections 205 and 206:
                    ``(A) Imposing metering, telemetry, or equipment
                requirements that are more stringent than the
                definitions of the terms `qualifying BTM DES facility'
                and `qualifying BTM DES aggregation' in section 3.
                    ``(B) Requiring a qualifying BTM DES facility or
                qualifying BTM DES aggregation to participate in the
                energy market with compensation as a precondition to
                participating in the capacity market on equal terms,
                subject to paragraph (2).
                    ``(C) Requiring the joint participation with any
                resource co-located with a Qualifying BTM DES facility
                as a condition for inclusion in a qualifying BTM DES
                aggregation.
                    ``(D) Any other practice otherwise described in
                subsection (b).
            ``(2) Savings provision.--Nothing in this section prohibits
        a Transmission Organization from establishing performance rules
        for qualifying BTM DES aggregations that participate in
        capacity markets but not energy markets, subject to the
        condition that such rules are narrowly tailored to the purpose
        of ensuring the performance of such resources when called upon.
    ``(d) Compliance Filings.--
            ``(1) Transmission organization filings.--Not later than
        180 days after the date of enactment of this section, each
        Transmission Organization that administers a wholesale market
        subject to the jurisdiction of the Commission shall file with
        the Commission proposed rates, terms, and conditions of service
        that comply with the requirements of this section.
            ``(2) Commission action.--Not later than 180 days after the
        filing of a proposal under paragraph (1), the Commission
        shall--
                    ``(A) approve the proposal if the Commission
                determines that the proposal complies with this
                section; or
                    ``(B) require or impose such changes that are--
                            ``(i) consistent with the requirement of
                        sections 205 and 206 that all rates, charges,
                        terms, and conditions be just and reasonable
                        and not unduly discriminatory or preferential;
                        and
                            ``(ii) in compliance with this section.
    ``(e) Complaints.--
            ``(1) In general.--The Commission shall act on the merits
        of any complaint alleging noncompliance with this section not
        later than 180 days after the date on which the complaint is
        filed.
            ``(2) Consolidation.--To maximize administrative
        efficiency, the Commission may consolidate and act upon related
        complaints with respect to a given Transmission Organization.
    ``(f) Dual Participation; Prohibition on Double Compensation.--
            ``(1) Preservation of state program eligibility.--
        Participation by a qualifying BTM DES facility in a State-
        jurisdictional retail market or program shall not disqualify
        the qualifying BTM DES facility from participating in a
        wholesale market administered by a Transmission Organization,
        and nothing in this section requires a qualifying BTM DES
        facility to participate in any wholesale market.
            ``(2) Prohibition on double compensation.--No qualifying
        BTM DES facility or qualifying BTM DES aggregation shall
        receive double compensation.
            ``(3) Qualifying btm des rate filing.--
                    ``(A) In general.--Not later than 180 days after
                the date of enactment of this section, each
                Transmission Organization shall file with the
                Commission under section 205 revisions to its tariff
                establishing settlement, metering, and telemetry
                protocols that exclude from wholesale market settlement
                the quantity of energy, ancillary service, or capacity,
                evaluated on a service-by-service basis, for which a
                qualifying BTM DES facility has received or will
                receive compensation under a State-jurisdictional
                retail market or program.
                    ``(B) Electric utilities.--Each public utility that
                provides distribution service to a qualifying BTM DES
                facility shall provide to the applicable Transmission
                Organization and aggregator, in a form and on a
                schedule established by the Transmission Organization,
                the interval metering data and program-participation
                information necessary to implement subparagraph (A),
                subject to such protections for customer-specific
                information as the applicable State commission may
                require.
                    ``(C) Certification.--
                            ``(i) In general.--Each aggregator shall
                        certify to the applicable Transmission
                        Organization, on a schedule established by the
                        Commission--
                                    ``(I) each State-jurisdictional
                                retail market or program from which
                                each qualifying BTM DES facility has
                                received compensation; and
                                    ``(II) on the basis of final
                                determinations made by the Commission
                                arising from the proceedings initiated
                                under subparagraph (A), that no
                                qualifying BTM DES facility in its
                                aggregation has retained double
                                compensation during the certification
                                period.
                            ``(ii) Treatment.--A certification under
                        this subparagraph shall constitute a statement
                        made to the Commission for purposes of sections
                        316 and 316A.
            ``(4) Complaint with respect to double compensation.--
                    ``(A) In general.--Any person, electric utility,
                State, municipality, or State commission aggrieved by
                alleged double compensation may file a complaint
                pursuant to section 206.
                    ``(B) Procedure.--In a proceeding initiated
                pursuant to a complaint under subparagraph (A), if a
                qualifying BTM DES facility or qualifying BTM DES
                aggregation that is the subject of the complaint meets
                the eligibility requirements of both a wholesale market
                and a State-jurisdictional program, the complainant in
                that proceeding shall--
                            ``(i) bear the burden of proof before the
                        Commission; and
                            ``(ii) demonstrate that--
                                    ``(I) double compensation has in
                                fact occurred or is imminent; and
                                    ``(II) such double compensation
                                could not be avoided through reasonable
                                adjustments to--
                                            ``(aa) wholesale market
                                        compensation received by the
                                        applicable qualifying BTM DES
                                        facility or qualifying BTM DES
                                        aggregation; or
                                            ``(bb) the retail bill
                                        associated with the qualifying
                                        BTM DES facility or qualifying
                                        BTM DES aggregation, using
                                        metering and telemetry data
                                        that meets the requirements of
                                        the wholesale market.
                    ``(C) Limitation.--A complaint under subparagraph
                (A) shall be filed not later than 5 years after the
                date on which the alleged double compensation was
                received.
            ``(5) Wholesale market compensation adjustment.--If the
        Commission determines that double compensation could be avoided
        through an adjustment to a rate, term, or condition of service
        under the jurisdiction of the Commission pursuant to section
        205, the Commission may initiate a proceeding consistent with
        section 206 to eliminate double compensation.
            ``(6) Disgorgement; penalties.--
                    ``(A) Disgorgement.--If the Commission finds that
                double compensation has occurred, the Commission shall
                order disgorgement of the full amount of the double
                compensation received.
                    ``(B) Penalties.--If the Commission determines that
                double compensation has been knowingly retained, the
                Commission may order penalties, which may include--
                            ``(i) monetary penalties of up to 3 times
                        the amount of the double compensation received,
                        without regard to the limitations described in
                        section 206(b); and
                            ``(ii) suspension or termination of the
                        participation of a qualifying BTM DES facility,
                        qualifying BTM DES aggregation, or aggregator
                        in a wholesale market administered by a
                        Transmission Organization.
    ``(g) Annual Reporting.--Each qualifying BTM DES facility and
qualifying BTM DES aggregation participating in a wholesale market
under this section shall submit to the Commission, not later than March
30 of each year, a public report that summarizes and quantifies all
services provided by the qualifying BTM DES facility or qualifying BTM
DES aggregation during the preceding calendar year to--
            ``(1) wholesale markets subject to the jurisdiction of the
        Commission; and
            ``(2) State-jurisdictional retail markets and programs
        within regions subject to the jurisdiction of the
        Commission.''.
    (d) Distribution Utility Interconnection and Non-Interference.--
Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as amended by
subsection (c)) is amended by adding at the end the following:

``SEC. 231. DISTRIBUTION UTILITY OBLIGATIONS WITH RESPECT TO QUALIFYING
              BTM DES FACILITIES AND QUALIFYING BTM DES AGGREGATIONS.

    ``(a) Definitions.--In this section:
            ``(1) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(2) Distribution utility; load-serving entity.--The terms
        `distribution utility' and `load-serving entity' have the
        meanings given those terms in section 217(a).
    ``(b) Interconnection Obligation.--
            ``(1) In general.--Except as otherwise provided by State
        law or by the State regulatory authority with jurisdiction over
        the distribution utility, any distribution utility located
        within the geographic footprint of an organized wholesale
        market administered by a Transmission Organization shall
        interconnect any behind-the-meter resource that is eligible to
        participate in that wholesale market, including any qualifying
        BTM DES facility or qualifying BTM DES aggregation, in a timely
        fashion and with rates, terms, and conditions of service that--
                    ``(A) allow the behind-the-meter resource to export
                energy to the grid, if applicable; and
                    ``(B) do not prevent, impede, or unreasonably
                condition the participation of the behind-the-meter
                resource in the wholesale market.
            ``(2) Savings provision.--Nothing in this subsection
        authorizes the Commission to prescribe the rates, terms, or
        conditions of distribution-level interconnection service.
    ``(c) Acceptance of Wholesale Market Metering Data.--
            ``(1) In general.--Any distribution utility or load-serving
        entity providing retail electric service to a customer at whose
        premises a qualifying BTM DES facility or qualifying BTM DES
        aggregation is located shall accept the same metering and
        telemetry data used by the wholesale market for purposes of
        market participation by that qualifying BTM DES facility or
        qualifying BTM DES aggregation.
            ``(2) Requirement.--The manner in which the data described
        in paragraph (1) is used to adjust the retail bill of a
        customer, including any adjustment to account for energy
        exported or withdrawn, shall be determined by the State
        regulatory authority having jurisdiction over retail rates.
    ``(d) Savings Provision.--Nothing in this section limits a
distribution utility from taking actions reasonably necessary to
maintain the safety, reliability, or operations of the distribution
system.
    ``(e) Commission Enforcement.--
            ``(1) In general.--The Commission shall have authority to
        enforce the provisions of this section, and any person may file
        with the Commission a complaint alleging a violation of this
        section.
            ``(2) Requirement.--The Commission shall act on the merits
        of any complaint filed under paragraph (1) not later than 180
        days after the date on which the complaint is filed.
    ``(f) Applicability to Public Power and Certain Cooperatives.--
Except to the extent that compliance is required under State law, the
requirements of subsections (b) and (c) shall be voluntary with respect
to distribution utilities that are entities described in section
201(f).''.
    (e) Establishment of Program To Facilitate Voluntary Streamlined
Process for Local Permitting of Qualifying Distributed Energy
Systems.--
            (1) Definitions.--In this subsection:
                    (A) Authority having jurisdiction.--The term
                ``authority having jurisdiction'' means any State,
                county, local, or Tribal office or official with
                jurisdiction--
                            (i) to issue permits relating to qualifying
                        distributed energy systems;
                            (ii) to conduct inspections to enforce the
                        requirements of a relevant code or standard
                        relating to qualifying distributed energy
                        systems; or
                            (iii) to approve the installation of, or
                        the equipment and materials used in the
                        installation of, qualifying distributed energy
                        systems.
                    (B) Qualifying distributed energy system.--The term
                ``qualifying distributed energy system'' means any
                equipment or materials installed in, on, or near a
                building or premises to support onsite or local energy
                use, the primary function of which is--
                            (i) to generate electricity from
                        distributed renewable energy sources, including
                        solar photovoltaic systems or similar solar
                        energy technologies;
                            (ii) to store and discharge electricity
                        from batteries with a capacity of at least 2
                        kilowatt hours;
                            (iii) to charge a plug-in electric drive
                        vehicle at a power rate of at least 2
                        kilowatts; or
                            (iv) to refuel a hydrogen fuel cell
                        electric vehicle.
                    (C) Secretary.--The term ``Secretary'' means the
                Secretary of Energy.
            (2) Program.--Not later than 180 days after the date of
        enactment of this Act, the Secretary, in consultation with
        trade associations and other entities representing distributed
        energy system installers, organizations representing State,
        local, and Tribal governments engaged in permitting, and other
        interested stakeholders, shall carry out a program to further
        develop, expand, and support the adoption of a voluntary
        streamlined permitting and inspection process for authorities
        having jurisdiction to use for the permitting of qualifying
        distributed energy systems.
            (3) Activities of the program.--In carrying out the program
        established under paragraph (2), the Secretary shall--
                    (A) further develop and expand an exemplary
                streamlined permitting process that includes an online
                permitting platform--
                            (i) for expediting, standardizing, and
                        streamlining permitting; and
                            (ii) that authorities having jurisdiction
                        may voluntarily use to receive, review, and
                        approve permit applications relating to
                        qualifying distributed energy systems;
                    (B) establish targets for the adoption of a
                streamlined, expedited permitting process by
                authorities having jurisdiction;
                    (C) provide technical assistance and training
                directly or indirectly to authorities having
                jurisdiction on using and adopting the exemplary
                streamlined permitting process described in
                subparagraph (A), including the adoption of any
                necessary building codes;
                    (D) develop a voluntary inspection protocol and
                related tools to expedite, standardize, and streamline
                the inspection of qualifying distributed energy
                systems, including--
                            (i) by investigating the potential for
                        using remote inspections;
                            (ii) by investigating the potential for
                        sample-based inspection for distributed energy
                        system installers with a demonstrated track
                        record of high-quality work; and
                            (iii) by investigating opportunities to
                        integrate the voluntary inspection protocol
                        into the online permitting platform described
                        in subparagraph (A) and the platforms of
                        government software providers; and
                    (E) take any other action to expedite, standardize,
                streamline, or improve the process for permitting,
                inspecting, or interconnecting qualifying distributed
                energy systems.
            (4) Support services.--The Secretary shall--
                    (A) support the provision of technical assistance
                to authorities having jurisdiction, any administrator
                of the online permitting platform described in
                paragraph (3)(A), government software providers, and
                any other entity determined appropriate by the
                Secretary in carrying out the activities described in
                paragraph (3); and
                    (B) provide such financial assistance as the
                Secretary determines appropriate from any funds
                appropriated to carry out this subsection.
            (5) Authority having jurisdiction certification program.--
                    (A) In general.--The Secretary may certify
                authorities having jurisdiction that implement the
                exemplary streamlined permitting process described in
                paragraph (3)(A).
                    (B) Process.--The Secretary may confer a
                certification under subparagraph (A) through existing
                programs within the Department of Energy.
                    (C) Prizes.--The Secretary may award prizes to
                authorities having jurisdiction, using funds
                appropriated to the Secretary to carry out this
                subsection, to encourage authorities having
                jurisdiction to adopt the exemplary streamlined
                permitting process or the voluntary inspection protocol
                established under subparagraphs (A) and (D) of
                paragraph (3), respectively.
            (6) Authorization of appropriations.--There is authorized
        to be appropriated to the Secretary to carry out this
        subsection $20,000,000 for each of fiscal years 2026 through
        2031.

SEC. 2109. GRID-ENHANCING ADVANCED TRANSMISSION TECHNOLOGIES.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as
amended by section 2108(d)) is amended by adding at the end the
following:

``SEC. 232. USE OF GRID-ENHANCING ADVANCED TRANSMISSION TECHNOLOGIES.

    ``(a) Definitions.--In this section:
            ``(1) Best-available class of transmission conductor.--The
        term `best-available class of transmission conductor' means a
        class of high-performance transmission conductors that, as
        determined by the Commission--
                    ``(A) provides the greatest feasible and
                commercially available energy-carrying capacity at a
                given voltage level;
                    ``(B) provides the highest feasible and
                commercially available electrical efficiency at that
                voltage level;
                    ``(C) provides the greatest feasible and
                commercially available level of mechanical performance,
                taking into account relevant factors, including
                reliability, safety, and affordability; and
                    ``(D) provides an economically reasonable
                alternative to a transmission conductor that is not a
                high-performance transmission conductor.
            ``(2) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(3) Covered project.--The term `covered project' means
        the construction of a new, or the modification, upgrade,
        replacement, or reconductoring of an existing, transmission
        facility subject to the jurisdiction of the Commission under
        section 201(b).
            ``(4) Grid-enhancing advanced transmission technology.--The
        term `grid-enhancing advanced transmission technology' means--
                    ``(A) dynamic line rating;
                    ``(B) advanced power flow control;
                    ``(C) transmission topology optimization; and
                    ``(D) high-performance transmission conductors.
    ``(b) Use of Grid-Enhancing Advanced Transmission Technologies.--In
exercising its authority under sections 205 and 206, the Commission
shall require that public utilities--
            ``(1) evaluate their transmission systems to assess all
        technically achievable opportunities to deploy grid-enhancing
        advanced transmission technologies, including the costs and
        benefits of such deployment; and
            ``(2) when carrying out covered projects, use grid-
        enhancing advanced transmission technologies, including
        transmission conductors in the best-available class of
        transmission conductors, whenever the benefits of doing so
        would exceed the costs.
    ``(c) Presumption of Prudence for Grid-Enhancing Advanced
Transmission Technologies.--In any filing seeking to recover the cost
of a grid-enhancing advanced transmission technology for a covered
project, and in any proceeding to determine whether that cost may be
recovered through rates, the Commission shall presume that--
            ``(1) the use of a grid-enhancing advanced transmission
        technology is a prudent practice;
            ``(2) the costs associated with the use of a grid-enhancing
        advanced transmission technology are just and reasonable; and
            ``(3) the costs associated with the use of a grid-enhancing
        advanced transmission technology provide an economically
        reasonable alternative to the use of transmission technologies
        that are not grid-enhancing advanced transmission technologies.
    ``(d) Applicability.--The requirements of this section apply only
to public utilities and only with respect to covered projects.
    ``(e) Rulemaking.--
            ``(1) In general.--Not later than 1 year after the date of
        enactment of this section, the Commission shall issue an order
        or rule to implement this section.
            ``(2) Requirements.--In issuing an order or rule under
        paragraph (1), the Commission shall--
                    ``(A) require that each public utility conducts, on
                Commission-established timelines, a recurring
                evaluation of the transmission systems of the public
                utility--
                            ``(i) to determine when the benefits
                        associated with deploying grid-enhancing
                        advanced transmission technologies through
                        covered projects, including benefits to the
                        current transmission system of the public
                        utility, outweigh the costs (such that the
                        applicable benefit-cost ratio is greater than
                        1);
                            ``(ii) that evaluates whether the costs for
                        which recovery is sought achieve the highest
                        net benefit at least cost for the applicable
                        covered projects; and
                            ``(iii) that considers planning and
                        construction timelines and outages for new
                        transmission assets and risks and impacts of
                        potential delays;
                    ``(B) require that, for any covered project for
                which the benefits of deploying a grid-enhancing
                advanced transmission technology outweigh the costs
                (such that the applicable benefit-cost ratio is greater
                than 1), the applicable public utility shall deploy the
                grid-enhancing advanced transmission technology based
                on general schedules for deployment, as determined by
                the Commission;
                    ``(C) require that decisions on whether to
                implement grid-enhancing advanced transmission
                technologies based on the recurring evaluations under
                subparagraph (A) are reported to the Commission, in a
                manner determined by the Commission;
                    ``(D) in consultation with the Secretary of Energy,
                establish a methodology for determining whether a
                transmission conductor is in the best-available class
                of transmission conductors for purposes of this
                section;
                    ``(E) provide for periodic review and updating of
                the methodology established under subparagraph (D) not
                less frequently than annually to reflect improvements
                in technology, materials, and system performance; and
                    ``(F) determine a penalty for any public utility
                that fails to deploy the relevant grid-enhancing
                advanced transmission technologies when the applicable
                benefit-cost ratio is greater than 1 in a timeframe
                determined by the Commission, including a reduction of
                the effective return on equity for the transmission
                system of the public utility.''.

SEC. 2110. EXPEDITING GENERATOR INTERCONNECTION QUEUES.

    (a) In General.--Not later than 1 year after the date of enactment
of this Act, the Federal Energy Regulatory Commission shall initiate a
rulemaking to revise the pro forma Large Generator Interconnection
Procedures promulgated pursuant to section 35.28(f) of title 18, Code
of Federal Regulations (or a successor regulation), to require public
utility transmission providers to share and employ, as appropriate,
queue management practices with respect to the use of computing
technologies, including artificial intelligence, machine learning, and
automation, in evaluating and processing interconnection requests, in
order to expedite study results with respect to those requests.
    (b) Requirement.--The Federal Energy Regulatory Commission shall
initiate and finalize a rulemaking pursuant to subsection (a) not less
frequently than once every 4 years to determine whether additional
steps are required to ensure that public utility transmission providers
are adequately deploying advanced computing technologies.

SEC. 2111. GRID DATA ACCESS.

    (a) In General.--Part II of the Federal Power Act (16 U.S.C. 824 et
seq.) (as amended by section 2109) is amended by adding at the end the
following:

``SEC. 233. GRID DATA ACCESS.

    ``(a) Definitions.--In this section:
            ``(1) Bulk-power system.--The term `bulk-power system' has
        the meaning given the term in section 215(a).
            ``(2) Commission.--The term `Commission' means the Federal
        Energy Regulatory Commission.
            ``(3) Covered study.--The term `covered study' includes--
                    ``(A) a generation or load interconnection study,
                facilities study, feasibility study, or affected-system
                study required under a tariff on file with the
                Commission; and
                    ``(B) a study or analysis under section 224, 225,
                226, 228, 229, or 232.
            ``(4) Grid data.--
                    ``(A) In general.--The term `grid data' means data,
                in any format, reasonably necessary for a covered
                study, including models, assumptions, forecasts,
                facility data, operating data, and other study inputs.
                    ``(B) Inclusions.--The term `grid data' includes
                any data category identified by the Commission, in
                consultation with the Secretary of Energy, the Electric
                Reliability Organization (as defined in section
                215(a)), transmission providers, National Laboratories
                (as defined in section 2 of the Energy Policy Act of
                2005 (42 U.S.C. 15801)), and entities with automated
                grid-study software experience, for purposes of this
                section.
            ``(5) Transmission provider.--
                    ``(A) In general.--The term `transmission provider'
                means--
                            ``(i) a public utility, Regional
                        Transmission Organization, Independent System
                        Operator, or other entity administering an open
                        access transmission tariff; or
                            ``(ii) for purposes of paragraphs (2) and
                        (3) of subsection (b), an entity legally
                        responsible for a covered study.
                    ``(B) Exclusion.--The term `transmission provider'
                does not include an exempt transmitting utility (as
                defined in section 225(a)) that does not voluntarily
                subject itself to Commission jurisdiction for the
                purposes of this section.
    ``(b) Grid Data Duties.--
            ``(1) Data sufficiency.--Each transmission provider shall
        obtain, assemble, and maintain the grid data regarding its
        transmission system that is necessary for the transmission
        provider to conduct covered studies.
            ``(2) Representative or tool.--A transmission provider may
        designate a person or tool assisting the transmission provider
        in a covered study as its representative for the purpose of
        making any requests in accordance with paragraph (3), subject
        to paragraph (6).
            ``(3) Data requests.--
                    ``(A) In general.--A transmission provider may
                request the grid data necessary to complete a covered
                study from any relevant user, owner, or operator of the
                bulk-power system that possesses or controls such data.
                    ``(B) Requirement.--Subject to subparagraph (C),
                any person from whom grid data is requested under
                subparagraph (A) shall provide requested grid data not
                later than 15 days after receiving the request.
                    ``(C) Alternative timeline.--The Commission may
                establish, by data category, alternative timelines for
                providing grid data in response to a request under
                subparagraph (A).
            ``(4) Data interoperability.--Grid data maintained pursuant
        to paragraph (1) and provided pursuant to paragraph (3) shall
        be provided in a format that is usable or convertible by the
        requesting party with no impact on the scope or level of
        granularity in which the data is maintained or used, including
        by direct data transfer, application programming interface
        access, or secure compute-over-data access.
            ``(5) Data currency.--Each person providing grid data under
        paragraph (3) shall--
                    ``(A) provide accurate, complete, and current grid
                data; and
                    ``(B) report, on Commission-established timelines,
                any material changes needed to maintain the accuracy of
                the grid data or any related models or studies,
                including covered studies.
            ``(6) Data safeguards.--
                    ``(A) In general.--Grid data under this section
                shall be handled under applicable law and Commission-
                approved confidentiality and data security
                requirements.
                    ``(B) Manner of access.--The requirements described
                in subparagraph (A) may govern the manner of access to
                grid data, but may not be used to withhold grid data if
                access can be provided consistent with those
                requirements.
            ``(7) Cost recovery.--A public utility or transmission
        provider may file rates, charges, or tariffs pursuant to
        section 205 to recover the costs of complying with this
        section.
    ``(c) Enforcement.--
            ``(1) Reliability and penalties.--Failure to comply with
        the duties under subsection (b) shall be subject to civil
        penalties as specified in section 316A.
            ``(2) Compliance orders.--The Commission may, by order,
        require compliance with this section by any person required to
        provide or make available grid data under this section.
            ``(3) Expedited complaint.--Not later than 60 days after a
        complaint alleging a violation of this section is filed, the
        Commission shall, if the Commission determines that a violation
        has occurred, issue an order requiring compliance, including
        interim relief needed to prevent unreasonable delay in a
        covered study.
    ``(d) Implementation.--
            ``(1) In general.--The Commission may issue such rules or
        orders, including pursuant to section 206, as are necessary to
        carry out this section.
            ``(2) Requirement.--The Commission shall issue at least 1
        rule or order described in paragraph (1) not later than 1 year
        after the date of enactment of this section.''.
    (b) Automated Study Reference Specification.--
            (1) Publication.--Not later than 1 year after the date of
        enactment of this Act, the Federal Energy Regulatory Commission
        and the Secretary of Energy, in consultation with the Electric
        Reliability Organization (as defined in section 215(a) of the
        Federal Power Act (16 U.S.C. 824o(a))), transmission providers
        (as defined in section 233(a) of that Act), National
        Laboratories (as defined in section 2 of the Energy Policy Act
        of 2005 (42 U.S.C. 15801)), and entities with automated grid-
        study software experience, shall publish a reference
        specification identifying the data categories, formats or
        conversion standards, update frequencies, and validation
        standards needed to enable full automation of interconnection
        studies, including system impact studies, without supplemental
        data requests during the study.
            (2) Effect.--This section, including the pendency of
        publication of the reference specification described in
        paragraph (1), shall not delay, limit, or narrow the
        application of section 233 of the Federal Power Act.
            (3) Updates.--The Federal Energy Regulatory Commission may
        update the reference specification published under paragraph
        (1) through a noticed proceeding not more frequently than once
        every 3 years.

SEC. 2112. POWER MARKETING ADMINISTRATIONS.

    Part II of the Federal Power Act (16 U.S.C. 824 et seq.) (as
amended by section 2111(a)) is amended by adding at the end the
following:

``SEC. 234. COMPENSATION FLEXIBILITY TO ADDRESS RETENTION AND HIRING
              ISSUES AT THE FEDERAL POWER MARKETING ADMINISTRATIONS.

    ``(a) Employee Compensation Program.--
            ``(1) In general.--Except as otherwise provided in this
        section, the Administrator of each Federal power marketing
        administration (referred to in this section as an
        `Administrator') shall develop, implement, and, as appropriate,
        update, based on the results of an annual review under
        paragraph (4), a compensation plan that specifies and fixes the
        compensation (including salary or any other pay, bonuses,
        benefits, incentives, and any other form of remuneration) for
        employees of the Federal power marketing administration,
        including members of the Senior Executive Service (as defined
        in section 2101a of title 5, United States Code).
            ``(2) Initial compensation plan.--
                    ``(A) In general.--Not later than 1 year after the
                date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, each Administrator
                shall, in consultation with the Director of the Office
                of Personnel Management, and subject to confirmation
                and approval by the Secretary of Energy, which shall
                not be unreasonably withheld, develop an initial
                compensation plan under paragraph (1).
                    ``(B) Implementation.--Not later than 1 year after
                the date on which the initial compensation plan is
                developed under subparagraph (A), each Administrator
                shall implement the initial compensation plan.
            ``(3) Requirements.--A compensation plan developed under
        paragraph (1) shall--
                    ``(A) be based on an annual survey of the
                prevailing compensation for similar positions in the
                electric industry in the locality in which the Federal
                power marketing administration is located;
                    ``(B) be consistent with the approved annual
                general and administrative budget of the applicable
                Federal power marketing administration and encourage
                the widest diversified use of electric power at the
                lowest possible rates to consumers consistent with
                sound business principles;
                    ``(C) provide that education, experience, level of
                responsibility, geographic differences, and retention
                and recruitment needs are to be taken into account in
                determining the compensation of employees of the
                applicable Federal power marketing administration; and
                    ``(D) provide that the individual total
                compensation of the applicable Administrator and any
                employee of the applicable Federal power marketing
                administration shall be comparable to and competitive
                with similar positions among utilities in--
                            ``(i) the Western Interconnection, if the
                        Federal power marketing administration is
                        located in the Western Interconnection; or
                            ``(ii) the Eastern Interconnection, if the
                        Federal power marketing administration is
                        located in the Eastern Interconnection.
            ``(4) Annual review.--
                    ``(A) In general.--Annually, each Administrator
                shall review and update, as appropriate, the
                compensation plan developed under paragraph (1).
                    ``(B) Compensation of administrators.--
                Notwithstanding any other law, rule, regulation, or
                directive relating to the payment of an Administrator
                (other than chapter 83 of title 5, United States Code),
                the Secretary of Energy shall periodically review and
                update, as appropriate, the compensation of each
                Administrator consistent with paragraph (3)(D).
                    ``(C) Publication of information.--Each
                Administrator shall include in the quarterly public
                business review of the Administrator or any other
                appropriate public review of the operations and
                finances of the applicable Federal power marketing
                administration information on the applicable annual
                compensation plan review under subparagraph (A),
                including information on the amount of salaries of any
                employees whose annual salaries would exceed the annual
                rate payable for positions at Level IV of the Executive
                Schedule under section 5315 of title 5, United States
                Code.
            ``(5) Annual publication.--Annually, each Administrator
        shall publish the compensation plan developed under paragraph
        (1) or updated under paragraph (4), as applicable.
    ``(b) Appointment; Employment.--
            ``(1) In general.--An Administrator may, as the
        Administrator determines to be necessary to carry out the
        functions of the Administrator under applicable law, subject to
        applicable civil service laws--
                    ``(A) appoint any officers and employees;
                    ``(B) employ laborers, mechanics, and workers for
                construction work or the operation and maintenance of
                electrical facilities; and
                    ``(C) fix the compensation of individuals appointed
                under subparagraph (A) or (B), respectively, consistent
                with the applicable compensation plan developed under
                subsection (a)(1).
            ``(2) Exemption from certain civil service laws.--Except as
        otherwise provided in this section, in carrying out the
        authority provided by paragraph (1), an Administrator shall be
        exempt from chapters 34, 43, 51, 53, 57, and 59 of title 5,
        United States Code.
            ``(3) Application of merit system principles.--Employees of
        a Federal power marketing administration are subject to the
        application of the merit system principles set forth in section
        2301 of title 5, United States Code, to the extent that the
        principles apply to a wholly owned Government corporation.
            ``(4) Employment of physicians.--An Administrator may
        employ physicians, without regard to the civil service laws
        (including regulations), to perform physical examinations of
        employees or prospective employees of the applicable Federal
        power marketing administration who are or may become laborers,
        mechanics, and workers described in paragraph (1)(B).
            ``(5) Employment of experts.--An Administrator may appoint,
        without regard to the civil service laws (including
        regulations), any experts that the Administrator determines to
        be necessary to carry out the functions of the Administrator
        under applicable law.
    ``(c) Exceptions.--Nothing in this section shall be interpreted or
construed to conflict with section 9(b) of Public Law 92-392 (5 U.S.C.
5343 note) or section 704 of the Civil Service Reform Act of 1978 (5
U.S.C. 5343 note; Public Law 95-454), which remain in full force and
effect. This section shall not apply to any employee of a Federal power
marketing administration whose position, prior to March 27, 2025, was
governed by a collective bargaining agreement that is subject to
section 9(b) of Public Law 92-392 (5 U.S.C. 5343 note) or section 704
of the Civil Service Reform Act of 1978 (5 U.S.C. 5343 note; Public Law
95-454).
    ``(d) Restoration of Bargaining Rights.--The provisions of chapter
71 of title 5, United States Code, shall apply to all employees of any
Federal power marketing administration in the same manner that those
provisions applied on March 26, 2025, notwithstanding any intervening
law, rule, or order to the contrary. Any collective bargaining
agreement in effect as of March 26, 2025, applicable to the employees
of any Federal power marketing administration shall have full force and
effect through the stated term of the applicable agreement.''.

SEC. 2113. FERC FEE ASSESSMENTS.

    Part III of the Federal Power Act is amended by inserting after
section 317 (16 U.S.C. 825p) the following:

``SEC. 318. PERIODIC REVIEW OF FEES AND CHARGES.

    ``Not less frequently than once every 5 years, the Federal Energy
Regulatory Commission (referred to in this section as the `Commission')
shall--
            ``(1) undertake a review to determine whether the fees and
        charges the Commission assesses under this Act and other laws,
        including section 3401 of the Omnibus Budget Reconciliation Act
        of 1986 (42 U.S.C. 7178), are sufficient to allow the
        Commission to handle its workload in an expedient manner; and
            ``(2) submit to the Committee on Energy and Natural
        Resources of the Senate, the Committee on Energy and Commerce
        of the House of Representatives, the Committee on
        Appropriations of the Senate, and the Committee on
        Appropriations of the House of Representatives a report
        describing that review and the results of that review.''.

SEC. 2114. COLLECTION OF DATA ON COMPUTATIONAL LOAD ENTITIES.

    (a) Definition of Computational Load Site.--
            (1) In general.--In this section, the term ``computational
        load site'' means 1 or more buildings, structures, or
        installations at a single location that primarily contain
        information technology infrastructure used for--
                    (A) creating, executing, and delivering software
                applications and services;
                    (B) artificial intelligence training, deployment,
                and delivery;
                    (C) cryptocurrency mining; or
                    (D) other computational activities at a data
                center.
            (2) Exclusion.--In this section, the term ``computational
        load site'' does not include computing or data storage
        equipment that is ancillary to a facility the primary purpose
        of which is a commercial or industrial activity other than an
        activity described in paragraph (1).
    (b) Data Collection.--Not later than 90 days before the first April
1 after the date of enactment of this Act, the Administrator of the
Energy Information Administration shall revise Form 861 (or any
successor form) of the Energy Information Administration to separately
include information from computational load sites.

SEC. 2115. DE NOVO REVIEW OF CIVIL PENALTIES UNDER THE NATURAL GAS ACT.

    Section 22(b) of the Natural Gas Act (15 U.S.C. 717t-1(b)) is
amended by inserting ``, in accordance with the same procedures as are
applicable under section 31(d) of the Federal Power Act (16 U.S.C.
823b(d)) in the case of civil penalties assessed under section 31 of
that Act (16 U.S.C. 823b)'' before the period at the end.

SEC. 2116. TRANSMISSION ORGANIZATION GOVERNANCE.

    (a) Section 205.--Section 205 of the Federal Power Act (16 U.S.C.
824d) is amended by adding at the end the following:
    ``(h) Clarification.--For purposes of this section, the Commission
has jurisdiction over the corporate governance of a Transmission
Organization.''.
    (b) Section 206.--Section 206 of the Federal Power Act (16 U.S.C.
824e) is amended by adding at the end the following:
    ``(f) Clarification.--For purposes of this section, the Commission
has jurisdiction over the corporate governance of a Transmission
Organization.''.

SEC. 2117. DATA CENTER COMMUNITY ASSISTANCE PROGRAM.

    (a) Definitions.--In this section:
            (1) Computational load site.--
                    (A) In general.--The term ``computational load
                site'' means 1 or more buildings, structures, or
                installations at a single location that primarily
                contain information technology infrastructure used
                for--
                            (i) creating, executing, and delivering
                        software applications and services;
                            (ii) artificial intelligence training,
                        deployment, and delivery;
                            (iii) cryptocurrency mining; or
                            (iv) other computational activities at a
                        data center.
                    (B) Exclusion.--The term ``computational load
                site'' does not include computing or data storage
                equipment that is ancillary to a facility the primary
                purpose of which is a commercial or industrial activity
                other than an activity described in subparagraph (A).
            (2) Program.--The term ``program'' means the Data Center
        Community Assistance Program established under subsection
        (b)(1).
            (3) Secretary.--The term ``Secretary'' means the Secretary
        of Energy.
    (b) Data Center Community Assistance Program.--
            (1) In general.--Not later than 180 days after the date of
        enactment of this Act, the Secretary shall establish a program,
        to be known as the ``Data Center Community Assistance
        Program'', under which the Secretary shall provide State,
        local, and Tribal governments, on request, with objective and
        technically sound information, resources, and technical
        assistance regarding the potential energy, water,
        infrastructure, economic, and other community impacts
        associated with computational load site development.
            (2) Community technical assistance.--Assistance by the
        Secretary under the program may include providing information
        and analysis relating to--
                    (A) projected electricity demand, including peak
                and annual demand;
                    (B) existing electric generation, transmission, and
                distribution capacity and any additional infrastructure
                needed to serve the computational load site;
                    (C) anticipated costs of electric infrastructure
                upgrades, including which persons are expected to pay
                those costs, and potential impacts on other ratepayers;
                    (D) projected water withdrawals and consumption,
                including average and peak water use;
                    (E) proposed water sources and the relationship
                between projected use and available local water
                supplies;
                    (F) proposed cooling technologies and associated
                energy and water requirements, including potential
                alternative technologies;
                    (G) backup and onsite generation, including
                capacity, fuel source, and anticipated use;
                    (H) expected economic impacts, including
                construction jobs, permanent jobs, and other employment
                effects;
                    (I) anticipated State and local tax revenues and
                any tax abatements, credits, grants, infrastructure
                assistance, or other public incentives;
                    (J) suggested information for communities to
                request from computational load site developers,
                electric utilities, water utilities, and other relevant
                entities;
                    (K) information and examples from similarly
                situated communities, including agreements,
                infrastructure arrangements, resource-use practices,
                and other approaches to computational load site
                development; and
                    (L) other relevant information relating to the
                potential energy, water, infrastructure, and economic
                impacts of computational load site development.
    (c) Data Center Community Toolkit.--
            (1) In general.--Not later than 180 days after the date of
        enactment of this Act, the Secretary shall develop a Data
        Center Community Toolkit, which shall be publicly accessible
        and specifically written for nontechnical local officials in
        plain English.
            (2) Contents.--The Data Center Community Toolkit developed
        under paragraph (1) shall include--
                    (A) model questions to ask computational load site
                developers and utilities, including questions relating
                to infrastructure costs;
                    (B) explanations or definitions, as applicable, of
                the terms ``megawatt'', ``megawatt-hours'', ``power
                usage effectiveness'', and ``water usage
                effectiveness'';
                    (C) examples of cooling systems;
                    (D) explanations of utility rate structures;
                    (E) case studies from other communities relating to
                computational load site development; and
                    (F) a guide to potential benefits and tradeoffs of
                hosting a computational load site.
    (d) Independent Project Analysis.--
            (1) In general.--At the request of a State, local, or
        Tribal government, the Secretary may--
                    (A) request the applicable computational load site
                developer to voluntarily provide to the Secretary
                information, data, analyses, models, assumptions,
                estimates, projections, and other materials relating to
                the proposed computational load site; and
                    (B) independently assess that information and those
                materials, including by evaluating--
                            (i) the reasonableness of the assumptions
                        and methodologies used;
                            (ii) the reliability of the data;
                            (iii) whether estimates and projections are
                        adequately supported by the information
                        provided; and
                            (iv) the technical reasonableness of the
                        conclusions reached.
            (2) Timeliness.--The Secretary shall make every reasonable
        effort to provide information and analysis under paragraph
        (1)(B) in a timely manner, taking into consideration the
        timeline of the applicable State, local, or Tribal government
        for consideration of the proposed computational load site.
    (e) Neutrality.--In carrying out activities under this section, the
Secretary--
            (1) shall clearly identify material assumptions,
        limitations, and uncertainties associated with any analysis
        provided; and
            (2) shall not make any recommendation to a State, local, or
        Tribal government regarding whether any particular
        computational load site should be approved, rejected,
        permitted, or otherwise authorized.
    (f) Rules of Construction.--Nothing in this Act--
            (1) authorizes the Secretary to approve, disapprove,
        condition, delay, or otherwise participate in a State, local,
        or Tribal decision regarding the siting or development of a
        computational load site; or
            (2) limits the authority of the Secretary under any other
        provision of law to provide financial assistance, including
        grants, loans, loan guarantees, or other assistance, for a
        project or to an entity associated with a computational load
        site.

SEC. 2118. CONFORMING AMENDMENTS; SAVINGS PROVISION.

    (a) Conforming Amendments.--Section 201 of the Federal Power Act
(16 U.S.C. 824) is amended--
            (1) in subsection (b)(2)--
                    (A) in the first sentence, by striking ``and 222''
                and inserting ``222, 225, 226, 226A, 227, 228, 229,
                230, 231, 232, 233, and 234''; and
                    (B) in the second sentence, by striking ``or 222''
                and inserting ``222, 225, 226, 226A, 227, 228, 229,
                230, 231, 232, 233, or 234''; and
            (2) in subsection (e)--
                    (A) by striking ``206(f),''; and
                    (B) by striking ``or 222'' and inserting ``222,
                225, 226, 226A, 227, 228, 229, 230, 231, 232, 233, or
                234''.
    (b) Savings Provision.--Nothing in this title or an amendment made
by this title grants authority to the Federal Energy Regulatory
Commission under the Federal Power Act (16 U.S.C. 791a et seq.) over
sales of electric energy at retail or the local distribution of
electricity.

                      TITLE II--ENERGY PERMITTING

                    Subtitle A--Accelerating Claims

SEC. 2201. ACCELERATING CLAIMS.

    (a) Definitions.--In this section:
            (1) Authorization.--
                    (A) In general.--The term ``authorization'' means
                any lease, right-of-way, easement, permit, approval,
                order, finding, determination, or other administrative
                decision that is required or authorized under Federal
                law (including regulations) to design, plan, site,
                construct, reconstruct, or commence operations of a
                project, including any determination by a Federal
                department or agency that additional authorizations are
                not necessary.
                    (B) Inclusions.--The term ``authorization''
                includes--
                            (i) agency approvals of lease sales,
                        permits, rights-of-way, or plans required to
                        explore for, develop, or produce energy or
                        minerals under--
                                    (I) the Mineral Leasing Act (30
                                U.S.C. 181 et seq.);
                                    (II) the Act of August 7, 1947
                                (commonly known as the ``Mineral
                                Leasing Act for Acquired Lands'') (30
                                U.S.C. 351 et seq.);
                                    (III) the Act of July 31, 1947
                                (commonly known as the ``Materials Act
                                of 1947'') (61 Stat. 681, chapter 406;
                                30 U.S.C. 601 et seq.);
                                    (IV) sections 2319 through 2344 of
                                the Revised Statutes (commonly known as
                                the ``Mining Law of 1872'') (30 U.S.C.
                                22 et seq.);
                                    (V) the Outer Continental Shelf
                                Lands Act (43 U.S.C. 1331 et seq.);
                                    (VI) the Geothermal Steam Act of
                                1970 (30 U.S.C. 1001 et seq.);
                                    (VII) title V of the Federal Land
                                Policy and Management Act of 1976 (43
                                U.S.C. 1761 et seq.); or
                                    (VIII) title I of the Naval
                                Petroleum Reserves Production Act (42
                                U.S.C. 6501 et seq.);
                            (ii) statements or permits for a project
                        under sections 7 and 10 of the Endangered
                        Species Act of 1973 (16 U.S.C. 1536, 1539); and
                            (iii) agency approvals under the Healthy
                        Forests Restoration Act of 2003 (16 U.S.C. 6501
                        et seq.) of hazardous fuel reduction and forest
                        restoration projects.
            (2) Environmental document.--The term ``environmental
        document'' includes any of the following, as prepared under the
        National Environmental Policy Act of 1969 (42 U.S.C. 4321 et
        seq.):
                    (A) An environmental assessment.
                    (B) A finding of no significant impact.
                    (C) An environmental impact statement.
            (3) Project.--The term ``project'' means a project--
                    (A) proposed for--
                            (i) the construction or operation of
                        infrastructure--
                                    (I) to develop, produce, generate,
                                store, transport, or distribute energy;
                                    (II) to capture, remove, transport,
                                or store carbon dioxide; or
                                    (III) to mine, extract,
                                beneficiate, or process minerals; or
                            (ii) hazardous fuel reduction and forest
                        restoration for the protection of
                        infrastructure or communities from wildfire;
                        and
                    (B) subject to the requirements that--
                            (i) an environmental document be prepared;
                        and
                            (ii) the applicable agency issue an
                        authorization of the activity.
            (4) Project sponsor.--The term ``project sponsor'' means an
        entity, including any private, public, or public-private
        entity, seeking an authorization for a project.
    (b) Statute of Limitations.--Notwithstanding any other provision of
law, a civil action arising under Federal law seeking judicial review
of a final agency action granting or denying an authorization shall be
barred unless the civil action is filed by the date that is 150 days
after the date on which the grant or denial of the authorization is
required to be made public under subsection (c), unless a shorter time
is specified in the Federal law pursuant to which judicial review is
allowed.
    (c) Date.--For the purpose of subsection (b), a final agency action
granting or denying an authorization shall be made public not later
than 3 days after that final agency action is taken.
    (d) Expedited Review.--A reviewing court shall set for expedited
consideration any civil action arising under Federal law seeking
judicial review of a final agency action granting or denying an
authorization.
    (e) Remanded Actions.--
            (1) In general.--If the reviewing court remands a final
        Federal agency action granting or denying an authorization to
        the Federal agency for further proceedings, whether on a motion
        by the court, the agency, or another party, the court shall set
        a reasonable schedule and deadline for the agency to act on
        remand, which shall not exceed 180 days from the date on which
        the order of the court was issued, unless a longer time period
        is necessary to comply with applicable law.
            (2) Expedited treatment of remanded actions.--The head of
        the Federal agency to which a court remands a final Federal
        agency action under paragraph (1) shall take such actions as
        may be necessary to provide for the expeditious disposition of
        the action on remand in accordance with the schedule and
        deadline set by the court under that paragraph.
    (f) Treatment of Supplemental or Revised Environmental Documents.--
For the purpose of subsection (b), granting or denying an authorization
following the preparation of a supplemental or revised environmental
document, when required, shall be considered to be a separate final
agency action.
    (g) Notice.--Not later than 30 days after the date on which an
agency is served a copy of a petition for review or a complaint in a
civil action described in subsection (b), the head of the agency shall
notify the project sponsor of the filing of the petition or complaint.
    (h) Permitting Council.--Nothing in this title precludes a project
from being designated as a covered project (as defined in section 41001
of the FAST Act (42 U.S.C. 4370m)) for the purposes of title XLI of
that Act (42 U.S.C. 4370m et seq.).

       Subtitle B--Federal Onshore Energy Leasing and Permitting

SEC. 2211. PERMITTING COMPLIANCE ON NON-FEDERAL LAND.

    (a) In General.--Notwithstanding the Mineral Leasing Act (30 U.S.C.
181 et seq.), the Federal Oil and Gas Royalty Management Act of 1982
(30 U.S.C. 1701 et seq.), or subpart 3162 of part 3160 of title 43,
Code of Federal Regulations (or successor regulations), but subject to
any applicable State or Tribal requirements and subsection (c), the
Secretary of the Interior shall not require a permit to drill for an
oil and gas lease under the Mineral Leasing Act (30 U.S.C. 181 et seq.)
for an action occurring within an oil and gas drilling or spacing unit
if--
            (1) the well is located on non-Federal land and the Federal
        Government owns less than 50 percent of the oil and gas
        minerals within the oil and gas drilling or spacing unit;
            (2) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        enters and produces from the Federal mineral estate subject to
        the lease; or
            (3) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        traverses but does not produce from the Federal mineral estate
        subject to the lease.
    (b) Notification.--For each State permit to drill or drilling plan
that would impact or extract oil and gas owned by the Federal
Government--
            (1) each lessee of Federal minerals in the unit, or
        designee of a lessee, shall--
                    (A) notify the Secretary of the Interior of the
                submission of a State application for a permit to drill
                or drilling plan on submission of the application; and
                    (B) provide a copy of the application described in
                subparagraph (A) to the Secretary of the Interior not
                later than 5 days after the date on which the permit or
                plan is submitted; and
            (2) each lessee, designee of a lessee, or applicable State
        shall notify the Secretary of the Interior of the approved
        State permit to drill or drilling plan not later than 45 days
        after the date on which the permit or plan is approved.
    (c) Nonapplicability to Indian Lands.--Subsection (a) shall not
apply to--
            (1) any land located within the boundaries of an Indian
        reservation, pueblo, or rancheria; or
            (2) any land not located within the boundaries of an Indian
        reservation, pueblo, or rancheria, the title to which is held--
                    (A) in trust by the United States for the benefit
                of an Indian Tribe or an individual Indian;
                    (B) by an Indian Tribe or an individual Indian,
                subject to restriction against alienation under laws of
                the United States; or
                    (C) by a dependent Indian community.
    (d) Effect.--Nothing in this section affects--
            (1) other authorities of the Secretary of the Interior
        under the Federal Oil and Gas Royalty Management Act of 1982
        (30 U.S.C. 1701 et seq.); or
            (2) the amount of royalties due to the Federal Government
        from the production of the Federal minerals within the oil and
        gas drilling or spacing unit.
    (e) Authority on Non-Federal Land.--Section 17(g) of the Mineral
Leasing Act (30 U.S.C. 226(g)) is amended--
            (1) by striking the subsection designation and all that
        follows through ``Secretary of the Interior, or'' in the first
        sentence and inserting the following:
    ``(g)(1) The Secretary of the Interior, or''; and
            (2) by adding at the end the following:
    ``(2)(A) In the case of an oil and gas lease under this Act on land
described in subparagraph (B) located within an oil and gas drilling or
spacing unit, nothing in this Act authorizes the Secretary of the
Interior--
            ``(i) to require a bond to protect non-Federal land;
            ``(ii) to enter non-Federal land without the consent of the
        applicable landowner;
            ``(iii) to impose mitigation requirements; or
            ``(iv) to require approval for surface reclamation.
    ``(B) Land referred to in subparagraph (A) is land where--
            ``(i) the well is located on non-Federal land and the
        Federal Government owns less than 50 percent of the minerals
        within the oil and gas drilling or spacing unit;
            ``(ii) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        enters and produces from the Federal mineral estate subject to
        the lease; or
            ``(iii) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        traverses but does not produce from the Federal mineral estate
        subject to the lease.''.

SEC. 2212. MODIFICATION OF TRIBAL LEASES AND RIGHTS-OF-WAY ACROSS
              INDIAN LAND.

    (a) Leases of Trust or Restricted Lands.--The first section of the
Act of August 9, 1955 (69 Stat. 539, chapter 615; 25 U.S.C. 415)
(commonly known as the ``Long-Term Leasing Act''), is amended--
            (1) in subsection (a), in the second sentence, by inserting
        ``, land held in trust for any other Indian tribe included on
        the most recent list published by the Secretary pursuant to
        section 104(a) of the Federally Recognized Indian Tribe List
        Act of 1994 (25 U.S.C. 5131(a))'' after ``Chehalis
        Reservation'';
            (2) by striking ``That (a) any'' and inserting the
        following:

``SECTION 1. LEASES OF TRUST OR RESTRICTED LANDS.

    ``(a) Authorized Purposes; Term; Approval by Secretary.--Any''; and
            (3) in subsection (h)(1)--
                    (A) in the matter preceding subparagraph (A), by
                striking ``and the term of the lease does not exceed--
                '' and inserting a period; and
                    (B) by striking subparagraphs (A) and (B).
    (b) Technical Correction.--Section 2 of the Act of August 9, 1955
(69 Stat. 539, chapter 615; 25 U.S.C. 415a) (commonly known as the
``Long-Term Leasing Act''), is amended by inserting ``of the Interior''
after ``Secretary'' each place it appears.
    (c) Modifications of Rights-of-way Across Indian Land.--The Act of
February 5, 1948 (62 Stat. 17, chapter 45), is amended--
            (1) in the first section (62 Stat. 17, chapter 45; 25
        U.S.C. 323), by striking ``That the Secretary of the Interior
        be, and he is hereby, empowered to'' and inserting the
        following:

``SECTION 1. RIGHTS-OF-WAY FOR ALL PURPOSES ACROSS INDIAN LAND.

    ``(a) Rights-of-way.--The Secretary of the Interior may'';
            (2) in section 2 (62 Stat. 18, chapter 45; 25 U.S.C. 324),
        by striking ``organized under the Act of June 18, 1934 (48
        Stat. 984), as amended; the Act of May 1, 1936 (49 Stat. 1250);
        or the Act of June 26, 1936 (49 Stat. 1967),''; and
            (3) by adding at the end the following:

``SEC. 8. TRIBAL GRANTS OF RIGHTS-OF-WAY.

    ``(a) Rights-of-Way.--
            ``(1) In general.--Subject to paragraph (2), an Indian
        tribe may grant a right-of-way over and across the Tribal land
        of the Indian tribe for any purpose.
            ``(2) Authority.--A right-of-way granted under paragraph
        (1) shall not require the approval of the Secretary of the
        Interior or a grant by the Secretary of the Interior under
        section 1 if the right-of-way granted under paragraph (1) is
        executed in accordance with a Tribal regulation approved by the
        Secretary of the Interior under subsection (b).
    ``(b) Review of Tribal Regulations.--
            ``(1) Tribal regulation submission and approval.--
                    ``(A) Submission.--An Indian tribe seeking to grant
                a right-of-way under subsection (a) shall submit for
                approval a Tribal regulation governing the granting of
                rights-of-way over and across the Tribal land of the
                Indian tribe.
                    ``(B) Approval.--Subject to paragraph (2), the
                Secretary of the Interior shall have the authority to
                approve or disapprove any Tribal regulation submitted
                under subparagraph (A).
            ``(2) Considerations for approval.--
                    ``(A) In general.--The Secretary of the Interior
                shall approve a Tribal regulation submitted under
                paragraph (1)(A), if the Tribal regulation--
                            ``(i) is consistent with any regulations
                        (or successor regulations) issued by the
                        Secretary of the Interior under section 4;
                            ``(ii) provides for an environmental review
                        process that includes--
                                    ``(I) the identification and
                                evaluation of any significant impacts
                                the proposed action may have on the
                                environment; and
                                    ``(II) a process for ensuring--
                                            ``(aa) that the public is
                                        informed of, and has a
                                        reasonable opportunity to
                                        comment on, any significant
                                        environmental impacts of the
                                        proposed action identified by
                                        the Indian tribe under
                                        subclause (I); and
                                            ``(bb) the Indian tribe
                                        provides a response to each
                                        relevant and substantive public
                                        comment on the significant
                                        environmental impacts
                                        identified by the Indian tribe
                                        under subclause (I) before the
                                        Indian tribe approves the
                                        right-of-way.
                    ``(B) Statutory exemptions.--The Secretary of the
                Interior, in making an approval decision under this
                subsection, shall not be subject to--
                            ``(i) the National Environmental Policy Act
                        of 1969 (42 U.S.C. 4321 et seq.);
                            ``(ii) section 306108 of title 54, United
                        States Code; or
                            ``(iii) the Endangered Species Act of 1973
                        (16 U.S.C. 1531 et seq.).
            ``(3) Review process.--
                    ``(A) In general.--Not later than 180 days after
                the date on which the Indian tribe submits a Tribal
                regulation to the Secretary of the Interior under
                paragraph (1)(A), the Secretary of the Interior shall--
                            ``(i) review the Tribal regulation;
                            ``(ii) approve or disapprove the Tribal
                        regulation; and
                            ``(iii) notify the Indian tribe that
                        submitted the Tribal regulation of the approval
                        or disapproval.
                    ``(B) Written documentation.--If the Secretary of
                the Interior disapproves a Tribal regulation submitted
                under paragraph (1)(A), the Secretary of the Interior
                shall include with the disapproval notification under
                subparagraph (A)(iii) written documentation describing
                the basis for the disapproval.
                    ``(C) Extension.--The Secretary of the Interior
                may, after consultation with the Indian tribe that
                submitted a Tribal regulation under paragraph (1)(A),
                extend the 180-day period described in subparagraph
                (A).
            ``(4) Federal environmental review.--Notwithstanding
        paragraphs (2) and (3), if an Indian tribe carries out a
        project or activity funded by a Federal agency, the Indian
        tribe may rely on the environmental review process of the
        applicable Federal agency rather than any Tribal environmental
        review process required under this subsection.
    ``(c) Documentation.--An Indian tribe granting a right-of-way under
subsection (a) shall provide to the Secretary of the Interior--
            ``(1) a copy of the right-of-way, including any amendments
        or renewals; and
            ``(2) if the right-of-way allows for compensation to be
        made directly to the Indian tribe, documentation of payments
        that are sufficient, as determined by the Secretary of the
        Interior, as to enable the Secretary of the Interior to
        discharge the trust responsibility of the United States under
        subsection (d).
    ``(d) Trust Responsibility.--
            ``(1) In general.--The United States shall not be liable
        for losses sustained by any party to a right-of-way granted
        under subsection (a).
            ``(2) Authority of the secretary.--
                    ``(A) In general.--Pursuant to the authority of the
                Secretary of the Interior to fulfill the trust
                obligation of the United States to the applicable
                Indian tribe under Federal law (including regulations),
                the Secretary of the Interior may, on reasonable notice
                from the applicable Indian tribe and at the discretion
                of the Secretary of the Interior, enforce the
                provisions of, or cancel, any right-of-way granted by
                the Indian tribe under subsection (a).
                    ``(B) Authority.--The enforcement or cancellation
                of a right-of-way under subparagraph (A) shall be
                conducted using regulatory procedures issued under
                section 6.
    ``(e) Compliance.--
            ``(1) In general.--An interested party, after exhaustion of
        any applicable Tribal remedies, may submit a petition to the
        Secretary of the Interior, at such time and in such form as
        determined by the Secretary of the Interior, to review the
        compliance of an applicable Indian tribe with a Tribal
        regulation approved by the Secretary of the Interior under
        subsection (b).
            ``(2) Violations.--If the Secretary of the Interior
        determines that a Tribal regulation was violated after
        conducting a review under paragraph (1), the Secretary of the
        Interior may take any action the Secretary of the Interior
        determines to be necessary to remedy the violation, including
        rescinding the approval of the Tribal regulation and reassuming
        responsibility for approving rights-of-way through the trust
        land of the applicable Indian tribe.
            ``(3) Documentation.--If the Secretary of the Interior
        determines that a Tribal regulation was violated after
        conducting a review under paragraph (1), the Secretary of the
        Interior shall--
                    ``(A) provide written documentation, with respect
                to the Tribal regulation that has been violated, to the
                appropriate interested party and Indian tribe;
                    ``(B) provide the applicable Indian tribe with a
                written notice of the alleged violation; and
                    ``(C) prior to the exercise of any remedy,
                including rescinding the approval for the applicable
                Tribal regulation or reassuming responsibility for
                approving rights-of-way through the trust land of the
                applicable Indian tribe, provide the applicable Indian
                tribe with--
                            ``(i) a hearing that is on the record; and
                            ``(ii) a reasonable opportunity to cure the
                        alleged violation.
    ``(f) Savings Clause.--Nothing in this section affects the
application of any Tribal regulations issued under Federal
environmental law.
    ``(g) Effect of Tribal Regulations.--An approved Tribal regulation
under subsection (b) shall not preclude an Indian tribe from, in the
discretion of the Indian tribe, consenting to the grant of a right-of-
way by the Secretary of the Interior under section 1.
    ``(h) Terms of Right-of-way.--The compensation for, and terms of, a
right-of-way granted under subsection (a) will be determined by--
            ``(1) negotiations by the Indian tribe; or
            ``(2) the regulations of the Indian tribe.
    ``(i) Jurisdiction.--The grant of a right-of-way under subsection
(a) does not waive the sovereign immunity of the Indian tribe or
diminish the jurisdiction of that Indian tribe over the Tribal land
subject to the right-of-way, unless otherwise provided in--
            ``(1) the grant of the right-of-way; or
            ``(2) the regulations of the Indian tribe.''.

SEC. 2213. ACCELERATING RENEWABLE ENERGY PERMITTING.

    (a) Definitions.--In this section:
            (1) Eligible project.--The term ``eligible project'' has
        the meaning given the term in section 3101 of the Energy Act of
        2020 (43 U.S.C. 3001) (as amended by subsection (d)).
            (2) Previously disturbed or developed.--The term
        ``previously disturbed or developed'' has the meaning given the
        term in section 1021.410(g)(1) of title 10, Code of Federal
        Regulations (as in effect on July 2, 2025).
    (b) Deadline for Consideration of Applications for Rights-of-way.--
            (1) Completeness of review.--
                    (A) In general.--Not later than 30 days after the
                date on which the Secretary of the Interior or the
                Secretary of Agriculture, as applicable, receives an
                application for a right-of-way under section 501 of the
                Federal Land Policy and Management Act of 1976 (43
                U.S.C. 1761) for an eligible project, the applicable
                Secretary shall--
                            (i) notify the applicant that the
                        application is complete; or
                            (ii) notify the applicant that information
                        is missing from the application and specify any
                        information that is required to be submitted
                        for the application to be complete.
                    (B) Environmental impact statement.--For an
                eligible project that requires an environmental impact
                statement for an application submitted under
                subparagraph (A), the Secretary of the Interior or the
                Secretary of Agriculture, as applicable, shall issue a
                notice of intent not later than 90 days after the date
                on which the applicable Secretary determines that an
                application is complete under subparagraph (A).
            (2) Cost recovery and issuance or deferral.--
                    (A) In general.--Not later than 30 days after the
                date on which an applicant submits a complete
                application for a right-of-way under paragraph (1), the
                Secretary of the Interior or the Secretary of
                Agriculture, as applicable, shall, if a cost recovery
                agreement is required under section 2804.14 of title
                43, Code of Federal Regulations (or successor
                regulations), or section 251.58 of title 36, Code of
                Federal Regulations (or successor regulations), issue a
                cost recovery agreement.
                    (B) Decision.--Not later than 30 days after the
                date on which an applicant submits a complete
                application for a right-of-way under paragraph (1), the
                Secretary of the Interior or the Secretary of
                Agriculture, as applicable, shall--
                            (i) grant or deny the application, if the
                        requirements under the National Environmental
                        Policy Act of 1969 (42 U.S.C. 4321 et seq.) and
                        any other applicable law have been completed;
                        or
                            (ii) defer the decision on the application
                        and provide to the applicant notice--
                                    (I) that specifies steps that the
                                applicant can take for the decision on
                                the application to be issued; and
                                    (II) of a list of actions that need
                                to be taken by the agency in order to
                                comply with applicable law, and
                                timelines and deadlines for completing
                                those actions.
    (c) Low Disturbance Activities for Renewable Energy Projects.--
            (1) In general.--Not later than 180 days after the date of
        enactment of this Act, to facilitate timely permitting of
        eligible projects, the Secretary of the Interior and the
        Secretary of Agriculture shall each develop or adopt 1 or more
        categorical exclusions, including allowing for extraordinary
        circumstances under which the categorical exclusion shall not
        be available, under the National Environmental Policy Act of
        1969 (42 U.S.C. 4321 et seq.) for low disturbance activities
        necessary for renewable energy projects.
            (2) Activities described.--Low disturbance activities
        referred to in paragraph (1) are the following:
                    (A) Individual surface disturbances of less than 5
                acres that have undergone site-specific analysis in a
                document prepared pursuant to the National
                Environmental Policy Act of 1969 (42 U.S.C. 4321 et
                seq.) that has been previously completed.
                    (B) Activities at a location at which the same type
                of activity has previously occurred within 5 years
                prior to the date of commencement of the activity.
                    (C) Activities on previously disturbed or developed
                land for which an approved land use plan or any
                environmental document prepared pursuant to the
                National Environmental Policy Act of 1969 (42 U.S.C.
                4321 et seq.) analyzed such activity as reasonably
                foreseeable, so long as such plan or document was
                approved within 5 years prior to the date of the
                activity.
                    (D) The installation, modification, operation, or
                removal of commercially available solar photovoltaic
                systems located on--
                            (i) a building or other structure (such as
                        a rooftop, parking lot, or facility, or mounted
                        to signage, lighting, gates, or fences); or
                            (ii) previously disturbed or developed land
                        comprising less than 10 acres.
                    (E) Maintenance of a minor activity, other than any
                construction or major renovation, or a building or
                facility.
                    (F) Preliminary geotechnical investigations.
                    (G) The construction and removal of meteorological
                evaluation towers.
    (d) Definition of Eligible Project.--Paragraph (4) of section 3101
of the Energy Act of 2020 (43 U.S.C. 3001) is amended by inserting ``or
store'' after ``generate''.
    (e) Renewable Energy Project Review Standards.--Section 3102 of the
Energy Act of 2020 (43 U.S.C. 3002) is amended--
            (1) by redesignating subsection (f) as subsection (g); and
            (2) by inserting after subsection (e) the following:
    ``(f) Renewable Energy Project Review Standards.--Not later than 2
years after the date of enactment of the Bipartisan American
Affordability and Jobs Act of 2026, for the purpose of encouraging
standardized reviews and facilitating the permitting of eligible
projects, the National Renewable Energy Coordination Office of the
Bureau of Land Management shall promulgate renewable energy project
review standards to be adopted by regional renewable energy
coordination offices.''.

SEC. 2214. ELECTRIC GRID PROJECTS.

    (a) Definition of Previously Disturbed or Developed.--In this
section, the term ``previously disturbed or developed'' has the meaning
given the term in section 1021.410(g)(1) of title 10, Code of Federal
Regulations (or successor regulations).
    (b) Rulemaking.--Not later than 180 days after the date of
enactment of this Act, to facilitate timely permitting, the Secretary
of the Interior and the Secretary of Agriculture shall each develop or
adopt 1 or more categorical exclusions, including allowing for
extraordinary circumstances under which the categorical exclusion shall
not be available, under the National Environmental Policy Act of 1969
(42 U.S.C. 4321 et seq.) for the following activities:
            (1) Placement of an electric transmission or distribution
        facility in an approved right-of-way corridor, including a
        corridor designated under section 368 of the Energy Policy Act
        of 2005 (42 U.S.C. 15926).
            (2) Any repair, maintenance, replacement, upgrade,
        modification, optimization, or minor relocation of, or addition
        to, an existing electric transmission or distribution facility
        or associated infrastructure, including electrical substations,
        within an existing right-of-way or on otherwise previously
        disturbed or developed land, including reconductoring and
        installation of grid-enhancing technologies.
            (3) Construction, operation, upgrade, or decommissioning of
        a battery or other energy storage technology on previously
        disturbed or developed land.

SEC. 2215. HARDROCK MINING MILL SITES.

    (a) Multiple Mill Sites.--Section 2337 of the Revised Statutes (30
U.S.C. 42) is amended by adding at the end the following:
    ``(c) Additional Mill Sites.--
            ``(1) Definitions.--In this subsection:
                    ``(A) Mill site.--The term `mill site' means a
                location of public land that is reasonably necessary
                for waste rock or tailings disposal or other operations
                reasonably incident to mineral development on, or
                production from land included in a plan of operations.
                    ``(B) Operations; operator.--The terms `operations'
                and `operator' have the meanings given those terms in
                section 3809.5 of title 43, Code of Federal Regulations
                (as in effect on the date of enactment of this
                subsection).
                    ``(C) Plan of operations.--The term `plan of
                operations' means a plan of operations that an operator
                must submit and the Secretary of the Interior or the
                Secretary of Agriculture, as applicable, must approve
                before an operator may begin operations, in accordance
                with, as applicable--
                            ``(i) subpart 3809 of part 3800 of title
                        43, Code of Federal Regulations (or successor
                        regulations establishing application and
                        approval requirements); and
                            ``(ii) part 228 of title 36, Code of
                        Federal Regulations (or successor regulations
                        establishing application and approval
                        requirements).
                    ``(D) Public land.--The term `public land' means
                land owned by the United States that is open to
                location under sections 2319 through 2344 of the
                Revised Statutes (30 U.S.C. 22 et seq.), including--
                            ``(i) land that is mineral-in-character (as
                        defined in section 3830.5 of title 43, Code of
                        Federal Regulations (as in effect on the date
                        of enactment of this subsection));
                            ``(ii) nonmineral land (as defined in
                        section 3830.5 of title 43, Code of Federal
                        Regulations (as in effect on the date of
                        enactment of this subsection)); and
                            ``(iii) land where the mineral character
                        has not been determined.
            ``(2) Authorization.--Notwithstanding subsections (a) and
        (b), where public land is needed by the proprietor of a lode or
        placer claim for operations in connection with any lode or
        placer claim within the proposed plan of operations, the
        proprietor may--
                    ``(A) locate and include within the plan of
                operations as many mill site claims under this
                subsection as are reasonably necessary for its
                operations; and
                    ``(B) use or occupy public land in accordance with
                an approved plan of operations.
            ``(3) Mill sites convey no mineral rights.--A mill site
        under this subsection does not convey mineral rights to the
        locator.
            ``(4) Size of mill sites.--A location of a single mill site
        under this subsection shall not exceed 5 acres.
            ``(5) Mill site and lode or placer claims on same tracts of
        public land.--A mill site may be located under this subsection
        on a tract of public land on which the claimant or operator
        maintains a previously located lode or placer claim.
            ``(6) Effect on mining claims.--The location of a mill site
        under this subsection shall not affect the validity of any lode
        or placer claim, or any rights associated with such a claim.
            ``(7) Patenting.--A mill site under this section shall not
        be eligible for patenting.
            ``(8) Savings provisions.--Nothing in this subsection--
                    ``(A) diminishes any right (including a right of
                entry, use, or occupancy) of a claimant;
                    ``(B) creates or increases any right (including a
                right of exploration, entry, use, or occupancy) of a
                claimant on land that is not open to location under the
                general mining laws;
                    ``(C) modifies any provision of law or any prior
                administrative action withdrawing land from location or
                entry;
                    ``(D) limits the right of the Federal Government to
                regulate mining and mining-related activities
                (including requiring claim validity examinations to
                establish the discovery of a valuable mineral deposit)
                in areas withdrawn from mining, including under--
                            ``(i) the general mining laws;
                            ``(ii) the Federal Land Policy and
                        Management Act of 1976 (43 U.S.C. 1701 et
                        seq.);
                            ``(iii) the Wilderness Act (16 U.S.C. 1131
                        et seq.);
                            ``(iv) sections 100731 through 100737 of
                        title 54, United States Code;
                            ``(v) the Endangered Species Act of 1973
                        (16 U.S.C. 1531 et seq.);
                            ``(vi) division A of subtitle III of title
                        54, United States Code (commonly referred to as
                        the `National Historic Preservation Act'); or
                            ``(vii) section 4 of the Act of July 23,
                        1955 (commonly known as the `Surface Resources
                        Act of 1955') (69 Stat. 368, chapter 375; 30
                        U.S.C. 612);
                    ``(E) restores any right (including a right of
                entry, use, or occupancy, or right to conduct
                operations) of a claimant that--
                            ``(i) existed prior to the date on which
                        the land was closed to, or withdrawn from,
                        location under the general mining laws; and
                            ``(ii) that has been extinguished by such
                        closure or withdrawal; or
                    ``(F) modifies section 404 of division E of the
                Consolidated Appropriations Act, 2024 (Public Law 118-
                42).''.
    (b) Claim Maintenance Fee for Additional Mill Sites.--Section
10101(a)(1) of the Omnibus Budget Reconciliation Act of 1993 (30 U.S.C.
28f(a)(1)) is amended, in the first sentence, by inserting ``, except
the holders of each mill site located under subsection (c) of section
2337 of the Revised Statutes (30 U.S.C. 42) shall pay to the Secretary
of the Interior, on or before September 1 of each year, to the extent
provided in advance in appropriations Acts, a claim maintenance fee of
$400 per site'' after ``respectively''.
    (c) Application of Mineral Leasing Act for Acquired Lands to
Hardrock Minerals.--
            (1) Hardrock minerals.--Section 2 of the Mineral Leasing
        Act for Acquired Lands (30 U.S.C. 351) is amended--
                    (A) in the sixth sentence, by striking ``The term''
                and all that follows through ``embrace'' and inserting
                the following:
            ``(5) Oil.--The term `oil' means'';
                    (B) in the fifth sentence, by striking ```Lease'''
                and inserting the following:
            ``(3) Lease.--The term `lease''';
                    (C) by striking the fourth sentence and inserting
                the following:
            ``(4) Mineral leasing laws.--The term `mineral leasing
        laws' means--
                    ``(A) the Mineral Leasing Act (30 U.S.C. 181 et
                seq.);
                    ``(B) the Act of April 17, 1926 (44 Stat. 301,
                chapter 158; 30 U.S.C. 271 et seq.);
                    ``(C) the Act of February 7, 1927 (44 Stat. 1057,
                chapter 66; 30 U.S.C. 281 et seq.); and
                    ``(D) all Acts amendatory or supplementary to any
                of the Acts described in subparagraphs (A) through
                (C).'';
                    (D) in the third sentence, by striking
                ```Secretary''' and inserting the following:
            ``(6) Secretary.--The term `Secretary''';
                    (E) in the second sentence--
                            (i) by striking ``(36 Stat.'' and all that
                        follows through the period at the end and
                        inserting ``(commonly known as the `Weeks Law')
                        (36 Stat. 961, chapter 186; 16 U.S.C. 552 et
                        seq.).''; and
                            (ii) by striking ```Acquired lands' or
                        `lands acquired by the United States' include''
                        and inserting the following:
            ``(1) Acquired lands; lands acquired by the united
        states.--The terms `acquired lands' and `lands acquired by the
        United States' mean'';
                    (F) in the first sentence, by striking ``As used in
                this Act `United States''' and inserting the following:
                ``In this Act:
            ``(7) United states.--The term `United States''';
                    (G) by moving the paragraphs so as to appear in
                numerical order; and
                    (H) by inserting after paragraph (1) (as so
                designated) the following:
            ``(2) Hardrock mineral.--
                    ``(A) In general.--The term `hardrock mineral'
                includes deposits of--
                            ``(i) minerals found in sedimentary or
                        other rocks;
                            ``(ii) base metals;
                            ``(iii) precious metals;
                            ``(iv) industrial minerals; and
                            ``(v) precious and semi-precious gemstones.
                    ``(B) Exclusions.--The term `hardrock mineral' does
                not include deposits of--
                            ``(i) coal;
                            ``(ii) oil;
                            ``(iii) oil shale;
                            ``(iv) gas;
                            ``(v) sodium;
                            ``(vi) potassium;
                            ``(vii) sulfur; or
                            ``(viii) mineral materials subject to
                        disposition under the Act of July 31, 1947
                        (commonly known as the `Materials Act of 1947')
                        (61 Stat. 681, chapter 406; 30 U.S.C. 601 et
                        seq.).''.
            (2) Deposits subject to lease.--Section 3 of the Mineral
        Leasing Act for Acquired Lands (30 U.S.C. 352) is amended, in
        the first sentence, by striking ``and sulfur'' and inserting
        ``sulfur, and hardrock minerals''.
    (d) Abandoned Hardrock Mine Fund.--
            (1) Establishment.--There is established in the Treasury of
        the United States a separate account, to be known as the
        ``Abandoned Hardrock Mine Fund'' (referred to in this
        subsection as the ``Fund'').
            (2) Source of deposits.--
                    (A) In general.--Any amounts collected by the
                Secretary of the Interior pursuant to the claim
                maintenance fee under section 10101(a)(1) of the
                Omnibus Budget Reconciliation Act of 1993 (30 U.S.C.
                28f(a)(1)) on mill sites located under subsection (c)
                of section 2337 of the Revised Statutes (30 U.S.C. 42)
                shall be deposited into the Fund.
                    (B) Hardrock minerals.--Section 6(a) of the Mineral
                Leasing Act for Acquired Lands (30 U.S.C. 355(a)) is
                amended by adding at the end the following: ``Beginning
                on the date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, any receipts
                derived from leases of hardrock minerals pursuant to
                section 3 that would otherwise be paid into the
                Treasury shall be deposited into the Abandoned Hardrock
                Mine Fund established by section 2215(d) of the
                Bipartisan American Affordability and Jobs Act of
                2026.''.
            (3) Use.--The Secretary of the Interior may make
        expenditures from amounts available in the Fund, without
        further appropriations or fiscal year limitation, only to carry
        out section 40704 of the Infrastructure Investment and Jobs Act
        (30 U.S.C. 1245).
            (4) Allocation of funds.--Amounts made available under
        paragraph (3)--
                    (A) shall be allocated in accordance with section
                40704(e)(1) of the Infrastructure Investment and Jobs
                Act (30 U.S.C. 1245(e)(1));
                    (B) may be transferred in accordance with section
                40704(e)(2) of that Act (30 U.S.C. 1245(e)(2)); and
                    (C) may be used for the administration of the Fund
                and section 40704 of the Infrastructure Investment and
                Jobs Act (30 U.S.C. 1245) in amounts not to exceed 5
                percent of amounts deposited into the Fund.
    (e) Clerical Amendments.--Section 10101 of the Omnibus Budget
Reconciliation Act of 1993 (30 U.S.C. 28f) is amended--
            (1) by striking ``the Mining Law of 1872 (30 U.S.C. 28-
        28e)'' each place it appears and inserting ``sections 2319
        through 2344 of the Revised Statutes (30 U.S.C. 22 et seq.)'';
            (2) in subsection (a)--
                    (A) in paragraph (1)--
                            (i) in the second sentence, by striking
                        ``Such claim maintenance fee'' and inserting
                        the following:
                    ``(B) Fee.--The claim maintenance fee under
                subparagraph (A)''; and
                            (ii) in the first sentence, by striking
                        ``The holder of'' and inserting the following:
                    ``(A) In general.--The holder of''; and
                    (B) in paragraph (2)--
                            (i) in the second sentence--
                                    (I) by striking ``the Mining Law of
                                1872 (30 U.S.C. 28 to 28e)'' and
                                inserting ``sections 2319 through 2344
                                of the Revised Statutes (30 U.S.C. 22
                                et seq.)''; and
                                    (II) by striking ``Such claim
                                maintenance fee'' and inserting the
                                following:
                    ``(B) Fee.--The claim maintenance fee under
                subparagraph (A)''; and
                            (ii) in the first sentence, by striking
                        ``The holder of'' and inserting the following:
                    ``(A) In general.--The holder of''; and
            (3) in subsection (b)--
                    (A) in the second sentence, by striking ``The
                location fee'' and inserting the following:
            ``(2) Fee.--The location fee''; and
                    (B) in the first sentence, by striking ``The claim
                main tenance fee'' and inserting the following:
            ``(1) In general.--The claim maintenance fee''.

             Subtitle C--Geothermal Leasing and Permitting

SEC. 2221. GEOTHERMAL OBSERVATION TEST PROJECTS.

    The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) is
amended by adding at the end the following:

``SEC. 30. GEOTHERMAL OBSERVATION TEST PROJECTS.

    ``(a) Definitions.--In this section:
            ``(1) Casual use.--The term `casual use', with respect to a
        geothermal observation test project, means activities
        ordinarily resulting in no or negligible disturbance of public
        land or resources.
            ``(2) Categorical exclusion.--The term `categorical
        exclusion' has the meaning given the term in section 3 of the
        National Environmental Policy Act of 1969.
            ``(3) Downhole.--The term `downhole' means a well or
        borehole dug or drilled into the subsurface of the earth for
        the purposes of resource confirmation or potential use.
            ``(4) Geothermal observation test project.--The term
        `geothermal observation test project' means using geothermal
        technologies to drill a test, monitor, calibration, or other
        similar type of exploratory drilling process well for
        geothermal resources on land for which the Secretary concerned
        has issued a lease under this Act, that--
                    ``(A) causes an allowable amount of total
                disturbance;
                    ``(B) does not include any permanent roads;
                    ``(C) is developed--
                            ``(i) with the deepest cemented casing
                        string less than 12 inches of downhole size in
                        diameter;
                            ``(ii) in a manner that does not require
                        off-road motorized access other than to and
                        from the well site along an identified off-road
                        route;
                            ``(iii) with temporary road access, if
                        needed to enable access to the geothermal
                        observation test project location, subject to
                        the requirement that--
                                    ``(I) construction of the temporary
                                road access is remediated as close as
                                reasonably practicable to original
                                condition following completion of the
                                geothermal observation test project
                                work; or
                                    ``(II) the temporary road access,
                                with any additional permanent
                                improvements, is included as part of
                                the full review required under the
                                National Environmental Policy Act of
                                1969 (42 U.S.C. 4321 et seq.) if the
                                leaseholder intends to proceed with
                                geothermal energy use for--
                                            ``(aa) the production of
                                        electricity;
                                            ``(bb) industrial
                                        processes;
                                            ``(cc) agricultural
                                        processes;
                                            ``(dd) brine mineral
                                        extraction;
                                            ``(ee) direct heating and
                                        cooling uses; or
                                            ``(ff) any combination of
                                        items (aa) through (ee); and
                            ``(iv) with the use of rubber-tired digging
                        or drilling equipment vehicles;
                    ``(D) is completed in less than 1 year--
                            ``(i) including the removal of any surface
                        infrastructure from the site, unless--
                                    ``(I) the party conducting the
                                geothermal observation test project
                                submits to the Secretary concerned by
                                not later than 60 days after the date
                                of first exploration drilling an
                                extension request for additional time
                                to complete the observation project, in
                                which the request provides
                                justification indicating why granting
                                an extension is necessary; and
                                    ``(II) the Secretary concerned
                                grants an extension under subclause
                                (I), if requested; or
                            ``(ii) not including removal of any surface
                        infrastructure from the site so long as the
                        geothermal developer intends to proceed with
                        resource development directly following the
                        test phase of the project and into processes
                        required under the National Environmental
                        Policy Act of 1969 (42 U.S.C. 4321 et seq.);
                        and
                    ``(E) requires the restoration of the project site
                as part of any new review required under the National
                Environmental Policy Act of 1969 (42 U.S.C. 4321 et
                seq.) within 3 years of the date of first exploration
                drilling to approximately the condition that existed at
                the time the project began, unless the site is
                subsequently used as part of energy development under
                the lease.
            ``(5) Geothermal technology.--The term `geothermal
        technology' means technology designed to extract heat from the
        subsurface of the earth and that is used to drill--
                    ``(A) hydrothermal project test wells;
                    ``(B) enhanced geothermal system monitoring wells;
                    ``(C) closed loop geothermal system calibration
                wells; and
                    ``(D) similar types of subsurface disturbances
                through non-production wells to assess the viability of
                the heat resources of the earth.
            ``(6) Secretary concerned.--The term `Secretary concerned'
        means--
                    ``(A) the Secretary of Agriculture, with respect to
                National Forest System land; and
                    ``(B) the Secretary, with respect to public lands.
            ``(7) Surface infrastructure.--The term `surface
        infrastructure' means all equipment, materials, facilities, and
        other items used in the drilling of a geothermal observation
        test project.
            ``(8) Total disturbance.--
                    ``(A) In general.--The term `total disturbance'
                means a geothermal observation test project that causes
                not more than 10 acres of disturbance from--
                            ``(i) soil or vegetation disruption at the
                        location of each geothermal observation test
                        project; and
                            ``(ii) soil or vegetation disruption during
                        access or egress to the geothermal observation
                        test project site.
                    ``(B) Allowance.--
                            ``(i) Multiple projects.--For instances of
                        multiple geothermal observation test projects,
                        the acres of total disturbance allowed shall--
                                    ``(I) be equal to the total number
                                of geothermal observation test projects
                                multiplied by 10 acres; and
                                    ``(II) not exceed 100 total acres.
                            ``(ii) Access or egress.--For soil or
                        vegetation disruption during access or egress
                        to a geothermal observation test project site,
                        the acres of total soil or vegetation
                        disruption allowed shall be equal to the acres
                        of total disturbance allowed minus the acres of
                        soil or vegetation disruption caused by the
                        geothermal observation test project.
    ``(b) Categorical Exclusion.--
            ``(1) In general.--Not later than 1 year after the date of
        enactment of this section, the Secretary concerned shall
        develop a categorical exclusion for geothermal observation test
        projects.
            ``(2) Administration.--In developing and administering the
        categorical exclusion under paragraph (1), the Secretary
        concerned shall--
                    ``(A) comply with the National Environmental Policy
                Act of 1969 (42 U.S.C. 4321 et seq.); and
                    ``(B) apply any applicable extraordinary
                circumstance under section 46.215 of title 43, Code of
                Federal Regulations (or a successor regulation), in
                determining whether to use the categorical exclusion.
    ``(c) Non-major Federal Action.--
            ``(1) In general.--Activities that are casual use shall not
        be considered a major Federal action under the National
        Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.).
            ``(2) Notice of intent.--A party wishing to conduct
        activities that are casual use shall provide to the Secretary a
        notice of intent to carry out those activities before the start
        of the activities.''.

SEC. 2222. GEOTHERMAL ROYALTIES.

    (a) Definitions.--
            (1) In general.--Section 2 of the Geothermal Steam Act of
        1970 (30 U.S.C. 1001) is amended--
                    (A) in the matter preceding subsection (a), by
                striking ``As used in this Act, the term--'' and
                inserting ``In this Act:'';
                    (B) in each of subsections (a) through (d), by
                striking the semicolon at the end and inserting a
                period;
                    (C) in subsection (e), by striking ``geothermal
                steam or associated'';
                    (D) in subsection (f)--
                            (i) in the matter preceding paragraph (1),
                        by striking ``Significant'' and inserting
                        ``significant''; and
                            (ii) by redesignating paragraphs (1)
                        through (4) as subparagraphs (A) through (D),
                        respectively, and indenting appropriately;
                    (E) in subsection (g), by striking ``; and'' and
                inserting a period;
                    (F) by redesignating subsections (a) through (g) as
                paragraphs (8), (4), (5), (1), (7), (9), and (2),
                respectively, indenting the paragraphs appropriately,
                and moving the paragraphs so as to appear in numerical
                order;
                    (G) in each of paragraphs (1), (2), (4), (5), (7),
                (8), and (9)--
                            (i) by inserting ``The term'' after the
                        paragraph designation; and
                            (ii) by inserting a paragraph heading, the
                        text of which comprises the term defined in
                        that paragraph;
                    (H) by inserting after paragraph (2) (as so
                redesignated) the following:
            ``(3) Geothermal electric generating facility.--
                    ``(A) In general.--The term `geothermal electric
                generating facility' means a facility, including all
                necessary equipment or structures (including turbines,
                cooling equipment, and other equipment), that converts
                geothermal resources into electricity.
                    ``(B) Separate facilities.--A plant or site of a
                facility described in subparagraph (A) shall be
                considered a new or separate facility from the facility
                described in subparagraph (A) only if no turbines are
                shared with that existing facility.''; and
                    (I) by inserting after paragraph (5) (as so
                redesignated) the following:
            ``(6) In-service date.--The term `in-service date', with
        respect to a geothermal electric generating facility, means the
        date on which the geothermal electric generating facility
        begins operating.''.
            (2) Conforming amendments.--
                    (A) Section 6(i) of the Geothermal Steam Act of
                1970 (30 U.S.C. 1005(i)) is amended by striking ``as
                defined in section 2(c) herein''.
                    (B) Section 28(a)(1) of the Geothermal Steam Act of
                1970 (30 U.S.C. 1026(a)(1)) is amended in the matter
                preceding subparagraph (A) by striking ``, as defined
                in section 2(f),''.
    (b) Geothermal Royalties.--Section 5(a)(1) of the Geothermal Steam
Act of 1970 (30 U.S.C. 1004(a)(1)) is amended--
            (1) in subparagraph (A)--
                    (A) by inserting ``with respect to a geothermal
                electric generating facility producing electricity from
                geothermal resources,'' before ``not less than'';
                    (B) by inserting ``by such facility'' after
                ``produced''; and
                    (C) by striking ``the first 10 years of production
                under the lease'' and inserting ``each year of the 10-
                year period following the in-service date of the
                geothermal electric generating facility''; and
            (2) in subparagraph (B)--
                    (A) by inserting ``with respect to a geothermal
                electric generating facility producing electricity from
                geothermal resources,'' before ``not less than'';
                    (B) by inserting ``by such facility'' after
                ``produced''; and
                    (C) by striking ``such 10-year period'' and
                inserting ``the 10-year period described in
                subparagraph (A)''.

SEC. 2223. GEOTHERMAL LEASING REFORM.

    (a) Annual Leasing.--Section 4(b) of the Geothermal Steam Act of
1970 (30 U.S.C. 1003(b)) is amended--
            (1) in paragraph (2), by striking ``2 years'' and inserting
        ``year'';
            (2) by adding at the end the following:
            ``(5) Replacement sales.--If a lease sale under paragraph
        (1) for a year is cancelled or delayed, the Secretary shall
        conduct a replacement sale during the same year.''.
    (b) Deadlines for Consideration of Geothermal Drilling Permits.--
Section 4 of the Geothermal Steam Act of 1970 (30 U.S.C. 1003) is
amended by adding at the end the following:
    ``(h) Deadlines for Consideration of Geothermal Drilling Permits.--
            ``(1) Notice.--Not later than 30 days after the date on
        which the Secretary receives an application for any geothermal
        drilling permit, the Secretary shall--
                    ``(A) provide written notice to the applicant that
                the application is complete; or
                    ``(B) notify the applicant that information is
                missing and specify any information that is required to
                be submitted for the application to be complete.
            ``(2) Issuance or deferral.--
                    ``(A) In general.--Not later than 30 days after the
                Secretary has provided written notice to an applicant
                for a geothermal drilling permit that the application
                for such permit is complete pursuant to paragraph
                (1)(A), the Secretary shall--
                            ``(i) issue the permit, if the requirements
                        under the National Environmental Policy Act of
                        1969 (42 U.S.C. 4321 et seq.) and other
                        applicable law have been completed within the
                        timeframe; or
                            ``(ii) defer the decision on the permit and
                        provide to the applicant a notice--
                                    ``(I) that specifies any steps that
                                the applicant could take for the permit
                                to be issued; and
                                    ``(II) that includes a list of
                                actions that need to be taken by the
                                agency to comply with applicable law,
                                together with timelines and deadlines
                                for taking those actions, which shall
                                not exceed the deadlines specified in
                                section 107(g) of the National
                                Environmental Policy Act of 1969 (42
                                U.S.C. 4336a(g)).
                    ``(B) Deadline for deferred decisions.--If the
                Secretary defers a decision on a permit under
                subparagraph (A)(ii), the Secretary shall issue a
                decision on the permit not later than 10 days after--
                            ``(i) the applicant takes any steps
                        specified under subparagraph (A)(ii)(I); and
                            ``(ii) the agency takes the actions
                        described in subparagraph (A)(ii)(II) in
                        accordance with any applicable timelines and
                        deadlines.''.

SEC. 2224. GEOTHERMAL OMBUDSMAN AND PERMITTING TASK FORCE.

    (a) Definitions.--In this section:
            (1) Bureau.--The term ``Bureau'' means the Bureau of Land
        Management.
            (2) Geothermal authorization.--The term ``geothermal
        authorization'' means any license, permit, approval, finding,
        determination, or other administrative decision issued by the
        Bureau (including any interagency consultation) that is
        required or authorized under Federal law in order to site,
        construct, reconstruct, or commence operation of a project
        that--
                    (A) is located in whole or in part on land subject
                to geothermal leasing under section 3 of the Geothermal
                Steam Act of 1970 (30 U.S.C. 1002); and
                    (B) uses geothermal energy to generate heat or
                electricity.
            (3) Geothermal ombudsman.--The term ``Geothermal
        Ombudsman'' means the Geothermal Ombudsman appointed under
        subsection (b)(1).
            (4) Task force.--The term ``Task Force'' means the
        Geothermal Permitting Task Force established under subsection
        (c)(1).
    (b) Geothermal Ombudsman.--
            (1) In general.--Not later than 60 days after the date of
        enactment of this Act, the Secretary of the Interior shall
        appoint from within the Bureau an individual to serve as
        Geothermal Ombudsman.
            (2) Duties.--The Geothermal Ombudsman shall--
                    (A) act as a liaison between--
                            (i) the individual field, district, and
                        State offices of the Bureau;
                            (ii) the Division Chief of the National
                        Renewable Energy Coordination Office of the
                        Bureau; and
                            (iii) the Director of the Bureau;
                    (B) provide dispute resolution services for
                disputes between the individual field, district, and
                State offices of the Bureau and applicants for
                geothermal authorizations;
                    (C) monitor and facilitate permit processing
                practices and timelines across individual field offices
                of the Bureau;
                    (D) develop best practices for the permitting and
                leasing process for geothermal resources; and
                    (E) coordinate with the Federal Permitting
                Improvement Steering Council.
    (c) Geothermal Permitting Task Force.--
            (1) Establishment.--Not later than 60 days after the date
        of enactment of this Act, the Secretary of the Interior shall
        establish within the Bureau a task force, to be known as the
        ``Geothermal Permitting Task Force''.
            (2) Leadership.--The Task Force shall be headed by the
        Geothermal Ombudsman.
            (3) Permitting support.--The Task Force shall support the
        duties of the Geothermal Ombudsman under subsection (b).
            (4) Cross-office personnel assignments.--
                    (A) In general.--The Geothermal Ombudsman, acting
                as head of the Task Force, may coordinate with any
                bureau or office of the Department of the Interior to
                assign personnel with relevant expertise to assist with
                the completion of geothermal authorizations in Bureau
                field, district, or State offices other than the
                official duty stations at which such personnel are
                located if--
                            (i) the applicable bureau or office
                        determines that such an assignment will not
                        materially delay ongoing completion of
                        geothermal authorizations within the applicable
                        official duty station; and
                            (ii) approval is received from the head of
                        that official duty station.
                    (B) Assigned personnel requirements.--An employee
                assigned to assist with the completion of geothermal
                authorizations pursuant to subparagraph (A) shall--
                            (i) work in-person full-time at an official
                        office of the Department of the Interior;
                            (ii) as the Geothermal Ombudsman determines
                        to be necessary, travel to the Bureau field,
                        district, or State office with jurisdiction
                        over the geothermal authorizations to which the
                        employee has been assigned;
                            (iii) participate as part of the team of
                        personnel working on geothermal authorizations
                        to which the employee has been assigned; and
                            (iv) regularly report to the head of the
                        Bureau field, district, or State office with
                        jurisdiction over the geothermal authorizations
                        to which the employee has been assigned.
                    (C) Retention allowances.--
                            (i) In general.--Subject to the
                        availability of appropriations, the Geothermal
                        Ombudsman may pay a retention allowance to an
                        employee assigned to assist with the completion
                        of geothermal authorizations under subparagraph
                        (A).
                            (ii) Requirements.--A retention allowance
                        under clause (i)--
                                    (I) shall be stated as the
                                percentage of the rate of basic pay of
                                the applicable employee, subject to the
                                condition that such an allowance may
                                not exceed 25 percent of that rate of
                                basic pay;
                                    (II) may not be considered to be
                                part of the basic pay of the employee;
                                    (III) may not be appealed on
                                reduction or elimination; and
                                    (IV) shall be paid at the same time
                                and in the same manner as the basic pay
                                of the employee is paid.
                            (iii) Factors for consideration.--In paying
                        a retention allowance under clause (i), the
                        Geothermal Ombudsman shall take into
                        consideration--
                                    (I) any specialized expertise of
                                the applicable employee relating to
                                geothermal authorizations;
                                    (II) the demonstrated need to
                                retain an employee to meet the
                                performance improvement objectives for
                                geothermal authorization timelines and
                                develop best practices for completion
                                of geothermal authorizations; and
                                    (III) the difficulty in recruiting
                                or replacing qualified personnel with
                                relevant expertise relating to
                                geothermal authorizations.
                    (D) Savings clause.--The assignment of personnel
                pursuant to this paragraph shall not alter the
                underlying jurisdiction of any office of the Bureau
                with respect to geothermal authorizations.
    (d) Report.--The Geothermal Ombudsman shall submit to the Committee
on Energy and Natural Resources of the Senate and the Committee on
Natural Resources of the House of Representatives an annual report
that--
            (1) describes the activities of the Task Force during the
        preceding year; and
            (2) evaluates the effectiveness of geothermal authorization
        processing during the preceding year.

SEC. 2225. NO FEDERAL PERMIT REQUIRED FOR GEOTHERMAL ACTIVITIES ON
              CERTAIN LAND.

    The Geothermal Steam Act of 1970 (30 U.S.C. 1001 et seq.) (as
amended by section 2221) is amended by adding at the end the following:

``SEC. 31. NO FEDERAL PERMIT REQUIRED FOR GEOTHERMAL ACTIVITIES ON
              CERTAIN LAND.

    ``(a) Exploration and Production Activities.--The Secretary shall
not require an operator to obtain a Federal drilling permit for
geothermal exploration and production activities conducted on a non-
Federal surface estate, provided that--
            ``(1) the United States holds an ownership interest of less
        than 50 percent of the subsurface geothermal resources to be
        accessed by the proposed action;
            ``(2) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        enters and produces from the Federal mineral estate subject to
        the lease; or
            ``(3) the well is located on non-Federal land overlying a
        non-Federal mineral estate, but some portion of the wellbore
        traverses but does not produce from the Federal minerals or
        mineral estate subject to the lease.
    ``(b) Notification.--For each State permit to drill or drilling
plan that would impact or extract geothermal resources owned by the
Federal Government--
            ``(1) each lessee of Federal geothermal resources in the
        unit, or designee of a lessee, shall--
                    ``(A) notify the Secretary of the submission of a
                State application for a permit to drill or drilling
                plan on submission of the application; and
                    ``(B) provide a copy of the application described
                in subparagraph (A) to the Secretary not later than 5
                days after the date on which the permit or plan is
                submitted; and
            ``(2) each lessee, designee of a lessee, or applicable
        State shall notify the Secretary of the approved State permit
        to drill or drilling plan not later than 45 days after the date
        on which the permit or plan is approved.
    ``(c) Nonapplicability to Indian Land.--Subsection (a) shall not
apply to--
            ``(1) any land located within the boundaries of an Indian
        reservation, pueblo, or rancheria; or
            ``(2) any land not located within the boundaries of an
        Indian reservation, pueblo, or rancheria, the title to which is
        held--
                    ``(A) in trust by the United States for the benefit
                of an Indian Tribe or an individual Indian;
                    ``(B) by an Indian Tribe or an individual Indian,
                subject to restriction against alienation under laws of
                the United States; or
                    ``(C) by a dependent Indian community.
    ``(d) Effect.--
            ``(1) In general.--Nothing in this section shall affect the
        amount of royalties due to the United States under this Act
        from the production of electricity using geothermal resources
        (other than direct use of geothermal resources) or the
        production of any byproducts.
            ``(2) Onsite reviews and inspections.--The Secretary may
        conduct onsite reviews and inspections to ensure proper
        accountability, measurement, and reporting of the production
        described in subsection (a), and payment of royalties.''.

SEC. 2226. EFFECT OF PENDING CIVIL ACTIONS ON PROCESSING APPLICATIONS
              RELATING TO GEOTHERMAL LEASING.

    Section 4 of the Geothermal Steam Act of 1970 (30 U.S.C. 1003) (as
amended by section 2223(b)) is amended by adding at the end the
following:
    ``(i) Effect of Pending Civil Actions on Processing Applications
Relating to Geothermal Leasing.--
            ``(1) Definition of authorization.--In this subsection, the
        term `authorization' means any license, permit, approval,
        finding, determination, or other administrative decision issued
        by a Federal agency, or any interagency consultation, that is
        required or authorized under Federal law (including
        regulations) in order to site, construct, reconstruct, or
        commence operation of a geothermal project administered by a
        Federal agency.
            ``(2) Requirement to process applications.--Notwithstanding
        any pending civil action that affects an application for a
        geothermal drilling permit, sundry notice, notice to proceed,
        right-of-way, or any other authorization under a valid existing
        geothermal lease, the Secretary shall, unless a Federal court
        vacates or provides injunctive relief for the applicable
        geothermal lease, geothermal drilling permit, sundry notice,
        notice to proceed, right-of-way, or other authorization,
        approve and issue, or deny, each such application not later
        than 60 days after completing all requirements under applicable
        Federal laws (including regulations), including the National
        Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.), the
        Endangered Species Act of 1973 (16 U.S.C. 1531 et seq.), and
        division A of subtitle III of title 54, United States Code.
            ``(3) No new authority for federal courts.--Nothing in this
        subsection modifies any existing authority of a Federal court
        to vacate or provide injunctive relief for a geothermal lease,
        geothermal drilling permit, sundry notice, notice to proceed,
        right-of-way, or other authorization.''.

SEC. 2227. COST RECOVERY FROM GEOTHERMAL LEASING, PERMITTING, AND
              INSPECTIONS.

    (a) In General.--Section 6 of the Geothermal Steam Act of 1970 (30
U.S.C. 1005) is amended by adding at the end the following:
    ``(j) Cost Recovery.--
            ``(1) In general.--During the period beginning on the date
        of enactment of the Bipartisan American Affordability and Jobs
        Act of 2026 and ending on September 30, 2033, the Secretary may
        require an applicant for, or holder of, a geothermal lease to
        reimburse the United States for all reasonable administrative
        and other costs incurred by the United States from--
                    ``(A) processing the application for the geothermal
                lease, including any application for an operations
                plan, geothermal drilling permit, utilization plan,
                site license, facility construction permit, commercial
                use permit, and any other approval associated with a
                geothermal lease; and
                    ``(B) inspecting and monitoring--
                            ``(i) geophysical exploration activities;
                            ``(ii) the drilling, plugging, or
                        abandonment of wells; and
                            ``(iii) the construction, operation,
                        termination, or reclamation of any well site or
                        facility for the utilization of geothermal
                        resources pursuant to the geothermal lease.
            ``(2) Factor for consideration.--In determining whether to
        require reimbursement under paragraph (1), the Secretary shall
        take into consideration whether there is in existence a
        cooperative cost-share agreement between the United States and
        the holder of a geothermal lease.
            ``(3) Adjustments.--The Secretary may reduce the amount
        required to be reimbursed under paragraph (1) if the Secretary
        determines that--
                    ``(A) full reimbursement would impose on the
                applicant an economic hardship; or
                    ``(B) a less-than-full reimbursement is necessary
                to promote the greatest use of geothermal resources.
            ``(4) Use.--The amounts reimbursed under this subsection
        shall be--
                    ``(A) credited to the currently applicable
                appropriation, account, or fund of the Department of
                the Interior as discretionary offsetting collections;
                and
                    ``(B) available only to the extent provided in
                advance in appropriations Acts for--
                            ``(i) processing applications for
                        geothermal leases, including any applications
                        for operations plans, geothermal drilling
                        permits, utilization plans, site licenses,
                        facility construction permits, commercial use
                        permits, and any other approval associated with
                        geothermal leases; and
                            ``(ii) inspecting and monitoring--
                                    ``(I) geophysical exploration
                                activities;
                                    ``(II) the drilling, plugging, or
                                abandonment of wells; and
                                    ``(III) the construction,
                                operation, termination, or reclamation
                                of any well site or facility for the
                                utilization of geothermal resources
                                pursuant to geothermal leases.''.
    (b) Report.--
            (1) In general.--Not later than 5 years after the date of
        enactment of this Act, the Secretary of the Interior, in
        consultation with representatives of the geothermal industry
        and other stakeholders, shall submit to the Committee on Energy
        and Natural Resources of the Senate and the Committee on
        Natural Resources of the House of Representatives, and make
        publicly available on the website of the Department of the
        Interior, a report that includes--
                    (A) an assessment of how the amendment made by
                subsection (a) affected the geothermal program of the
                Bureau of Land Management;
                    (B) any recommendations for reauthorization of
                subsection (j) of section 6 of the Geothermal Steam Act
                of 1970 (30 U.S.C. 1005) (as added by subsection (a));
                and
                    (C) any other recommendations for updates to--
                            (i) subsection (j) of section 6 of the
                        Geothermal Steam Act of 1970 (30 U.S.C. 1005)
                        (as so added); or
                            (ii) the geothermal program of the Bureau
                        of Land Management.
            (2) Considerations.--In developing the report under
        paragraph (1), the Secretary of the Interior shall solicit
        facts or information from representatives of the geothermal
        industry and other stakeholders.

SEC. 2228. PUBLICATION OF GOLD BOOK FOR GEOTHERMAL OPERATIONS ON
              FEDERAL LAND.

    (a) Identification.--Not later than 1 year after the date of
enactment of this Act, the Secretary of the Interior, in consultation
with other relevant Federal agencies, shall identify standard
procedures and guidelines for efficient and environmentally responsible
geothermal leasing and permitting to the extent such standard
procedures and guidelines are not addressed in the fourth edition of
the document of the Bureau of Land Management entitled ``Surface
Operating Standards and Guidelines for Oil and Gas Exploration and
Development'', commonly known as the ``Gold Book'', and most recently
revised in 2007.
    (b) Publication.--
            (1) In general.--Not later than 270 days after identifying
        standard procedures and guidelines under subsection (a), the
        Secretary of the Interior shall publish an updated version of
        the Gold Book, incorporating any changes necessary to support
        efficient and environmentally responsible geothermal leasing
        and permitting, for use by the field offices of the Bureau of
        Land Management and geothermal operators.
            (2) Renaming.--The Secretary of the Interior shall rename
        the Gold Book as the Secretary determines to be appropriate to
        reflect the incorporation of standard procedures and guidelines
        relating to geothermal development.
    (c) Consultation.--Before publishing an updated version of the Gold
Book under subsection (b)(1), the Secretary of the Interior shall
consult with--
            (1) other relevant Federal agencies, including field
        offices of the Bureau of Land Management; and
            (2) outside stakeholders, including developers and other
        experts.
    (d) Periodic Revision.--The Secretary of the Interior shall--
            (1) not less frequently than once every 5 years, review the
        most recent version of the Gold Book (or a successor to that
        book); and
            (2) as the Secretary of the Interior determines to be
        necessary to support efficient and environmentally responsible
        geothermal leasing and permitting, publish an updated version
        of the Gold Book (or a successor).
    (e) Inclusions.--Each updated version of the Gold Book (or a
successor to that book) shall include standard procedures and
guidelines for ensuring the efficient review and approval of
environmentally responsible geothermal development, including--
            (1) exploration and geophysical operations;
            (2) permitting lease operations;
            (3) compliance with all applicable laws (including
        regulations);
            (4) construction and maintenance; and
            (5) drilling, production, and utilization operations.

SEC. 2229. NEPA REVIEW.

    Section 390 of the Energy Policy Act of 2005 (42 U.S.C. 15942) is
amended--
            (1) by striking subsection (a) and inserting the following:
    ``(a) NEPA Review.--Action by the Secretary of the Interior in
managing public land, or the Secretary of Agriculture in managing
National Forest System land, with respect to an activity described in
subsection (b) shall not be considered a major Federal action under the
National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) if
the activity is conducted pursuant to the Mineral Leasing Act (30
U.S.C. 181 et seq.) or the Geothermal Steam Act of 1970 (30 U.S.C. 1001
et seq.) for the purpose of exploration or development of oil, gas, or
geothermal resources.'';
            (2) in subsection (b)--
                    (A) in paragraph (2), by striking ``or gas'' and
                inserting ``, gas, or geothermal'';
                    (B) in paragraph (3), by striking ``or gas'' and
                inserting ``, gas, or geothermal'';
                    (C) by striking ``NEPA'' each place it appears and
                inserting ``the National Environmental Policy Act of
                1969 (42 U.S.C. 4321 et seq.)'';
                    (D) in paragraph (4), by striking ``5'' and
                inserting ``10'';
                    (E) by redesignating paragraph (5) as paragraph
                (6); and
                    (F) by inserting after paragraph (4) the following:
            ``(5) For the purposes of geothermal, placement of an
        electric transmission or distribution line of not more than 20
        miles in length in an approved right-of-way corridor, so long
        as the corridor was approved within 10 years prior to the date
        of placement of the transmission or distribution line.''; and
            (3) by adding at the end the following:
    ``(c) Effect.--
            ``(1) In general.--Nothing in this section affects the
        requirement for a drilling permit for the conduct of any
        activity described in subsection (b) pursuant to--
                    ``(A) the Mineral Leasing Act (30 U.S.C. 181 et
                seq.); or
                    ``(B) the Geothermal Steam Act of 1970 (30 U.S.C.
                1001 et seq.).
            ``(2) Requirements.--Notwithstanding section 17(p)(2)(A) of
        the Mineral Leasing Act (30 U.S.C. 226(p)(2)(A)), subsection
        (h)(2)(A)(i) of section 4 of the Geothermal Steam Act of 1970
        (30 U.S.C. 1003), or title V of the Federal Land Policy and
        Management Act of 1976 (43 U.S.C. 1761 et seq.), activities
        described in subsection (b) that require a drilling permit
        under the Mineral Leasing Act (30 U.S.C. 181 et seq.) or a
        geothermal drilling permit under the Geothermal Steam Act of
        1970 (30 U.S.C. 1001 et seq.) shall not have any requirements
        under the National Environmental Policy Act of 1969 (42 U.S.C.
        4321 et seq.).''.

                         Subtitle D--Hydropower

SEC. 2231. IDENTIFYING AND REMOVING MARKET BARRIERS TO HYDROPOWER.

    (a) Definition of Commission.--In this section, the term
``Commission'' means the Federal Energy Regulatory Commission.
    (b) Report on Hydropower Market Barriers.--
            (1) In general.--Not later than 270 days after the date of
        enactment of this Act, the Commission, in consultation with the
        Secretary of Energy, shall submit to the Committee on Energy
        and Natural Resources of the Senate and the Committee on Energy
        and Commerce of the House of Representatives a report--
                    (A) describing any market barriers to the
                development and proper compensation of conventional,
                storage, conduit, and emerging hydropower technologies
                related to--
                            (i) rules of Transmission Organizations (as
                        defined in section 3 of the Federal Power Act
                        (16 U.S.C. 796));
                            (ii) regulations or policies--
                                    (I) of the Commission; or
                                    (II) under the Federal Power Act
                                (16 U.S.C. 791a et seq.); or
                            (iii) other Federal and State laws and
                        policies unique to hydropower development,
                        operation, and regulation, as compared to other
                        sources of electricity;
                    (B) containing recommendations of the Commission
                for reducing market barriers described in subparagraph
                (A);
                    (C) identifying and determining any regulatory,
                market, procurement, or cost recovery mechanisms that
                would--
                            (i) encourage development of conventional,
                        storage, conduit, and emerging hydropower
                        technologies; and
                            (ii) properly compensate conventional,
                        storage, conduit, and emerging hydropower
                        technologies for the full range of services
                        provided to the electric grid, including--
                                    (I) balancing electricity supply
                                and demand;
                                    (II) ensuring grid reliability;
                                    (III) providing ancillary services;
                                    (IV) contributing to the
                                decarbonization of the electric grid;
                                and
                                    (V) integrating intermittent power
                                sources into the grid in a cost-
                                effective manner; and
                    (D) identifying ownership and development models
                that could reduce market barriers to the development of
                conventional, storage, conduit, and emerging hydropower
                technologies, including--
                            (i) opportunities for risk-sharing
                        mechanisms and partnerships, including co-
                        ownership models; and
                            (ii) opportunities to foster lease-sale and
                        lease-back arrangements with publicly owned
                        electric utilities.
            (2) Technical conference and public comment.--In preparing
        the report under paragraph (1), the Commission shall solicit
        public input, including by convening a technical conference and
        providing an opportunity for public submission of written
        comments on a draft report.

SEC. 2232. CERTAIN CONDITIONS ON ISSUANCE OF LICENSES.

    Section 4(e) of the Federal Power Act (16 U.S.C. 797(e)) is
amended, in the first proviso, by inserting ``and are reasonably
related to the effects of the project'' after ``of such reservation''.

SEC. 2233. HYDROPOWER MAINTENANCE AND TEMPORARY ADJUSTMENTS.

    (a) Alterations in Project Works.--Section 10(b) of the Federal
Power Act (16 U.S.C. 803(b)) is amended by adding at the end the
following: ``Except as previously provided in this subsection, the
Commission shall require prior approval of a `substantial alteration or
addition' to project works or to project operations consisting of any
significant modification of the project works or operation of the
project that is not in conformity with the project plans previously
approved by the Commission. The Commission shall not require approval
of any alteration or addition as determined pursuant to regulations
promulgated under section 2233(c) of the Bipartisan American
Affordability and Jobs Act of 2026 or any temporary variance to the
project operations necessitated by circumstances beyond the reasonable
control of the licensee, including extreme weather, natural disasters,
equipment failures, or other unforeseen circumstances.''.
    (b) Maintenance and Repair of Project Works.--Section 10(c) of the
Federal Power Act (16 U.S.C. 803(c)) is amended by inserting after the
first sentence the following: ``The Commission shall not require
approval or an amendment to a project license for any routine
maintenance, repair, or replacement of any portion of a project works
necessary to maintain the project works in accordance with this
subsection.''.
    (c) Guidance and Process.--
            (1) Guidance.--Not later than 90 days after the date of
        enactment of this Act, the Federal Energy Regulatory Commission
        shall issue a notice of proposed rulemaking proposing a process
        or considerations for determining a ``substantial alteration or
        addition'', ``nonsubstantial alteration or addition'', and
        ``routine maintenance, repair, or replacement'' to a hydropower
        project works based on the results of the Notice of Inquiry of
        the Federal Energy Regulatory Commission entitled
        ``Authorizations for Certain Post-Licensing Activities at
        Hydroelectric Projects'' (90 Fed. Reg. 53310; Docket No. RM26-
        3-000) issued on November 20, 2025, initially scheduled to
        close on January 26, 2026, but extended and officially closed
        on February 10, 2026.
            (2) Process.--Not later than 180 days after the date of the
        issuance of the notice of proposed rulemaking under paragraph
        (1), and after public notice and opportunity for comment, the
        Federal Energy Regulatory Commission shall promulgate a final
        rule establishing--
                    (A) standards for determining a ``substantial
                alteration or addition'', ``nonsubstantial alteration
                or addition'', and ``routine maintenance, repair, or
                replacement'' to a hydropower project works; and
                    (B) a formal process, as appropriate, for
                determining whether a proposed alteration or addition
                constitutes a ``substantial alteration or addition''
                under the final rule that requires approval of the
                Federal Energy Regulatory Commission under section
                10(b) of the Federal Power Act (16 U.S.C. 803(b)).
            (3) Effect.--The rule promulgated under paragraph (2) shall
        establish a process or considerations for determining which
        licensee-requested project alterations require the approval of
        the Federal Energy Regulatory Commission.
    (d) Savings Clause.--Nothing in this section or an amendment made
by this section--
            (1) affects any authority of the Commission--
                    (A) to require notice from a licensee under
                subsection (a) or (b) of section 10 of the Federal
                Power Act (16 U.S.C. 803); or
                    (B) to enforce requirements of that section or the
                terms of a license issued under part I of the Federal
                Power Act (16 U.S.C. 792 et seq.) with respect to the
                safety of any dam and appurtenant works and structures;
                or
            (2)(A) precludes any prompt, informal consultation between
        the licensee and the Commission, at the request of the licensee
        or the Commission, with respect to the safety of any dam and
        appurtenant works and structures in advance of work to be
        undertaken under section 10 of the Federal Power Act (16 U.S.C.
        803); or
            (B) affects any authority of the Commission to require
        changes in advance of the work described in subparagraph (A) to
        protect the safety of any dam and appurtenant works and
        structures.

SEC. 2234. MICRO HYDROKINETIC ENERGY PROJECTS.

    Part I of the Federal Power Act (16 U.S.C. 792 et seq.) is amended
by adding at the end the following:

``SEC. 38. LICENSING OF MICRO HYDROKINETIC ENERGY PROJECTS.

    ``(a) Definition of Micro Hydrokinetic Energy Project.--In this
section, the term `micro hydrokinetic energy project'--
            ``(1) means a project that--
                    ``(A) has an installed capacity of not more than 5
                megawatts; and
                    ``(B) converts to electric energy the hydrokinetic
                energy from a generator driven by a turbine from--
                            ``(i) waves, tides, or currents in oceans,
                        estuaries, or tidal areas; or
                            ``(ii) free flowing water in rivers, lakes,
                        streams, or man-made channels; and
            ``(2) does not include a project that impounds water to
        generate electricity.
    ``(b) Authorization.--The Commission may issue a license in
accordance with this section for a term of not less than 10, and not
more than 20, years for the construction, operation, and maintenance of
project works for a micro hydrokinetic energy project.
    ``(c) Expedited Licensing Process.--
            ``(1) Notification of intent.--
                    ``(A) Filing of notification.--An applicant for a
                license under this section shall commence the licensing
                process by filing a notification of intent with the
                Commission.
                    ``(B) Existing license deadline.--Notwithstanding
                section 15(b)(1), an applicant for a license under this
                section shall file a notification of intent under
                subparagraph (A) not later than 2 years before the
                expiration of an existing license, if applicable.
            ``(2) Filing of application.--
                    ``(A) In general.--Except as provided in
                subparagraph (B), an applicant for a license under this
                section shall submit to the Commission an application
                not later than 1 year after the date on which the
                applicant files a notification of intent under
                paragraph (1).
                    ``(B) Existing license deadline.--Notwithstanding
                section 15(c)(1), an applicant for a license under this
                section shall file an application with the Commission
                not later than 1 year before the date of expiration of
                the term of an existing license, if applicable.
            ``(3) Deadline for issuance.--The Commission shall take
        final action on an application for a license under this section
        not later than 1 year after the date on which the application
        is filed under paragraph (2).
            ``(4) Schedule for final action.--To the extent reasonably
        practicable, the Commission and any applicable conditioning or
        permitting agencies shall establish, with respect to each micro
        hydrokinetic energy project that is the subject of a
        notification of intent to apply for a license under this
        section, a joint schedule that permits the timely completion of
        decisions required to be made with respect to, and the timely
        issuance of, authorizations required under Federal law by the
        Commission and the conditioning or permitting agencies, subject
        to the requirement that any joint schedule established under
        this paragraph shall comply with the deadline for final action
        established under paragraph (3).
    ``(d) Regulations.--
            ``(1) In general.--Not later than 180 days after the date
        of enactment of this section, the Commission shall promulgate
        regulations to implement this section in a manner that
        expedites the deployment of micro hydrokinetic energy projects
        while ensuring the safe operation of the micro hydrokinetic
        energy project in compliance with applicable Federal and State
        laws.
            ``(2) Inclusion.--The regulations promulgated under
        paragraph (1) shall provide for the use of 1 or more
        categorical exclusions, including allowing for extraordinary
        circumstances under which the categorical exclusion shall not
        be available, under the National Environmental Policy Act of
        1969 (42 U.S.C. 4321 et seq.) for low disturbance activities
        necessary for micro hydrokinetic energy projects.
    ``(e) Report to Congress.--The Commission shall submit to Congress
a report describing the impacts of the micro hydrokinetic energy
projects licensed under this section on the environment, the economy,
and the reliability and affordability of electricity not later than the
earlier of--
            ``(1) the date that is 5 years after the date of enactment
        of this section; and
            ``(2) the date on which the first 50 micro hydrokinetic
        energy projects licensed under this section have been
        operational for not less than 1 year.
    ``(f) Savings Clause.--Nothing in this section affects any
authority of the Commission, at the election of an applicant, to
license the construction, operation, and maintenance of project works
for a micro hydrokinetic energy project under any other provision of
this part.''.

                    Subtitle E--Hiring and Retention

SEC. 2241. FEDERAL ENERGY REGULATORY COMMISSION STAFFING.

    Section 401(k) of the Department of Energy Organization Act (42
U.S.C. 7171(k)) is amended--
            (1) by striking paragraphs (1) through (6) and inserting
        the following:
            ``(1) Employee compensation program.--
                    ``(A) In general.--Notwithstanding any other
                provision of law, rule, regulation, or directive
                relating to the payment of Federal employees (other
                than chapters 83 and 84 of title 5, United States
                Code), the Chairman of the Commission (referred to in
                this subsection as the `Chairman') shall develop,
                implement, and, as appropriate, update based on the
                results of an annual review under paragraph (4), a
                compensation plan that specifies and fixes the
                compensation (including salary or any other pay,
                bonuses, benefits, incentives, and any other form of
                remuneration) for employees of the Commission.
                    ``(B) Implementation.--Not later than 1 year after
                the date of enactment of the Bipartisan American
                Affordability and Jobs Act of 2026, the Chairman shall
                develop and implement the initial compensation plan
                under subparagraph (A).
            ``(2) Requirements.--A compensation plan developed under
        paragraph (1) shall--
                    ``(A) be informed by an annual survey of prevailing
                compensation for positions comparable to those of the
                Commission in relevant public- and private-sector labor
                markets;
                    ``(B) be consistent with the approved annual budget
                of the Commission;
                    ``(C) take into account education, experience,
                level of responsibility, geographic differences, labor
                market conditions, scarcity of specialized expertise,
                and recruitment and retention needs;
                    ``(D) seek to maintain total compensation for each
                position that is competitive with compensation for
                comparable positions in the labor markets most relevant
                to that position, as determined by the Chairman based
                on the survey under subparagraph (A); and
                    ``(E) support the timely, efficient, and effective
                performance of the functions of the Commission.
            ``(3) Authority to fix compensation.--In developing and
        implementing the compensation plan under paragraph (1), the
        Chairman may classify positions and fix compensation without
        regard to chapter 51, subchapter III of chapter 53, and
        sections 5307 and 5373 of title 5, United States Code, or any
        other civil service law to the extent that such a law governs
        position classification, rates of basic pay, bonuses, awards,
        incentives, allowances, benefits, or aggregate limitations on
        compensation.
            ``(4) Annual review.--
                    ``(A) In general.--Annually, the Chairman shall
                review and update, as appropriate, the compensation
                plan developed under paragraph (1).
                    ``(B) Review considerations.--In conducting the
                annual review, the Chairman shall consider--
                            ``(i) workforce vacancies and hiring needs;
                            ``(ii) recruitment and retention outcomes;
                            ``(iii) changes in relevant labor market
                        compensation;
                            ``(iv) internal compensation equity;
                            ``(v) mission-critical workforce
                        requirements; and
                            ``(vi) the availability of amounts
                        appropriated to the Commission.
            ``(5) Application of other civil service laws.--
                    ``(A) In general.--Except as expressly provided in
                this subsection, employees of the Commission shall
                remain subject to otherwise-applicable civil service
                laws, including merit system principles and prohibited
                personnel practices under sections 2301 and 2302 of
                title 5, United States Code.
                    ``(B) Effect.--Nothing in this subsection affects
                the eligibility of any employee of the Commission for,
                or the application to such an employee of, chapter 83,
                84, 87, 89, 89A, 89B, or 90 of title 5, United States
                Code.''; and
            (2) by redesignating paragraph (7) as paragraph (6).

SEC. 2242. FEDERAL ENERGY REGULATORY COMMISSION PERSONNEL SAFETY.

    The Federal Energy Regulatory Commission may authorize employees of
the Federal Energy Regulatory Commission to perform law enforcement
duties, and to exercise the powers necessary to perform such duties, as
needed to ensure the safety of the Chairman and Commissioners of the
Federal Energy Regulatory Commission in the performance of the official
duties of the Chairman and Commissioners, respectively.

                      Subtitle F--Offshore Energy

SEC. 2251. OFFSHORE ENERGY.

    (a) Outer Continental Shelf Lands Act.--Section 8(p) of the Outer
Continental Shelf Lands Act (43 U.S.C. 1337(p)) is amended--
            (1) in paragraph (4)(I), by striking ``prevention of
        interference with reasonable uses'' and inserting ``prevention
        of unreasonable interference with other uses'';
            (2) by striking paragraph (10) and inserting the following:
            ``(10) Applicability.--
                    ``(A) In general.--Except as provided in
                subparagraph (B), this subsection does not apply to any
                area on the outer Continental Shelf within the exterior
                boundaries of any unit of the National Park System, the
                National Wildlife Refuge System, the National Marine
                Sanctuary System, or any National Monument.
                    ``(B) Exception.--Notwithstanding subparagraph (A),
                the Secretary, in consultation with the Secretary of
                Commerce under section 304(d) of the National Marine
                Sanctuaries Act (16 U.S.C. 1434(d)), may grant rights-
                of-way on the outer Continental Shelf within units of
                the National Marine Sanctuary System for the
                transmission of electricity.''; and
            (3) by adding at the end the following:
            ``(11) Duration of permits in marine sanctuaries.--
        Notwithstanding section 310(c)(2) of the National Marine
        Sanctuaries Act (16 U.S.C. 1441(c)(2)), any permit or
        authorization granted under that Act that authorizes the
        installation, operation, or maintenance of electric
        transmission cables on a right-of-way granted by the Secretary
        described in paragraph (10)(B) shall be issued for a term equal
        to the duration of the right-of-way granted by the
        Secretary.''.
    (b) Savings Clause.--Nothing in this section, or an amendment made
by this section, modifies the limitations described in section
50265(b)(2) of Public Law 117-169 (43 U.S.C. 3006(b)(2)).

SEC. 2252. OFFSHORE ENERGY TRANSMISSION.

    (a) Definitions.--In this section:
            (1) Backbone line.--The term ``backbone line'' means a
        transmission line that connects multiple offshore transmission
        substations.
            (2) Federal authorization.--
                    (A) In general.--The term ``Federal authorization''
                means any authorization required under Federal law in
                order to site an offshore transmission facility.
                    (B) Inclusions.--The term ``Federal authorization''
                includes such permits, special use authorizations,
                certifications, opinions, or other approvals as may be
                required under Federal law in order to site an offshore
                transmission facility.
            (3) Offshore generation facility.--The term ``offshore
        generation facility'' means a facility that--
                    (A) is located on the outer Continental Shelf; and
                    (B) produces electric energy.
            (4) Offshore transmission facility.--
                    (A) In general.--The term ``offshore transmission
                facility'' means a facility, such as a line or cable,
                and any related infrastructure or equipment, such as a
                substation or converter station, that is used for the
                transmission of electric energy--
                            (i) between 2 or more offshore generation
                        facilities, including--
                                    (I) offshore generation facilities
                                within a single offshore energy
                                project; and
                                    (II) offshore generation facilities
                                in different offshore energy projects;
                                or
                            (ii) between 1 or more offshore generation
                        facilities and an interconnection with an
                        onshore electric grid.
                    (B) Inclusions.--The term ``offshore transmission
                facility'' includes a radial line, a backbone line, and
                any transmission line.
            (5) Optimal point of interconnection.--The term ``optimal
        point of interconnection'' means a point of interconnection
        that minimizes--
                    (A) delays;
                    (B) local impacts; and
                    (C) the need for grid updates.
            (6) Outer continental shelf.--The term ``outer Continental
        Shelf'' has the meaning given the term in section 2 of the
        Outer Continental Shelf Lands Act (43 U.S.C. 1331).
            (7) Radial line.--The term ``radial line'' means a
        transmission line that is used to link 1 or more offshore
        energy projects to the bulk-power system (as defined in section
        215(a) of the Federal Power Act (16 U.S.C. 824o(a))).
            (8) Secretary.--The term ``Secretary'' means the Secretary
        of the Interior.
            (9) State.--The term ``State'' has the meaning given the
        term in section 2 of the Outer Continental Shelf Lands Act (43
        U.S.C. 1331).
    (b) Identification of Preferred Routes.--
            (1) In general.--
                    (A) Initial identification.--Not later than 2 years
                after the date of enactment of this Act, the Secretary
                and the Secretary of Energy (referred to in this
                subsection as the ``Secretaries''), in coordination
                with relevant Federal agencies involved in the
                permitting of offshore generation facilities and
                offshore transmission facilities, shall identify
                preferred routes on the outer Continental Shelf for
                transmission cables and sub-seabed infrastructure
                (where such routes have not yet been identified),
                including--
                            (i) between offshore generation facilities;
                        and
                            (ii) between offshore generation facilities
                        and optimal points of interconnection with
                        onshore electric grids.
                    (B) Periodic review.--Not less frequently than once
                every 3 years after the initial identification of
                preferred routes in accordance with subparagraph (A),
                the Secretaries, in coordination with relevant Federal
                agencies involved in the permitting of offshore
                generation facilities and offshore transmission
                facilities, shall--
                            (i) determine whether additional preferred
                        routes are needed; and
                            (ii) if applicable, identify any additional
                        preferred routes.
            (2) Considerations.--In identifying preferred routes under
        paragraph (1), the Secretaries shall take into account--
                    (A) existing rights-of-way and existing sub-seabed
                infrastructure;
                    (B) the optimal points of interconnection between
                offshore generation facilities and onshore electric
                grids; and
                    (C) impacts on the marine environment, including
                critical habitats or protected areas, marine organisms,
                including protected or endangered species, and other
                ocean users, including fisheries.
    (c) Siting, Permitting, and Authorizations.--
            (1) Lead agency.--With respect to an offshore transmission
        facility, the Department of the Interior shall act as the lead
        agency for purposes of coordinating all applicable Federal
        authorizations and related environmental reviews of the
        facility.
            (2) Rulemaking.--
                    (A) In general.--Not later than 2 years after the
                date of enactment of this Act, the Secretary, in
                coordination with other relevant Federal agencies,
                shall issue, pursuant to section 5 of the Outer
                Continental Shelf Lands Act (43 U.S.C. 1334), a final
                rule relating to Federal authorizations for offshore
                transmission facilities.
                    (B) Considerations.--In carrying out subparagraph
                (A), the Secretary shall consider--
                            (i) establishing 1 or more procedures for
                        soliciting information about existing and
                        potential rights-of-way;
                            (ii) establishing a process for determining
                        interest in the use of 1 or more rights-of-way,
                        including backboned or meshed rights-of-way;
                            (iii) establishing a process for the
                        issuance of rights-of-way, on a competitive or
                        noncompetitive basis, as appropriate, which may
                        include consideration of whether a developer--
                                    (I) has an award from a State via a
                                competitive process;
                                    (II) has an existing agreement to
                                interconnect a transmission project; or
                                    (III) has submitted an
                                interconnection request in accordance
                                with the pro forma Large Generator
                                Interconnection Procedures promulgated
                                pursuant to section 35.28(f) of title
                                18, Code of Federal Regulations (or
                                successor regulations);
                            (iv) any requirements relating to
                        environmental reviews for--
                                    (I) independent transmission
                                projects; and
                                    (II) transmission projects within
                                existing rights-of-way; and
                            (v) the requirements described in section
                        8(p)(4) of the Outer Continental Shelf Lands
                        Act (43 U.S.C. 1337(p)(4)).
            (3) Amendment.--Section 8(p)(3) of the Outer Continental
        Shelf Lands Act (43 U.S.C. 1337(p)(3)) is amended--
                    (A) by striking ``, the Secretary shall issue a
                lease, easement, or right-of-way'' and inserting the
                following: ``(43 U.S.C. 1337 note; Public Law 109-58),
                the Secretary--
                    ``(A) shall issue a lease or easement''; and
                    (B) in subparagraph (A) (as so designated)--
                            (i) by striking ``lease, easement, or
                        right-of-way'' and inserting ``lease or
                        easement''; and
                            (ii) by striking the period at the end and
                        inserting the following: ``; and
                    ``(B) may issue a right-of-way on a competitive or
                noncompetitive basis, as the Secretary determines to be
                appropriate.''.

       Subtitle G--Department of Energy Nuclear Transparency Act

SEC. 2261. PUBLIC ANNOUNCEMENT REQUIREMENTS FOR DEPARTMENT OF ENERGY
              ACTIONS RELATING TO CERTAIN NUCLEAR FACILITIES.

    (a) Alterations to Directives and Safety Standards.--
            (1) Public announcement.--Not later than 72 hours after
        altering a directive or safety standard relating to covered DOE
        nuclear facilities, the Secretary of Energy shall post, on a
        publicly accessible website of the Department of Energy, an
        announcement regarding such alteration.
            (2) Inclusion.--Each announcement under paragraph (1) shall
        include a summary of how the relevant directive or safety
        standard was altered.
    (b) Documented Safety Analysis.--
            (1) Public announcement.--Not later than 72 hours after
        issuing any preliminary documented safety analysis or
        documented safety analysis with respect to a covered DOE
        nuclear facility, the Secretary of Energy shall post, on a
        publicly accessible website of the Department of Energy, an
        announcement regarding the issuance of such preliminary
        documented safety analysis or documented safety analysis.
            (2) Inclusion.--
                    (A) Analysis.--Subject to subparagraph (B), each
                announcement under paragraph (1) shall include the
                relevant preliminary documented safety analysis or
                documented safety analysis.
                    (B) Commercially sensitive or controlled
                information.--The Secretary of Energy may modify a
                preliminary documented safety analysis or documented
                safety analysis included in an announcement under
                paragraph (1) only to ensure that such preliminary
                documented safety analysis or documented safety
                analysis does not include any commercially sensitive
                information, classified information, unclassified
                controlled nuclear information, or controlled
                unclassified information.
    (c) Authorizations.--Not later than 72 hours after entering into an
agreement to authorize a covered DOE nuclear facility, the Secretary of
Energy shall post, on a publicly accessible website of the Department
of Energy, an announcement regarding such agreement, including
information regarding any conditions applying to such agreement.
    (d) Report.--Not later than January 31 of each year, the Secretary
of Energy shall submit to the Committee on Energy and Commerce of the
House of Representatives and the Committee on Energy and Natural
Resources of the Senate a report detailing any activities the Secretary
of Energy took to authorize covered DOE nuclear facilities during the
previous calendar year.
    (e) Definitions.--In this section:
            (1) Covered doe nuclear facility.--The term ``covered DOE
        nuclear facility'' means any of the Hazard Category 1, 2, and 3
        DOE nuclear facilities (as such term is defined in section
        830.3(a) of title 10, Code of Federal Regulations (or a
        successor regulation)) that the Secretary of Energy holds
        authority over pursuant to section 110 a. of the Atomic Energy
        Act of 1954 (42 U.S.C. 2140(a)).
            (2) Documented safety analysis; preliminary documented
        safety analysis.--The terms ``documented safety analysis'' and
        ``preliminary documented safety analysis'' have the meanings
        given such terms, respectively, in section 830.3(a) of title
        10, Code of Federal Regulations (or a successor regulation).

                    TITLE III--HISTORIC PRESERVATION

SEC. 2301. HISTORIC PRESERVATION.

    (a) Program Evaluation.--
            (1) State programs.--Section 302302 of title 54, United
        States Code, is amended--
                    (A) in subsection (a)--
                            (i) in the subsection heading, by striking
                        ``Occcur'' and inserting ``Occur''; and
                            (ii) by striking ``4'' and inserting ``2'';
                    (B) in subsection (b)--
                            (i) by striking ``If'' and inserting the
                        following:
            ``(1) In general.--If'';
                            (ii) in paragraph (1) (as so designated),
                        by striking ``within a reasonable period of
                        time'' and inserting ``within 2 years of the
                        date of the disapproval''; and
                            (iii) by adding at the end the following:
            ``(2) Compliance with timelines.--A State program shall not
        be considered consistent with this division under paragraph (1)
        if the applicable State Historic Preservation Officer does not
        regularly comply with timelines for consultation, complete
        consultation expeditiously, or meet required metrics under this
        division.
            ``(3) Disapproval.--If the Secretary disapproves of a State
        program or a major aspect of a State program under paragraph
        (1), the Secretary shall require the suspension in whole or in
        part of--
                    ``(A) any contracts and cooperative agreements
                among the Secretary and the applicable State and State
                Historic Preservation Officer; and
                    ``(B) any grants distributed through the Historic
                Preservation Fund to the applicable State and State
                Historic Preservation Officer.
            ``(4) Review.--If the Secretary determines under paragraph
        (1) that a State program remains not consistent, or has not
        made acceptable progress towards becoming consistent, with this
        division within the 2-year timeline described in that
        paragraph, the Secretary shall assume all or part of the
        functions of the State Historic Preservation Officer until the
        date on which the State Historic Preservation Officer
        demonstrates that the State program is consistent under
        paragraph (1).''; and
                    (C) in subsection (d)(2)--
                            (i) in the matter preceding subparagraph
                        (A), by inserting ``shall'' after
                        ``Secretary'';
                            (ii) in subparagraph (A)--
                                    (I) by striking ``may conduct
                                periodic fiscal audits'' and inserting
                                ``not less frequently than every 4
                                years, conduct fiscal audits''; and
                                    (II) by striking ``as needed''; and
                            (iii) in subparagraph (B), by striking
                        ``shall''.
            (2) Tribal programs.--
                    (A) In general.--Chapter 3027 of title 54, United
                States Code, is amended by adding at the end the
                following:
``Sec. 302707. Program evaluation
    ``(a) When Evaluation Should Occur.--Periodically, but not less
frequently than every 2 years after the date on which a tribal program
has been approved to assume functions and responsibilities under
section 302702, the Secretary, in consultation with the Council under
applicable provisions of this division, and in cooperation with the
Tribal Historic Preservation Officer, shall evaluate the tribal program
to determine whether the tribal program is consistent with this
division.
    ``(b) Disapproval of Program.--
            ``(1) In general.--If, at any time, the Secretary
        determines that a major aspect of a tribal program is not
        consistent with this division, the Secretary shall disapprove
        the tribal program and suspend in whole or in part contracts or
        cooperative agreements with the Indian tribe and the Tribal
        Historic Preservation Officer under this division.
            ``(2) Compliance with timelines.--A tribal program shall
        not be considered consistent with this division under paragraph
        (1) if the applicable Tribal Historic Preservation Officer does
        not regularly comply with timelines for consultation, complete
        consultation expeditiously, or meet required metrics under this
        division.
            ``(3) Corrective action.--Before the Secretary disapproves
        of a major aspect of a tribal program or suspends in whole or
        in part any contract or cooperative agreement with an Indian
        tribe and the Tribal Historic Preservation Officer pursuant to
        paragraph (1), the Secretary shall--
                    ``(A) provide to the Indian tribe and the Tribal
                Historic Preservation Officer a written determination,
                including an explanation and reasoning for the
                determination, with respect to the finding that is the
                basis for possible disapproval;
                    ``(B) offer relevant technical assistance to the
                Indian tribe and the Tribal Historic Preservation
                Officer to aid the Indian tribe and the Tribal Historic
                Preservation Officer in becoming consistent with this
                division;
                    ``(C) allow at least 180 days for the Indian tribe
                and the Tribal Historic Preservation Officer to submit
                to the Secretary a corrective action plan to return the
                tribal program to consistency with this division within
                2 years of the date on which the determination is
                provided under subparagraph (A); and
                    ``(D) provide to the Indian tribe and the Tribal
                Historic Preservation Officer a reasonable opportunity
                to implement an accepted corrective action plan.
            ``(4) Disapproval.--If, after the corrective action plan in
        paragraph (3) is implemented, the Secretary determines a major
        aspect of a tribal program remains inconsistent with this
        division on the date that is 2 years after the date of the
        determination under paragraph (3)(A), the Secretary shall
        require the suspension in whole or in part of--
                    ``(A) any contracts or cooperative agreements among
                the Secretary and the applicable Indian tribe and
                Tribal Historic Preservation Officer funded under
                section 303102 or 302703; and
                    ``(B) any grants distributed through the Historic
                Preservation Fund to the applicable Indian tribe and
                Tribal Historic Preservation Officer funded under
                section 303102 or 302703.
            ``(5) Reinstatement.--The Secretary shall establish a
        process under which an Indian tribe or Tribal Historic
        Preservation Officer may--
                    ``(A) demonstrate that a tribal program has been
                brought into compliance with this division; and
                    ``(B) obtain--
                            ``(i) reinstatement of the tribal program;
                        and
                            ``(ii) restoration of eligibility for any
                        contracts, cooperative agreements, and grants
                        suspended under paragraph (4).
            ``(6) Savings provision.--Nothing in this subsection--
                    ``(A) authorizes the Secretary to consult on behalf
                of an Indian tribe; or
                    ``(B) relieves a Federal agency of the obligation
                to consult with an Indian tribe under section
                302706(b).
    ``(c) Oversight.--
            ``(1) In general.--The Secretary, in consultation with
        Tribal Historic Preservation Officers, shall establish
        oversight methods to ensure tribal program consistency and
        quality without imposing undue review burdens on Tribal
        Historic Preservation Officers.
            ``(2) Technical assistance.--At the request of an Indian
        tribe, the Secretary, in consultation with the applicable
        Tribal Historic Preservation Officer, shall provide technical
        assistance, training, and capacity support to achieve the
        purpose described in paragraph (1).
    ``(d) Fiscal Audit and Management System.--
            ``(1) Substitution for comparable federal systems.--At the
        discretion of the Secretary, a system of fiscal audit and
        management of the Indian tribe may be substituted for
        comparable Federal systems, subject to the conditions that the
        system of the Indian tribe--
                    ``(A) establishes and maintains substantially
                similar accountability standards; and
                    ``(B) provides for independent professional peer
                review.
            ``(2) Fiscal audits and review by secretary.--The Secretary
        shall--
                    ``(A) not less frequently than every 4 years,
                conduct periodic fiscal audits of tribal programs
                approved under this chapter; and
                    ``(B) ensure that the tribal programs meet
                applicable accountability standards.
            ``(3) ISDEAA audit substitution.--An audit conducted to
        meet the requirements of section 5 of the Indian Self-
        Determination and Education Assistance Act (25 U.S.C. 5305) of
        a tribal program shall meet the requirements of this
        subsection, subject to the requirement that the audit shall be
        submitted to each of the Director, the Director of the Bureau
        of Indian Affairs, and the Council.''.
            (3) Conforming amendment.--Section 302702 of title 54,
        United States Code, is amended, in the matter preceding
        paragraph (1), by striking ``302302 and 302303'' and inserting
        ``302303 and 302707''.
            (4) Clerical amendment.--The table of sections for chapter
        3027 of title 54, United States Code, is amended by adding at
        the end the following:

``302707. Program evaluation.''.
    (b) Effect of Undertaking on Historic Property.--Section 306108 of
title 54, United States Code, is amended--
            (1) in the second sentence, by striking ``The head of the
        Federal agency'' and inserting the following:
            ``(2) Opportunity to comment.--The head of any Federal
        agency described in paragraph (1)'';
            (2) in the first sentence, by striking ``The head of any
        Federal agency having direct or indirect'' and inserting the
        following:
    ``(b) Adverse Effect of the Undertaking.--
            ``(1) In general.--The head of any Federal agency having
        direct'';
            (3) by inserting before subsection (b) (as so designated)
        the following:
    ``(a) Definitions.--In this section:
            ``(1) Adverse effect of the undertaking.--
                    ``(A) In general.--The term `adverse effect of the
                undertaking' means a consequence of an undertaking
                that--
                            ``(i) is reasonably foreseeable; and
                            ``(ii) directly alters the characteristics
                        of a historic property in a manner that would
                        diminish the integrity of the location, design,
                        setting, materials, workmanship, or association
                        of the historic property.
                    ``(B) Exclusions.--The term `adverse effect of the
                undertaking' does not include--
                            ``(i) any visual, atmospheric, or audible
                        element, unless the visual, atmospheric, or
                        audible element would have a direct impact on a
                        historic property that would significantly
                        diminish the eligible characteristics of the
                        historic property;
                            ``(ii) any temporary alteration to a
                        historic property that is limited to the time
                        it takes to complete an undertaking; or
                            ``(iii) any effect on a portion of the
                        historic property other than an adverse effect
                        to the character-defining features, such as
                        contributing elements, cultural-use locations,
                        or access points, that significantly contribute
                        to the qualification of the property for
                        inclusion on the National Register.
            ``(2) Area of potential effects.--
                    ``(A) In general.--The term `area of potential
                effects' means the area within which an undertaking may
                cause an effect described in paragraph (1)(A).
                    ``(B) Exclusion.--The term `area of potential
                effects' does not include any geographic area affected
                solely by a portion of a project, activity, or program
                that is not subject to Federal control and
                responsibility.
            ``(3) Made public.--The term `made public', with respect to
        a final agency action, means that the final agency action is
        published in a single location on the primary website of the
        applicable Federal agency with--
                    ``(A) hyperlinks to the final agency action
                prominently displayed on the website; and
                    ``(B) the date of initial publication of the final
                agency action displayed and maintained on the website.
            ``(4) Reasonably foreseeable.--
                    ``(A) In general.--The term `reasonably
                foreseeable', with respect to an adverse effect of the
                undertaking, means an effect of the undertaking that
                shares a reasonably close causal relationship to, and
                is proximately caused by, the undertaking being
                considered.
                    ``(B) Exclusions.--The term `reasonably
                foreseeable', with respect to an adverse effect of the
                undertaking, does not include--
                            ``(i) any adverse effect of the undertaking
                        that is speculative or attenuated from the
                        undertaking; or
                            ``(ii) any adverse effect of the
                        undertaking relating to an unrelated prior,
                        separate existing, or potential future
                        undertaking.
            ``(5) State historic preservation officer.--The term `State
        Historic Preservation Officer' means--
                    ``(A) the official designated and appointed
                pursuant to section 302301(1) to administer the State
                Historic Preservation Program; or
                    ``(B) a representative designated to act for the
                official described in subparagraph (A).
            ``(6) Tribal historic preservation officer.--The term
        `Tribal Historic Preservation Officer' means the Tribal
        official designated pursuant to section 302702(2) who has
        assumed the duties of the State Historic Preservation Officer
        for purposes of compliance with subsection (b) within the
        boundaries of the applicable tribal land.
            ``(7) Undertaking.--
                    ``(A) In general.--The term `undertaking' means a
                project, activity, or program that--
                            ``(i) requires a Federal permit, license,
                        or approval; and
                            ``(ii) is subject to substantial Federal
                        control and responsibility.
                    ``(B) Exclusion.--The term `undertaking' does not
                include--
                            ``(i) any portion of a project, activity,
                        or program over which a Federal agency does not
                        exercise substantial control or responsibility
                        over the outcome;
                            ``(ii) a project, activity, or program for
                        which the only Federal involvement is a loan,
                        loan guarantee, grant (including a
                        capitalization grant), cost-share award, or
                        other form of financial assistance that is not
                        for the primary purpose of historic
                        preservation, subject to the condition that
                        this clause shall not apply to a project that
                        receives more than $10,000,000 of financial
                        assistance from the Department of
                        Transportation;
                            ``(iii) a project, activity, or program
                        that consists of minor or routine restoration,
                        rehabilitation, repair, maintenance,
                        stabilization, hazardous material remediation,
                        structure hardening, provision of handicapped
                        access, or other similar minor or routine
                        projects that do not diminish the integrity of
                        a historic property;
                            ``(iv) a project, activity, or program that
                        is a survey or work completed to conduct
                        consultations;
                            ``(v) a project, activity, or program
                        that--
                                    ``(I) is any alteration to a
                                historic property that is necessary for
                                public safety; and
                                    ``(II) does not diminish the
                                integrity of the historic property;
                            ``(vi) an activity or decision that is non-
                        discretionary and made in accordance with the
                        statutory authority of the Federal agency;
                            ``(vii) any--
                                    ``(I) renewal of a special use
                                permit on the expiration of the special
                                use permit if no substantive changes
                                are made from the original special use
                                permit; or
                                    ``(II) transfer of ownership of a
                                special use permit;
                            ``(viii) the implementation of, or any act
                        or omission under, a memorandum of agreement,
                        programmatic agreement, or other instrument
                        executed in connection with compliance with
                        this section, after the date on which a
                        determination has been made under subsection
                        (c); or
                            ``(ix) the continuation, operation,
                        maintenance, or post-approval implementation of
                        a project, activity, or program after the
                        determination has been made under subsection
                        (c), except that a subsequent discrete decision
                        of a Federal agency to amend or materially
                        modify a determination made under subsection
                        (c) is itself an undertaking, to the extent
                        provided in this section.''; and
            (4) by adding at the end the following:
    ``(c) Consultation.--
            ``(1) In general.--The responsibilities of a Federal agency
        under this section shall be limited to historic properties
        within the area of potential effects identified by the Federal
        agency.
            ``(2) Initiation and report.--
                    ``(A) Determination.--
                            ``(i) In general.--Not later than 30 days
                        after the date of receipt of a request for
                        review of a proposed project, activity, or
                        program under this section, the applicable
                        Federal official shall determine whether the
                        proposed project, activity, or program is an
                        undertaking subject to the requirements of this
                        section.
                            ``(ii) Potential effect.--If an applicable
                        Federal official determines that the applicable
                        undertaking is a type of activity that does not
                        have the potential to cause any effect on a
                        historic property (assuming a historic property
                        is present), the applicable Federal official
                        shall have no further obligation under this
                        section.
                            ``(iii) Applicability of other
                        provisions.--Subject to paragraph (7)(B)(ii),
                        if the review of an undertaking is governed by
                        a Federal agency program alternative
                        established under section 800.14 of title 36,
                        Code of Federal Regulations (or a successor
                        regulation), or this section, including an
                        alternate procedure, programmatic agreement,
                        exempted category, standard treatment, or
                        program comment, the applicable Federal
                        official shall carry out this paragraph in
                        accordance with that program alternative,
                        subject to paragraph (4), subparagraphs (A) and
                        (B) of paragraph (5), and paragraph (6).
                    ``(B) Report on undertaking.--
                            ``(i) In general.--If the applicable
                        Federal official determines under subparagraph
                        (A) that the proposed project, activity, or
                        program is an undertaking, the applicable
                        Federal official shall prepare a report that
                        includes--
                                    ``(I) a determination regarding the
                                area of potential effects for the
                                undertaking;
                                    ``(II) identification of any
                                historic properties within the area of
                                potential effects; and
                                    ``(III) description of the adverse
                                effects, if any, of the undertaking on
                                historic properties within the area of
                                potential effects.
                            ``(ii) Mandatory solicitation of
                        information.--On making a determination under
                        subparagraph (A)(i), the applicable Federal
                        official shall seek, discuss, as appropriate,
                        and incorporate, as applicable, information
                        from each applicable State Historic
                        Preservation Officer, Tribal Historic
                        Preservation Officer, Indian tribe, or Native
                        Hawaiian organization, local government, and
                        project, activity, or program applicant, if the
                        information is communicated to the applicable
                        Federal official not later than 30 days after
                        the date on which the Federal official submits
                        a request for such information.
                            ``(iii) Consultation.--
                                    ``(I) In general.--If the
                                applicable Federal official determines
                                under subparagraph (A) that a proposed
                                project, activity, or program is an
                                undertaking that is not subject to
                                clause (ii) or (iii) of subparagraph
                                (A), not later than 60 days after the
                                date of the determination under
                                subparagraph (A), the applicable
                                Federal official shall complete the
                                report in accordance with subclause
                                (II) and initiate consultation by
                                submitting the report for review to the
                                applicable State Historic Preservation
                                Officer, Tribal Historic Preservation
                                Officer, Indian tribe, Native Hawaiian
                                organization, local government, and
                                project, activity, or program applicant
                                under this division.
                                    ``(II) Requirements.--A complete
                                report under this clause--
                                            ``(aa) shall identify the
                                        area of potential effects for
                                        the undertaking;
                                            ``(bb) shall identify
                                        whether any historic properties
                                        are present within the
                                        applicable area of potential
                                        effects;
                                            ``(cc) if a historic
                                        property is present within the
                                        area of potential effects,
                                        shall--

                                                    ``(AA) consider
                                                only the portion of the
                                                property within the
                                                area of potential
                                                effects;

                                                    ``(BB) document any
                                                adverse effects of the
                                                undertaking, or
                                                determine that the
                                                proposed project,
                                                activity, or program is
                                                an undertaking for
                                                which there are no
                                                adverse effects of the
                                                undertaking;

                                                    ``(CC) identify
                                                prudent and feasible
                                                measures within the
                                                area of potential
                                                effects to avoid,
                                                minimize, or mitigate
                                                any adverse effects of
                                                the undertaking; and

                                                    ``(DD) identify and
                                                explain any case in
                                                which, as applicable,
                                                the applicable Federal
                                                official has decided
                                                not to require such
                                                prudent and feasible
                                                measures because, in
                                                the sole discretion of
                                                the applicable Federal
                                                official and as
                                                otherwise allowed by
                                                law, other
                                                considerations outweigh
                                                the consideration of
                                                historic preservation
                                                as to any or all
                                                adverse effects of the
                                                undertaking; and

                                            ``(dd) shall not identify
                                        measures described in item
                                        (cc)(CC) that are not prudent
                                        or would occur outside the area
                                        of potential effects, unless
                                        the project, activity, or
                                        program applicant has submitted
                                        a written request for
                                        alternative mitigation
                                        measures.
            ``(3) Determination.--
                    ``(A) In general.--Not later than 90 days after the
                date of submission of a report under paragraph
                (2)(B)(iii)(I), unless a shorter timeline is agreed to
                by the State Historic Preservation Officer or Tribal
                Historic Preservation Officer and each applicable
                Indian tribe, Native Hawaiian organization, and local
                government, the applicable Federal official, in
                consultation with the applicable State Historic
                Preservation Officer and Tribal Historic Preservation
                Officer, Indian tribe, Native Hawaiian organization,
                and local government under this division, shall--
                            ``(i) determine, based on the report,
                        that--
                                    ``(I)(aa) historic properties are
                                not present; and
                                    ``(bb) the obligations of the
                                applicable Federal official under this
                                section shall be satisfied;
                                    ``(II)(aa) the adverse effects of
                                the undertaking would not so diminish
                                the integrity of the historic property
                                to the extent that the historic
                                property would be made ineligible for
                                listing on the National Register; and
                                    ``(bb) the obligations of the
                                Federal official under this section
                                shall be satisfied; or
                                    ``(III)(aa) in the sole discretion
                                of the Federal official and as
                                otherwise allowed by law, other
                                considerations outweigh the
                                consideration of historic preservation
                                as to any or all adverse effects of the
                                undertaking; and
                                    ``(bb) the obligations of the
                                Federal official under this section
                                shall be satisfied; or
                            ``(ii) reach an agreement with the
                        applicable State Historic Preservation Officer
                        and Tribal Historic Preservation Officer,
                        Indian tribe, Native Hawaiian organization,
                        local government, and project, activity, or
                        program applicant that describes how the
                        adverse effects of the undertaking would be
                        avoided, minimized, or mitigated.
                    ``(B) No agreement.--
                            ``(i) Consultation period.--If an agreement
                        is not reached under clause (ii) of
                        subparagraph (A) within the 90-day period
                        described in that subparagraph, during the 60-
                        day period beginning immediately after the end
                        of that 90-day period, there shall be a period
                        of consultation among the applicable Federal
                        official, State Historic Preservation Officer
                        and Tribal Historic Preservation Officer,
                        Indian tribe, Native Hawaiian organization, and
                        local government.
                            ``(ii) Formal advisory comments.--
                                    ``(I) Request.--If an agreement is
                                not reached under clause (i) within the
                                60-day period described in that clause,
                                the head of the Federal agency shall
                                request formal advisory comments from
                                the Council with respect to the
                                applicable undertaking.
                                    ``(II) Response.--Not later than 45
                                days after the date on which the
                                Council receives a request under
                                subclause (I), the Council shall submit
                                to the head of the Federal agency the
                                formal advisory comments requested.
                                    ``(III) Final determination.--Not
                                later than 30 days after the date on
                                which the head of the Federal agency
                                receives the formal advisory comments
                                from the Council under subclause (II),
                                the head of the Federal agency (or an
                                agency official delegated by the head
                                of the Federal agency) shall make a
                                final determination on the undertaking
                                that demonstrates how the formal
                                advisory comments were considered.
                                    ``(IV) Satisfaction of
                                obligations.--Effective on the date on
                                which a final determination is made
                                under subclause (III), the obligations
                                of the applicable Federal agency under
                                this section shall be satisfied.
                    ``(C) Multiple determinations.--If an undertaking
                involves multiple corridors or large land areas, the
                applicable Federal official may issue multiple
                determinations under subparagraph (A) in a phased
                process.
            ``(4) Lead federal agency.--
                    ``(A) In general.--If more than 1 Federal agency
                has jurisdiction over a project, activity, or program
                that is determined to be an undertaking, the 1 or more
                applicable Federal agencies shall designate a lead
                Federal agency to comply with the requirements of this
                subsection.
                    ``(B) Presumption.--If a lead Federal agency has
                been designated for purposes of complying with the
                National Environmental Policy Act of 1969 (42 U.S.C.
                4321 et seq.), the lead Federal agency designated for
                purposes of complying with that Act shall serve as the
                lead Federal agency for purposes of this subsection
                unless the applicable Federal agencies jointly
                determine that another Federal agency is better suited
                to carry out the responsibilities of the lead Federal
                agency under this subsection.
                    ``(C) Written request; designation by secretary.--
                If the 1 or more applicable Federal agencies do not
                designate a lead Federal agency under subparagraph (A)
                by the date that is 15 days after the date on which the
                applicable Federal agencies receive notice of a
                proposed undertaking--
                            ``(i) in the case of an undertaking
                        initiated by an applicant, the applicant may
                        submit to the Secretary a written request for
                        the Secretary to designate a lead Federal
                        agency; or
                            ``(ii) in the case of an undertaking
                        initiated by the Federal Government, the
                        Secretary shall designate a lead Federal
                        agency.
                    ``(D) Failure to sign programmatic agreement.--The
                failure of the head of a Federal agency that is not the
                lead Federal agency to be a signatory to a programmatic
                agreement under this subsection shall not affect the
                conduct of the project, activity, or program subject to
                the programmatic agreement.
            ``(5) Timelines for consultation.--
                    ``(A) Initiation.--If a project, activity, or
                program requires the preparation of an environmental
                document under the National Environmental Policy Act of
                1969 (42 U.S.C. 4321 et seq.), any consultation with
                respect to the project, activity, or program required
                for purposes of this subsection shall initiate not
                later than the date of initiation of the environmental
                review.
                    ``(B) Completion.--
                            ``(i) In general.--The consultation process
                        initiated under subparagraph (A) shall be
                        completed not later than the date on which the
                        applicable environmental document under section
                        107(g) of the National Environmental Policy Act
                        of 1969 (42 U.S.C. 4336a(g)) is completed with
                        respect to the undertaking, unless the
                        Secretary approves an extension of the deadline
                        due to extraordinary circumstances beyond the
                        control, and not due to any actions, of the
                        consulting parties.
                            ``(ii) Failure to complete by deadline.--If
                        the consultation process initiated under
                        subparagraph (A) is not complete by the later
                        of the deadline established under clause (i) or
                        the date extended under that clause, the
                        consultation requirement for purposes of this
                        subsection, each employee within the Senior
                        Executive Service (as defined in section 2101a
                        of title 5) that has supervisory authority over
                        personnel in a relevant Federal agency that has
                        a substantive role or responsibility in the
                        consultation, shall spend not less than 50
                        percent of the workweek, as determined pursuant
                        to title 5 or other applicable law, to remedy
                        the failure.
                            ``(iii) Causes of action.--
                                    ``(I) Right to petition.--A
                                project, activity, or program applicant
                                may obtain judicial review of the
                                compliance by a Federal agency with the
                                deadline established under clause (i)
                                by filing a complaint with a court of
                                competent jurisdiction in which a
                                substantial part of the applicable
                                proposed project, activity, or program
                                is situated.
                                    ``(II) Remedy.--If a court of
                                competent jurisdiction under this
                                clause finds that a Federal agency has
                                failed to act in accordance with this
                                subsection, the court shall--
                                            ``(aa) provide injunctive
                                        relief, as appropriate, to give
                                        effect to this subsection;
                                            ``(bb) retain jurisdiction
                                        to ensure compliance with any
                                        such relief; and
                                            ``(cc) set a schedule and
                                        deadline for the Federal agency
                                        to act as soon as practicable
                                        with respect to the injunctive
                                        relief, which shall not exceed
                                        90 days from the date on which
                                        the applicable order of the
                                        court is issued.
                                    ``(III) Expedited procedures; time
                                to decide.--The reviewing court under
                                this clause shall--
                                            ``(aa) establish an
                                        expedited schedule for briefing
                                        and disposition; and
                                            ``(bb) issue a decision as
                                        expeditiously as practicable,
                                        but not later than 120 days,
                                        after the date on which the
                                        applicable complaint is filed
                                        under subclause (I), absent
                                        extraordinary circumstances.
                    ``(C) Participation of state historic preservation
                officer or tribal historic preservation officer.--
                            ``(i) In general.--If the State Historic
                        Preservation Officer, Tribal Historic
                        Preservation Officer, Indian tribe, Native
                        Hawaiian organization, or local government
                        fails to respond within 30 days of receipt of a
                        request for review of any report or finding by
                        the applicable Federal official, the applicable
                        Federal official shall proceed to the
                        determination under paragraph (3)(A).
                            ``(ii) Subsequent involvement.--If a State
                        Historic Preservation Officer, Tribal Historic
                        Preservation Officer, Indian tribe, Native
                        Hawaiian organization, or local government that
                        fails to respond by the deadline described in
                        clause (i) re-enters the consultation process
                        required for purposes of this subsection, the
                        applicable Federal official--
                                    ``(I) shall not be required to
                                reconsider any previous report or
                                finding; and
                                    ``(II) may consult with the Council
                                in lieu of the State Historic
                                Preservation Officer or Tribal Historic
                                Preservation Officer.
                            ``(iii) No substantive objections.--If the
                        State Historic Preservation Officer, Tribal
                        Historic Preservation Officer, Indian tribe,
                        Native Hawaiian organization, local government,
                        or Council, as applicable, has entered the
                        consultation process required for purposes of
                        this subsection, but does not provide any
                        substantive objections by the date that is 45
                        days after the date of receipt of a report or
                        finding, the applicable Federal official shall
                        proceed to the determination under paragraph
                        (3)(A).
                            ``(iv) Substantive objections.--If the
                        State Historic Preservation Officer, Tribal
                        Historic Preservation Officer, Indian tribe,
                        Native Hawaiian organization, local government,
                        or Council, as applicable, has entered the
                        consultation process required for purposes of
                        this subsection and provides substantive
                        objections with respect to any of the matters
                        included in the applicable report under
                        subitems (AA) through (DD) of paragraph
                        (2)(B)(iii)(II)(cc) by the date that is 45 days
                        after the date of receipt of the report, not
                        later than 30 days after the date of receipt of
                        the objections, the applicable Federal
                        official--
                                    ``(I) shall provide a response
                                explaining how the Federal agency has
                                considered the substantive objections
                                in the report; and
                                    ``(II) may provide a supplemental
                                report.
                            ``(v) Fulfillment of consulting
                        obligations.--On the provision of a response
                        under clause (iv)(I), the obligation of the
                        applicable Federal official to consult for
                        purposes of this subsection shall be considered
                        to be fulfilled with respect to the report.
                            ``(vi) Agreement.--If a State Historic
                        Preservation Officer or Tribal Historic
                        Preservation Officer fails to respond to an
                        agreement under this subparagraph, the
                        applicable Federal official may enter into the
                        agreement with the Council in lieu of the State
                        Historic Preservation Officer or Tribal
                        Historic Preservation Officer.
                            ``(vii) Notice of final agency action.--For
                        any undertaking for which a report under
                        paragraph (2)(B) is required, the applicable
                        Federal official that completed the report and
                        conducted consultation pursuant to that
                        paragraph shall notify, as applicable, each
                        applicable State Historic Preservation Officer,
                        Tribal Historic Preservation Officer, Indian
                        tribe, Native Hawaiian organization, and local
                        government of the final agency action with
                        respect to which the report was prepared.
            ``(6) Coordination with nepa.--For any undertaking subject
        to the National Environmental Policy Act of 1969 (42 U.S.C.
        4321 et seq.), the applicable Federal official may use the
        preparation of a draft environmental document that the Federal
        agency prepares under that Act to comply with the report
        required under paragraph (2)(B) if the applicable Federal
        official--
                    ``(A) has notified each applicable State Historic
                Preservation Officer or Tribal Historic Preservation
                Officer, Indian tribe, Native Hawaiian organization,
                local government, and the Council of the intent to use
                the environmental document for that purpose; and
                    ``(B) determines that the draft environmental
                document includes each of the components required to be
                in the report under paragraph (2)(B).
            ``(7) Program alternatives.--
                    ``(A) By federal agency.--The head of any Federal
                agency shall, in consultation with the Council, develop
                and implement program alternatives, including an
                alternate procedure, programmatic agreement, exempted
                category, standard treatment, or program comment, to
                govern categories of undertakings that are--
                            ``(i) determined to normally have no
                        adverse effects of the undertaking;
                            ``(ii) similar and repetitive in nature; or
                            ``(iii) routine management activities
                        undertaken at Federal installations,
                        facilities, or other land management units.
                    ``(B) By state and tribal historic preservation
                officers.--
                            ``(i) In general.--A State Historic
                        Preservation Officer or a Tribal Historic
                        Preservation Officer may develop and implement
                        program alternatives similar to those developed
                        by Federal agencies under section 800.14 of
                        title 36, Code of Federal Regulations (or a
                        successor regulation), including an alternate
                        procedure, programmatic agreement, exempted
                        category, standard treatment, or program
                        comment, within their applicable jurisdiction
                        to govern categories of undertakings that are--
                                    ``(I) determined to normally have
                                no adverse effects of the undertaking;
                                or
                                    ``(II) similar and repetitive in
                                nature.
                            ``(ii) Multiple program alternatives.--If a
                        Federal program alternative is developed under
                        section 800.14 of title 36, Code of Federal
                        Regulations (or a successor regulation), and a
                        State Historic Preservation Officer or Tribal
                        Historic Preservation Officer develops a
                        program alternative under clause (i) to govern
                        the same type of undertakings, the Federal
                        agency shall apply the State or Tribal program
                        alternative, unless the applicable State
                        Historic Preservation Officer or Tribal
                        Historic Preservation Officer agrees to the
                        application of the Federal program alternative.
            ``(8) Qualified historic preservation officers.--The
        Secretary shall collaborate with Tribal Historic Preservation
        Officers, tribal leaders, and relevant nonprofit organizations
        to develop standard requirements for Tribal Historic
        Preservation Officers that reflects the traditional knowledge,
        expertise, and access to traditional cultural leaders required
        for a successful tribal historic preservation program.
            ``(9) Judicial review.--
                    ``(A) Definition of agency action.--In this
                paragraph, the term `agency action' has the meaning
                given the term in section 551 of title 5.
                    ``(B) Role of the court.--In reviewing a claim of
                whether an undertaking complies with the requirements
                of this division, a court--
                            ``(i) shall afford substantial deference to
                        the agency; and
                            ``(ii) may not substitute the judgment of
                        the court for the judgment of the agency.
                    ``(C) Remedy.--
                            ``(i) In general.--Except as provided in
                        clause (ii) and notwithstanding any other
                        provision of law, if a court determines that an
                        agency action does not comply with the
                        requirements of this division, the only remedy
                        the court may order is to remand, without
                        vacatur or issuance of an injunction, the
                        applicable agency action to the Federal agency
                        with--
                                    ``(I) specific instructions to
                                correct errors or deficiencies found by
                                the court; and
                                    ``(II) a reasonable schedule and
                                deadline for the agency to act on
                                remand, which shall not exceed 180 days
                                after the date on which the order of
                                the court was entered.
                            ``(ii) Preliminary injunctions.--
                                    ``(I) In general.--Notwithstanding
                                clause (i) and subject to subclause
                                (II), a court may issue a preliminary
                                injunction for the applicable agency
                                action when--
                                            ``(aa) there is a
                                        substantial likelihood the
                                        agency action violates a
                                        Federal law (other than this
                                        division or the National
                                        Environmental Policy Act of
                                        1969 (42 U.S.C. 4321 et seq.));
                                            ``(bb) necessary to prevent
                                        irreparable harm to the
                                        plaintiff;
                                            ``(cc) the balance of
                                        equities favors the plaintiff;
                                        and
                                            ``(dd) a preliminary
                                        injunction is in the public
                                        interest.
                                    ``(II) Requirements.--The effective
                                period of a preliminary injunction
                                issued by a court under subclause (I)
                                shall be not longer than the time the
                                court finds is reasonably necessary--
                                            ``(aa) for the correction
                                        of the violation described in
                                        subclause (I)(aa); and
                                            ``(bb) to prevent the
                                        irreparable harm described in
                                        subclause (I)(bb).
                    ``(D) Limitations on claims.--
                            ``(i) In general.--Notwithstanding chapter
                        7 of title 5, a claim described in subparagraph
                        (B) shall be barred unless--
                                    ``(I) except in a case in which a
                                shorter deadline is specified under
                                Federal law, the claim is filed not
                                later than 150 days after the later
                                of--
                                            ``(aa) the date on which
                                        the final agency action is made
                                        public; and
                                            ``(bb) the applicable State
                                        Historic Preservation Officer,
                                        Tribal Historic Preservation
                                        Officer, Indian tribe, Native
                                        Hawaiian organization, or local
                                        government is notified of the
                                        final agency action under
                                        paragraph (5)(C)(vii);
                                    ``(II) the claim is filed by a
                                party that has suffered or imminently
                                will suffer direct harm from the agency
                                action; and
                                    ``(III) in the case of an agency
                                action for which there was a public
                                comment period with respect to the
                                agency action for which the comment
                                period occurred after the date of
                                enactment of the Bipartisan American
                                Affordability and Jobs Act of 2026, the
                                claim--
                                            ``(aa) is filed by a party
                                        that submitted a substantive
                                        comment (excluding a form
                                        letter)--

                                                    ``(AA) during the
                                                public comment period
                                                by the noticed comment
                                                deadline; and

                                                    ``(BB) that was
                                                sufficiently detailed
                                                to put the applicable
                                                Federal agency on
                                                notice of the issue for
                                                which the party seeks
                                                review; and

                                            ``(bb) concerns the same
                                        subject matter raised in the
                                        comment submitted during the
                                        public comment period.
                            ``(ii) Application.--The requirements of
                        subclauses (II) and (III) of clause (i) shall
                        not apply with respect to a claim in which a
                        State Historic Preservation Officer, Tribal
                        Historic Preservation Officer, Indian tribe,
                        Native Hawaiian organization, or local
                        government has provided detailed notice in
                        writing during the consultation process, if
                        such a process occurred, that--
                                    ``(I) puts the applicable Federal
                                agency on notice of the agency action;
                                and
                                    ``(II) sufficiently identifies any
                                issues relating to that agency action
                                for which the party seeks review under
                                this paragraph.
                            ``(iii) Supplemental findings documents.--
                                    ``(I) In general.--If an agency
                                issues a supplemental findings document
                                in response to a court order remanding
                                an agency action, the deadline
                                described in clause (i)(I) shall be the
                                date on which the agency makes public
                                the supplemental findings document.
                                    ``(II) Limitation.--A claim for
                                review of an agency action described in
                                subparagraph (B) shall be limited to
                                information contained in the final
                                supplemental findings document that was
                                not contained in a previous findings
                                document.
                    ``(E) Procedural matters for claims.--
                            ``(i) Original jurisdiction.--Except with
                        respect to a claim brought under paragraph
                        (5)(B)(iii), and except as provided in section
                        19(b) of the Natural Gas Act (15 U.S.C.
                        717r(b)) or section 313(b) of the Federal Power
                        Act (16 U.S.C. 825l(b)), the court of appeals
                        of the United States circuit in which the
                        applicable undertaking is located shall have
                        original and exclusive jurisdiction over a
                        claim for review of an agency action described
                        in subparagraph (B).
                            ``(ii) Supplemental jurisdiction.--The
                        courts of appeals of the United States shall
                        have supplemental jurisdiction over other
                        claims related to the validity of the final
                        agency action at issue in the claim within the
                        original jurisdiction of the court of appeals.
                            ``(iii) Random assignment of cases.--To the
                        maximum extent practicable, a court of appeals
                        of the United States shall randomly assign
                        judges appointed, designated, or assigned to
                        sit as judges of the court to hear claims in a
                        manner to avoid the appearance of favoritism or
                        bias.
                            ``(iv) Deadline for resolution.--A court of
                        appeals of the United States shall render a
                        final judgment with respect to a claim for
                        review of an agency action described in
                        subparagraph (B) as expeditiously as possible.
            ``(10) Challenges to programmatic agreements.--
                    ``(A) In general.--A party that is not a signatory
                to a programmatic agreement entered into for purposes
                of this subsection may not bring a civil action to
                challenge the implementation of the programmatic
                agreement.
                    ``(B) Judicial review.--No court shall have
                jurisdiction to hear or consider any action pertaining
                to the implementation of a programmatic agreement
                entered into for purposes of this subsection that is
                brought by a party described in subparagraph (A).
    ``(d) No Post-deadline Requirement for Reinitiation.--The
identification of a property for, nomination of a property to, or
listing of a property on the National Register after the date on which
the head of the Federal agency initiates a review under this section
shall not require the head of the Federal agency to delay, reopen,
supplement, or otherwise modify the review or consultation process
under this section.''.
    (c) Conforming Amendment.--Section 306114 of title 54, United
States Code, is amended by striking the second sentence.

SEC. 2302. FUNDING FOR THE HISTORIC PRESERVATION FUND; GRANTS FOR
              TRIBAL HISTORIC PRESERVATION OFFICERS; ADDITIONAL
              FUNDING.

    (a) Funding for Historic Preservation Fund.--Section 303102 of
title 54, United States Code, is amended to read as follows:
``Sec. 303102. Funding
    ``For each of fiscal years 2027 through 2036, there is authorized
to be appropriated, from the unappropriated balance of the Historic
Preservation Fund on September 30, 2026, or the general fund of the
Treasury, $200,000,000 for deposit in the Historic Preservation
Fund.''.
    (b) Grants for Tribal Historic Preservation Officers.--Section
302703 of title 54, United States Code, is amended--
            (1) by striking ``In consultation'' and inserting the
        following:
    ``(a) In General.--In consultation''; and
            (2) by adding at the end the following:
    ``(b) Grant Program for Tribal Historic Preservation Officers.--
            ``(1) In general.--The Secretary shall establish a
        competitive grant program under which the Secretary shall award
        to Tribal Historic Preservation Officers grants to develop an
        online database to maintain--
                    ``(A) all records relating to the assumption by the
                applicable Indian tribe of the functions of the State
                Historic Preservation Officer under section 302702,
                including all determinations, findings, or agreements,
                and all supporting documentation; and
                    ``(B) a comprehensive list of properties of
                traditional religious or cultural importance to the
                Indian tribe.
            ``(2) Coordination required.--Tribal Historic Preservation
        Officers shall coordinate with the heads of Federal agencies
        and State Historic Preservation Officers to establish a system
        in which the database developed under paragraph (1) may be
        accessed by relevant Federal officials and State Historic
        Preservation Officers to conduct consultation under section
        306108.
            ``(3) Limitation.--Nothing in this section requires a
        recipient of a grant under this subsection to disclose
        information to the public about the location, character, or
        ownership of a historic property or property of traditional
        cultural or religious importance if the disclosure of the
        information may--
                    ``(A) cause significant harm or risk to the
                integrity of the property; or
                    ``(B) in the case of a property of traditional
                cultural or religious importance, impede the use of the
                property by practitioners.
            ``(4) Review.--Not later than 90 days after the end of the
        fiscal year in which funds from a grant are provided to a
        Tribal Historic Preservation Officer under this subsection, the
        applicable Tribal Historic Preservation Officer shall submit to
        the Secretary a report that describes--
                    ``(A) the use of the funds; and
                    ``(B) the status of the development of the online
                database using the grant funds.
            ``(5) Privacy.--Notwithstanding any other provision of law,
        information submitted to a database developed under this
        subsection and accessed by, shared among, or transmitted to or
        from an agency or State Historic Preservation Officer shall be
        exempt from disclosure under section 552(b)(3)(B) of title 5.
            ``(6) Authorization of appropriations.--There is authorized
        to be appropriated to the Secretary to carry out this
        subsection $20,000,000 for each of fiscal years 2027 through
        2030.''.

            DIVISION C--SURVIVOR JUSTICE TAX PREVENTION ACT

SEC. 3001. EXCLUSION FROM GROSS INCOME OF ANY DAMAGES, OTHER THAN
              PUNITIVE DAMAGES, RECEIVED ON ACCOUNT OF SEXUAL ACTS OR
              SEXUAL CONTACT.

    (a) In General.--Section 104(a)(2) of the Internal Revenue Code of
1986 is amended by striking ``on account of personal physical injuries
or physical sickness;'' and inserting ``on account of--
                    ``(A) personal physical injuries or physical
                sickness, or
                    ``(B) any sexual act (as defined in paragraph (2)
                of section 2246 of title 18, United States Code, as in
                effect on the date of the enactment of this
                subparagraph) or sexual contact (as defined in
                paragraph (3) of such section, as so in effect),
                whether or not there are medical records or observable
                injuries of such act or contact;''.
    (b) Burden of Proof With Respect to Whether Damages Are on Account
of Sexual Act or Sexual Contact.--Section 104 of such Code is amended
by redesignating subsection (d) as subsection (e) and by inserting
after subsection (c) the following new subsection:
    ``(d) Burden of Proof With Respect to Whether Damages Are on
Account of Sexual Act or Sexual Contact.--For purposes of subsection
(a)(2), if a decision or agreement states that any damages received
therefrom are on account of a sexual act or sexual contact referred to
in subsection (a)(2)(B)--
            ``(1) such statement shall be treated as credible evidence
        that such damages are so on account for purposes of section
        7491(a), and
            ``(2) the taxpayer shall be treated as having met the
        requirements of section 7491(a)(2) with respect to the issue of
        whether such damages are so on account.''.
    (c) Effective Date.--
            (1) In general.--The amendments made by this section shall
        apply to amounts received pursuant to decisions made, and
        agreements entered into, after the date of the enactment of
        this Act.
            (2) Special rule for decisions.--For purposes of paragraph
        (1), a decision shall be treated as made after the date of the
        enactment of this Act if the first payment pursuant to such
        decision is received after such date.
            (3) Special rule for agreements.--For purposes of paragraph
        (1), an agreement shall not be treated as entered into after
        the date of the enactment of this Act if such agreement
        replaces, supersedes, or revises an agreement entered into on
        or before such date.
    (d) No Inference With Respect to Effect of Medical Records or
Observable Injuries on Determinations With Respect to Personal Physical
Injuries or Physical Sickness.--No inference may be drawn from the
amendment made by subsection (a) (or from section 104(a)(2)(B) of the
Internal Revenue Code of 1986, as amended by subsection (a)) with
respect to whether the term ``personal physical injuries or physical
sickness'' as used in section 104(a)(2) of such Code includes injuries
or sickness with respect to which there are no medical records or
observable injuries.
    (e) Promotion of Public Awareness of Exclusion.--The Secretary of
the Treasury (or the Secretary's delegate), in consultation with the
Department of Justice Office on Violence Against Women and other
relevant Federal agencies, shall conduct a program to promote public
awareness of the exclusion from gross income provided by section
104(a)(2)(B) of the Internal Revenue Code of 1986, as amended by this
section.

            Attest:

                                                             Secretary.
119th CONGRESS

  2d Session

                               H.R. 2347

_______________________________________________________________________

                               AMENDMENT